400512. Transport engineering
Title | 400512. Transport engineering |
---|---|
Parent | 4005. Civil engineering |
Latest research outputs
Sort by Date Title
Analysis of a typical railway turnout sleeper system using grillage beam analogy
Manalo, Allan, Aravinthan, Thiru, Karunasena, Warna and Stevens, Nick. 2012. "Analysis of a typical railway turnout sleeper system using grillage beam analogy." Finite Elements in Analysis and Design. 48 (1), pp. 1376-1391. https://doi.org/10.1016/j.finel.2011.08.007Article
The use of road safety target setting in fatality and injury reduction
Somasundaraswaran, K., Bullen, F. and Ayers, R.. 2010. "The use of road safety target setting in fatality and injury reduction." 24th Australian Road Research Board Conference (ARRB 2010): Building on 50 Years of Road and Transport Research. Melbourne, Australia 12 - 15 Oct 2010 Melbourne, Australia.Paper
The road safety: a special sign for unfamiliar drivers
Somasundaraswaran, Kathirgamalingam. 2010. "The road safety: a special sign for unfamiliar drivers." Goh, Steven C. and Wang, Hao (ed.) 2010 Southern Region Engineering Conference (SREC 2010). Toowoomba, Australia 11 - 12 Nov 2010 Toowoomba, Australia.Paper
Relationships between rainfall intensity, duration and suspended particle washoff from an urban road surface
Brodie, Ian M. and Egodawatta, Prasanna. 2011. "Relationships between rainfall intensity, duration and suspended particle washoff from an urban road surface." Hydrology Research: an international journal. 42 (4), pp. 239-249. https://doi.org/10.2166/nh.2011.117Article
Accident statistics in Sri Lanka
Somasundaraswaran, Kathirgamalingam. 2006. "Accident statistics in Sri Lanka." IATSS Research. 30 (1), pp. 115-117.Article
Design and construction of low-cost, low-volume roads in Australia
Bullen, Frank. 2003. "Design and construction of low-cost, low-volume roads in Australia ." Transportation Research Record. 1819 , pp. 173-179. https://doi.org/10.3141/1819b-22Article
Results of surveys among drivers and customers of for-hire three-wheelers in five small towns in Sri Lanka
Somasundaraswaran, A. K.. 2008. "Results of surveys among drivers and customers of for-hire three-wheelers in five small towns in Sri Lanka." Asia Pacific Development Journal. 15 (1), pp. 119-135.Article
Online remote construction management trials in Queensland Department of Main Roads: a participant's perspective
Thorpe, David. 2003. "Online remote construction management trials in Queensland Department of Main Roads: a participant's perspective." Construction Innovation: information, process, management. 3 (2), pp. 65-79. https://doi.org/10.1108/14714170310814855Article
An analytical model for predication of crack spacing due to shrinkage in concrete pavements
Chen, G. and Baker, Graham. 2004. "An analytical model for predication of crack spacing due to shrinkage in concrete pavements." Journal of Structural Engineering. 130 (10), pp. 1529-1533. https://doi.org/10.1061/(ASCE)0733-9445(2004)130:10(1529)Article
Prioritisation of guardrail remedial works
Anderson, Troy and Ayers, Ron. 2006. "Prioritisation of guardrail remedial works." 22nd ARRB Conference: Research Into Practice. Canberra, Australia 29 Oct - 02 Nov 2006 Canberra, Australia.Paper