A practical framework to facilitate constructability implementation using the integrated project delivery approach: a case study

Article


Jadidoleslami, Samereh, Saghatforoush, Ehsan, Heravi, Amirhossein and Preece, Christopher. 2022. "A practical framework to facilitate constructability implementation using the integrated project delivery approach: a case study." The International Journal of Construction Management. 22 (7), pp. 1225-1239. https://doi.org/10.1080/15623599.2019.1686834
Article Title

A practical framework to facilitate constructability implementation using the integrated project delivery approach: a case study

ERA Journal ID40463
Article CategoryArticle
AuthorsJadidoleslami, Samereh (Author), Saghatforoush, Ehsan (Author), Heravi, Amirhossein (Author) and Preece, Christopher (Author)
Journal TitleThe International Journal of Construction Management
Journal Citation22 (7), pp. 1225-1239
Number of Pages15
Year2022
Place of PublicationUnited Kingdom
ISSN1562-3599
2331-2327
Digital Object Identifier (DOI)https://doi.org/10.1080/15623599.2019.1686834
Web Address (URL)https://www.tandfonline.com/doi/full/10.1080/15623599.2019.1686834
Abstract

Having integrated contractual strategies for projects and developing a transparent and unambiguous contract is highly effective for properly implementation of constructability. This study uses integrated project delivery (IPD) as the most recent contractual delivery approach to facilitate easier constructability implementation in the construction industry. The aim of this study is to present a practical framework to reduce changes and duplications, and facilitate constructability through focusing on the IPD approach. A case study on mass housing projects in Tehran is applied to provide supportive research data. This study uses qualitative analyses of data from both literature and the case study. Previously, comprehensive studies have been done by the authors through conducting a meta-synthesis technique. Outputs of the study, which were barriers and solutions to facilitate constructability implementation, are used in this study as presumptions. Data was collected from in-depth interviews with expert, including owners, consultants and contractors. The results were classified and compared with each other through descriptive and pattern analyses using the NVIVO Software. As determining constructability of a project needs experience and expertise, lack of constructability can be due to late or improper decision making in planning and design. The outcome of this study shows that `IPD implementation facilitates such harmony and coordination. The case is from Tehran of Iran. Given the geographical restriction of this case study that was in Iran, there were not adequate experts in the field of IPD. Currently, in Iran, these concepts are just implemented in large projects. This study uses IPD as the most recent contractual delivery approach to facilitate easier constructability implementation in the construction industry. Having coordination between construction and pre-construction stages is very significant to reduce duplications and improve real implementation of designs.

Keywordsconstructability; integrated project delivery; masshousing projects; integration; coordination
Contains Sensitive ContentDoes not contain sensitive content
ANZSRC Field of Research 2020330202. Building construction management and project planning
Public Notes

Files associated with this item cannot be displayed due to copyright restrictions.

Byline AffiliationsTarbiat Modares University, Iran
University of the Witwatersrand, South Africa
School of Civil Engineering and Surveying
Abu Dhabi University, United Arab Emirates
Institution of OriginUniversity of Southern Queensland
Permalink -

https://research.usq.edu.au/item/q6q1w/a-practical-framework-to-facilitate-constructability-implementation-using-the-integrated-project-delivery-approach-a-case-study

  • 109
    total views
  • 11
    total downloads
  • 1
    views this month
  • 0
    downloads this month

Export as

Related outputs

Project manager's leadership behavioural practices - A systematic literature review
Rehan, Ashok, Thorpe, David and Heravi, Amirhossein. 2024. "Project manager's leadership behavioural practices - A systematic literature review." Asia Pacific Management Review. https://doi.org/10.1016/j.apmrv.2023.12.005
An Investigation of BIM Advantages in Analysing Claims Procedures Related to the Extension of Time and Money in the KSA Construction Industry
Thorpe, David, Abougamil, Reda Abdelshafy and Heravi, Amirhossein. 2023. "An Investigation of BIM Advantages in Analysing Claims Procedures Related to the Extension of Time and Money in the KSA Construction Industry ." Buildings. 14 (2). https://doi.org/10.3390/buildings14020426
Investigating the Source of Claims with the Importance of BIM Application on Reducing Construction Disputable Claims in KSA
Abougamil, Reda Abdelshafy, Thorpe, David and Heravi, Amirhossein. 2023. "Investigating the Source of Claims with the Importance of BIM Application on Reducing Construction Disputable Claims in KSA." Buildings. 13 (9). https://doi.org/10.3390/buildings13092219
Civil infrastructure damage and corrosion detection: an application of machine learning
Munawar, Hafiz Suliman, Ullah, Fahim, Shahzad, Danish, Heravi, Amirhossein, Qayyum, Siddra and Akram, Junaid. 2022. "Civil infrastructure damage and corrosion detection: an application of machine learning." Buildings. 12 (2). https://doi.org/10.3390/buildings12020156
Inspecting Buildings Using Drones and Computer Vision: A Machine Learning Approach to Detect Cracks and Damages
Munawar, Hafiz Suliman, Ullah, Fahim, Heravi, Amirhossein, Thaheem, Muhammad Jamaluddin and Maqsoom, Ahsen. 2022. "Inspecting Buildings Using Drones and Computer Vision: A Machine Learning Approach to Detect Cracks and Damages." Drones. 6 (1), pp. 1-23. https://doi.org/10.3390/drones6010005
An overview of the use of solar energy in building construction projects
Hojjatian, Mahsa, Heravi, Amirhossein and Asad Poor, Javad. 2021. "An overview of the use of solar energy in building construction projects." Creative City Design. 4 (2), pp. 33-39.
Application of deep learning on UAV-based aerial images for flood detection
Munawar, Hafiz Suliman, Ullah, Fahim, Qayyum, Siddra and Heravi, Amirhossein. 2021. "Application of deep learning on UAV-based aerial images for flood detection." Smart Cities. 4 (3), pp. 1220-1243. https://doi.org/10.3390/smartcities4030065
Providing an structure for risk assessment of residential projects against earthquake
Heravi, Amirhossein and Sarabi, Mahdiyeh. 2017. "Providing an structure for risk assessment of residential projects against earthquake." 2nd International Conference on Civil Engineering and Architecture and Urban Design. Kasem Bundit University, Bangkok 31 Aug 2017
Identification of barriers and providing solutions to implement project control system in building projects
Heravi, Amirhossein and Sarabi, Mahdiyeh. 2017. "Identification of barriers and providing solutions to implement project control system in building projects." 1st National Conference on Applied Researches in Sciences and Engineering. Mashhad, Iran 27 - 28 Jul 2017 Mashhad, Iran.
Identifying and prioritising factors impacting in court decisions for construction contract disputes
Bagherian Marandi, Navid, Ravanshadnia, Mehdi, Heravi, Amirhossein and Mehdizadeh, Hasan. 2021. "Identifying and prioritising factors impacting in court decisions for construction contract disputes." 12th International Congress on Civil Engineering. Mashhad, iran 12 - 14 Jul 2021 Iran.
Assessment of requirements for establishment of a framework to enhance implementation of quality practices in building projects
Heravitorbati, Amirhossein, Coffey, Vaughan and Trigunarsyah, Bambang. 2011. "Assessment of requirements for establishment of a framework to enhance implementation of quality practices in building projects." International Journal of Innovation, Management and Technology. 2 (6), pp. 465-470.
Evaluating the existing barriers in implementing constructability
Jadidoleslami, Samereh, Saghatforoush, Ehsan, Heravi, Amirhossein and Preece, Christopher. 2018. "Evaluating the existing barriers in implementing constructability." Civil Engineering Journal. 4 (12), pp. 2864-2875. https://doi.org/10.28991/cej-03091204
Evaluating the level of stakeholder involvement during the project planning processes of building projects
Heravi, Amirhossein, Coffey, Vaughan and Trigunarsyah, Bambang. 2015. "Evaluating the level of stakeholder involvement during the project planning processes of building projects." International Journal of Project Management. 33 (5), pp. 985-997. https://doi.org/10.1016/j.ijproman.2014.12.007
Effectiveness of constructability concept in the provision of infrastructure assets
Saghatforoush, E., Trigunarsyah, B., Too, E. and Heravitorbati, A.. 2011. "Effectiveness of constructability concept in the provision of infrastructure assets." Cowled, Craig J. L. (ed.) 1st International Postgraduate Conference on Engineering, Designing and Developing the Built Environment for Sustainable Wellbeing (eddBE 2011). Brisbane, Australia 27 - 29 Apr 2011 Brisbane, Australia.
Extending constructability concept to include operation and maintenance issues
Saghatforoush, Ehsan, Trigunarsyah, Bambang, Too, Eric G. and Heravitorbati, Amirhossein. 2011. "Extending constructability concept to include operation and maintenance issues." Preece, C. N., Fathi, M. S., Padfield, R., Papargyropoulou, E., BinAbdullah, M. M. and Rogers, J. (ed.) 1st International Construction Business & Management Symposium (ICBMS2011). Kuala Lumpur, Malaysia 21 - 22 Sep 2011 Kuala Lumpur, Malaysia.
Assessment of operability and maintainability success factors in provision of extended constructability principles
Saghatforoush, Ehsan, Trigunarsyah, Bambang and Too, Eric. 2012. "Assessment of operability and maintainability success factors in provision of extended constructability principles." 9th International Congress on Civil Engineering. Isfahan, Iran 08 - 10 May 2012
Examination of process to develop a framework for better implementation of quality practices in building projects
Heravitorbati, Amirhossein, Coffey, Vaughan, Trigunarsyah, Bambang and Saghatforoush, Ehsan. 2011. "Examination of process to develop a framework for better implementation of quality practices in building projects." 2nd International Conference on Construction and Project Management 2011 (ICCPM2011). Singapore 16 - 18 Sep 2011 Singapore.
Evaluating the influences of stakeholder management on construction project quality
Heravitorbati, Amirhossein, Coffey, Vaughan, Trigunarsyah, Bambang and Saghatforoush, Ehsan. 2011. "Evaluating the influences of stakeholder management on construction project quality." Preece, C. N., Fathi, M. S., Padfield, R., Papargyropoulou, E., BinAbdullah, M. M. and Rogers, J. (ed.) 1st International Construction Business & Management Symposium (ICBMS2011). Kuala Lumpur, Malaysia 21 - 22 Sep 2011 Kuala Lumpur, Malaysia.