3302. Building


Title3302. Building
Parent33. Built Environment and Design

Latest research outputs

Sort by Date Title
Failure mechanisms of bridge infrastructure in an extreme flood event
Lebbe, Mohamed Farook Kalendher, Lokuge, Weena, Setunge, Sujeeva and Zhang, Kevin. 2014. "Failure mechanisms of bridge infrastructure in an extreme flood event." Li, Chun Qing, Setunge, Sujeeva and De Silva, Saman (ed.) 1st International Conference on Infrastructure Failures and Consequences (ICIFC 2014). Melbourne, Australia 16 - 20 Jul 2014 Melbourne, Australia.

Paper

Construction as biological cells: can construction cells be similar to biological cells?
Abeysekera, Vasantha and Shelke, Mayur G.. 2015. "Construction as biological cells: can construction cells be similar to biological cells?" Ahmed, Syed M., Xenidis, Yiannis, Azhar, Salman, Smith, Norma A., Yaris, Cat E. and Campbell, Shaunna (ed.) 8th International Conference on Construction in the 21st Century (CITC-8). Thessaloniki, Greece 27 - 30 May 2015 Greenville, North Caroina, USA.

Paper

Drivers affecting household residents’ water and related energy consumption in residential buildings
Enshassi, Adnan, Elzebdeh, Salam and Mohamed, Sherif. 2017. "Drivers affecting household residents’ water and related energy consumption in residential buildings ." International Journal of Building Pathology and Adaptation. 35 (2), pp. 159-175. https://doi.org/10.1108/IJBPA-01-2017-0002

Article

Construction as biological cells: implications of the biological cell cycle for managing construction
Abeysekera, Vasantha and Shelke, Mayur G.. 2015. "Construction as biological cells: implications of the biological cell cycle for managing construction ." Ahmed, Syed M., Xenidis, Yiannis, Azhar, Salman, Smith, Norma A., Yarris, Cat E. and Campbell, Shaunna (ed.) 8th International Conference on Construction in the 21st Century (CITC-8). Thessaloniki, Greece 27 - 30 May 2015 Geenville, North Carolina, USQ.

Paper

Wither monetary retentions for subcontract work? A theoretical framework for rationalising its use
Abeysekera, Vasantha. 2015. "Wither monetary retentions for subcontract work? A theoretical framework for rationalising its use ." Ahmed, Syed M., Xenidis, Yiannis, Azhar, Salman, Smith, Norma A., Yarris, Cat E. and Campbell, Shaunna (ed.) 8th International Conference on Construction in the 21st Century (CITC-8). Thessaloniki, Greece 27 - 30 May 2015 Greenville, North Carolina, USA.

Paper

Application of the Syllk model wiring an organisation for the capability of an online community of practice
Duffield, Stephen Mark. 2016. "Application of the Syllk model wiring an organisation for the capability of an online community of practice." VINE: The Journal of Information and Knowledge Management Systems. 46 (2), pp. 267-294. https://doi.org/10.1108/VJIKMS-09-2015-0052

Article

Sowing the seeds of success: the provision of a personalised study time management plan
Abeysekera, Vasantha and Abeysekera, Ashoka. 2015. "Sowing the seeds of success: the provision of a personalised study time management plan ." Ahmed, Syed M., Xenidis, Yiannis, Azhar, Salman, Smith, Norma A., Yarris, Cat E. and Campbell, Shaunna (ed.) 8th International Conference on Construction in the 21st Century (CITC-8). Thessaloniki, Greece 27 - 30 May 2015 Greenville, North Carolina, USA.

Paper

Life cycle energy analysis of eight residential houses in Brisbane, Australia
Guan, Lisa, Walmselya, Madeleine and Chen, Guangnan. 2015. "Life cycle energy analysis of eight residential houses in Brisbane, Australia." Procedia Engineering. 121, pp. 653-661. https://doi.org/10.1016/j.proeng.2015.08.1059

Article

Managing quality in construction: construction as biological cells
Abeysekera, Vasantha and Shelke, Mayur G.. 2013. "Managing quality in construction: construction as biological cells." Kajewski, Stephen, Manley, Karen and Hampson, Keith (ed.) 19th International CIB World Building Congress. Brisbane, Australia 05 - 09 May 2013 Brisbane, Australia.

Paper

Concurrency in BIM-Based Project Implementation: An Exploratory Study of Chongqing Jiangbei International Airport’s Terminal 3A
Utiome, Erezi, Mohamed, Sherif, Panuwatwanich, Kriengsak, Lin, Emerson and Hou, Lei. 2016. "Concurrency in BIM-Based Project Implementation: An Exploratory Study of Chongqing Jiangbei International Airport’s Terminal 3A ." 13th International Conference on Cooperative Design, Visualization, and Engineering (CDVE 2016). Sydney, Australia 24 - 27 Oct 2016 Australia. Springer. https://doi.org/10.1007/978-3-319-46771-9_33

Paper

Bushfire traps: the application of mesh screens to contain bushfires
Hashempour, Javad, Sharifian, Ahmad and Billingsley, John. 2015. "Bushfire traps: the application of mesh screens to contain bushfires." 2015 Fire Protection Australia Conference (FPA2015). Gold coast, Australia 25 - 26 Mar 2015

Paper

Future practitioners of project management: are we disciples of Stanley Kubrick or Ridley Scott?
Todhunter, Barrie. 2015. "Future practitioners of project management: are we disciples of Stanley Kubrick or Ridley Scott?" Young, Michael and Pasian, Beverly (ed.) Project management research: Asia-Pacific perspectives. Newcastle upon Tyne, United Kingdom. Cambridge Scholars Publishing. pp. 183-194

Edited book (chapter)

A review of enabling factors in construction industry productivity in an Australian environment
Hughes, Rami and Thorpe, David. 2014. "A review of enabling factors in construction industry productivity in an Australian environment." Construction Innovation: information, process, management. 14 (2), pp. 210-228. https://doi.org/10.1108/CI-03-2013-0016

Article

Signs to dogma: a Heideggerian view of how artefacts distort the project world
van der Hoorn, Bronte and Whitty, Stephen J.. 2015. "Signs to dogma: a Heideggerian view of how artefacts distort the project world." International Journal of Project Management. 33 (6), pp. 1206-1219. https://doi.org/10.1016/j.ijproman.2015.02.011

Article

Editorial
Olatunji, Oluwole. 2015. "Editorial." Proceedings of the institution of Civil Engineers: Management, Procurement and Law. 168 (5), pp. 203-204. https://doi.org/10.1680/jmapl.2015.168.5.203

Editorial

Evaluating the level of stakeholder involvement during the project planning processes of building projects
Heravi, Amirhossein, Coffey, Vaughan and Trigunarsyah, Bambang. 2015. "Evaluating the level of stakeholder involvement during the project planning processes of building projects." International Journal of Project Management. 33 (5), pp. 985-997. https://doi.org/10.1016/j.ijproman.2014.12.007

Article

Developing a systemic lessons learned knowledge model for organisational learning through projects
Duffield, Stephen and Whitty, S. Jonathan. 2015. "Developing a systemic lessons learned knowledge model for organisational learning through projects." International Journal of Project Management. 33 (2), pp. 311-324. https://doi.org/10.1016/j.ijproman.2014.07.004

Article

A lean strategy to performance measurement – reducing waste by measuring 'next' customer needs
Leong, Michelle S. and Tilley, Paul. 2008. "A lean strategy to performance measurement – reducing waste by measuring 'next' customer needs." Tzortzopoulos, Patricia and Kagioglou, Mike (ed.) 16th Annual Conference of the International Group for Lean Construction Safety, Quality and the Environment. Manchester, England 16 - 18 Jul 2008 Manchester, England.

Paper

Structural evaluation of concrete expanded polystyrene sandwich panels for slab applications
Bajracharya, R. M., Lokuge, W. P., Karunasena, W., Lau, K. T. and Mosallam, A. S.. 2013. "Structural evaluation of concrete expanded polystyrene sandwich panels for slab applications." Samali, Bijan, Attard, Mario M. and Song, Chongmin (ed.) 22nd Australasian Conference on the Mechanics of Structures and Materials (ACMSM22). Sydney, Australia 11 - 14 Dec 2012 London, United Kingdom.

Paper

The implementation of online information and communication technology (ICT) on remote construction projects
Weippert, A., Kajewski, S. L. and Tilley, P. A.. 2003. "The implementation of online information and communication technology (ICT) on remote construction projects." Logistics Information Management. 16 (5), pp. 327-340. https://doi.org/10.1108/09576050310499327

Article

Internet-based information and communication systems on remote construction projects: a case study analysis
Weippert, A., Kajewski, S. L. and Tilley, P. A.. 2002. "Internet-based information and communication systems on remote construction projects: a case study analysis." Construction Innovation: information, process, management. 2 (2), pp. 103-116. https://doi.org/10.1191/1471417502ci031

Article

Quantifying the time and cost associated with the request for information (RFI) process in construction
Mohamed, S., Tilley, P. A. and Tucker, S. N.. 1999. "Quantifying the time and cost associated with the request for information (RFI) process in construction." Construction Innovation: information, process, management. 7 (1), pp. 35-50.

Article

Design and documentation deficiency and its impact on steel construction
Tilley, P. A.. 1998. "Design and documentation deficiency and its impact on steel construction." Steel Construction: Journal of the Australian Institute of Steel Construction. 32 (1).

Article

Management versus leadership: where does the project manager stand?
Tilley, Paul A.. 1997. "Management versus leadership: where does the project manager stand?" Australian Project Manager. 17 (2), pp. 22-26.

Article

Agile is not the end-game of project management methodologies
McKenna, T. and Whitty, S. J.. 2013. "Agile is not the end-game of project management methodologies." 10th Annual Project Management Australia Conference (PMOz 2013): Projects Driving and Sustaining the Future of the Australian Economy. Melbourne, Australia 17 - 18 Sep 2013 Melbourne, Australia.

Paper

Do steering committees and boards constitute good project governance?
McGrath, S. K. and Whitty, S. J.. 2013. "Do steering committees and boards constitute good project governance?" 10th Annual Project Management Australia Conference (PMOz 2013): Projects Driving and Sustaining the Future of the Australian Economy. Melbourne, Australia 17 - 18 Sep 2013 Melbourne, Australia.

Paper

Complexity and project managers' competencies
Maylor, Harvey and Whitty, Stephen. 2007. "Complexity and project managers' competencies." 7th International Research Workshop on Project Management. Lille, France Aug 2007

Paper

The management of project management: a conceptual framework for project governance
Too, Eric G. and Weaver, Patrick. 2014. "The management of project management: a conceptual framework for project governance ." International Journal of Project Management. 32 (8), pp. 1382-1394. https://doi.org/10.1016/j.ijproman.2013.07.006

Article

Thinking in slow motion about project management
Whitty, Jonathan. 2013. "Thinking in slow motion about project management." Drouin, Nathalie, Muller, Ralf and Sankaran, Shankar (ed.) Novel approaches to organizational project management research: translational and transformational. Copenhagen, Denmark. Copenhagen Business School Press. pp. 95-116

Edited book (chapter)

A spatial temporal decision framework for adaptation to sea level rise
Sahin, Oz and Mohamed, Sherif. 2013. "A spatial temporal decision framework for adaptation to sea level rise." Environmental Modelling and Software. 46, pp. 129-141. https://doi.org/10.1016/j.envsoft.2013.03.004

Article

Future practitioners of project management – are we disciples of Stanley Kubrick or Ridley Scott?
Todhunter, Barrie. 2013. "Future practitioners of project management – are we disciples of Stanley Kubrick or Ridley Scott?" Project Perspectives. 35, pp. 50-55.

Article

Effectiveness of constructability concept in the provision of infrastructure assets
Saghatforoush, E., Trigunarsyah, B., Too, E. and Heravitorbati, A.. 2011. "Effectiveness of constructability concept in the provision of infrastructure assets." Cowled, Craig J. L. (ed.) 1st International Postgraduate Conference on Engineering, Designing and Developing the Built Environment for Sustainable Wellbeing (eddBE 2011). Brisbane, Australia 27 - 29 Apr 2011 Brisbane, Australia.

Paper

Extending constructability concept to include operation and maintenance issues
Saghatforoush, Ehsan, Trigunarsyah, Bambang, Too, Eric G. and Heravitorbati, Amirhossein. 2011. "Extending constructability concept to include operation and maintenance issues." Preece, C. N., Fathi, M. S., Padfield, R., Papargyropoulou, E., BinAbdullah, M. M. and Rogers, J. (ed.) 1st International Construction Business & Management Symposium (ICBMS2011). Kuala Lumpur, Malaysia 21 - 22 Sep 2011 Kuala Lumpur, Malaysia.

Paper

Sustainability factors in industrialised building system
Yunus, Riduan, Yang, Jay and Too, Eric. 2011. "Sustainability factors in industrialised building system." Raasakka, Ville (ed.) World Sustainable Building Conference (SB11): Sharing Knowledge to Improve Life for all. Helsinki, Finland 18 - 21 Oct 2011 Rotterdam, The Netherlands .

Paper

Project governance in Malaysia hillside developments
Too, Eric G., Adnan, Najwa and Trigunarsyah, Bambang. 2011. "Project governance in Malaysia hillside developments." Ahmed, Syed, Adnan, Hamimah, Panthi, Kamalesh, Azhar, Salman, Takim, Roshana and Bozai, Gazan (ed.) 6th International Conference on Construction in the 21st Century (CITC-6). Kuala Lumpur, Malaysia 05 - 07 Jul 2011 Greenville, NC. United States.

Paper

Green buildings: a framework for social sustainability
Too, Linda and Too, Eric G.. 2011. "Green buildings: a framework for social sustainability." Ahmed, Syed, Adnan, Hamimah, Panthi, Kamalesh, Azhar, Salman, Takim, Roshana and Bozai, Gazan (ed.) 6th International Conference on Construction in the 21st Century (CITC-6). Kuala Lumpur, Malaysia 05 - 07 Jul 2011 Greenville, NC. United States.

Paper

A framework for strategic infrastructure asset management
Too, Eric G.. 2010. "A framework for strategic infrastructure asset management." Amadi-Echendu, Joe E., Brown, Kerry, Willett, Roger and Mathew, Joseph (ed.) Definitions, concepts and scope of engineering asset management. London, United Kingdom. Springer. pp. 31-62

Edited book (chapter)

A conceptual framework for client financed construction and non-traditional approaches for financing construction work
Abeysekera, Vasantha. 2012. "A conceptual framework for client financed construction and non-traditional approaches for financing construction work." World Construction Conference 2012: Global Challenges in Construction Industry. Colombo, Sri Lanka 28 - 30 Jun 2012 Colombo, Sri Lanka.

Paper

Motivating the construction academic: a conceptual study
Abeysekera, Ashoka and Abeysekera, Vasantha. 2012. "Motivating the construction academic: a conceptual study." World Construction Conference 2012: Global Challenges in Construction Industry. Colombo, Sri Lanka 28 - 30 Jun 2012 Colombo, Sri Lanka.

Paper

Factors contributing to design-build (DB) project delivery system implementation in road infrastructure projects in Indonesia
Parami Dewi, Anak, Trigunarsyah, Bambang, Too, Eric and Coffey, Vaughan. 2012. "Factors contributing to design-build (DB) project delivery system implementation in road infrastructure projects in Indonesia." Ahmed, Syed M. (ed.) 3rd International Conference on Construction in Developing Countries (ICCIDC 2012): Advancing Civil, Architectural, and Construction Engineering and Management. Bangkok, Thailand 04 - 06 Jul 2012 Greenville, NC. United States.

Paper