Examination of process to develop a framework for better implementation of quality practices in building projects

Paper


Heravitorbati, Amirhossein, Coffey, Vaughan, Trigunarsyah, Bambang and Saghatforoush, Ehsan. 2011. "Examination of process to develop a framework for better implementation of quality practices in building projects." 2nd International Conference on Construction and Project Management 2011 (ICCPM2011). Singapore 16 - 18 Sep 2011 Singapore.
Paper/Presentation Title

Examination of process to develop a framework for better implementation of quality practices in building projects

Presentation TypePaper
AuthorsHeravitorbati, Amirhossein (Author), Coffey, Vaughan (Author), Trigunarsyah, Bambang (Author) and Saghatforoush, Ehsan (Author)
Journal or Proceedings TitleProceedings of the 2nd International Conference on Construction and Project Management 2011 (ICCPM2011)
Number of Pages5
Year2011
Place of PublicationSingapore
ISBN9789810891763
Web Address (URL) of Paperhttp://www.iccpm.org/?utm_source=researchbib
Conference/Event2nd International Conference on Construction and Project Management 2011 (ICCPM2011)
Event Details
2nd International Conference on Construction and Project Management 2011 (ICCPM2011)
Event Date
16 to end of 18 Sep 2011
Event Location
Singapore
Abstract

Quality, as well as project success, in construction projects should be capable of being regarded as the fulfillment of expectation of those contributors and stakeholders involved in such projects. Although a significant amount of quality practices have been introduced within the industry, establishment and attainment of reasonable levels of quality internationally in construction projects continues to be an ongoing problem. To date, some investigation into the introduction and improvement of quality practices and stakeholder management in the construction industry has been accomplished independently, but so far no major studies have been completed that examine comprehensively how quality management practices that particularly concentrate on the stakeholders' perspective of quality can be used to contribute to final project quality outcomes. This paper aims to examine the process for development of a framework for better involvement of stakeholders in quality planning and practices and subsequently to contribute to higher quality outcomes within construction projects. Through extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines stakeholders' viewpoint of project quality in order to promote the improvement of outcomes throughout a project's lifecycle. It proposes a set of arranged information as a basis for development of prospective framework which ultimately aims to improve project quality outcomes. The subsequent framework that will be developed from this research will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders' targets for implementation of quality practices and achievement of high quality outcomes on their future projects.

Keywordsproject quality, continuous improvement, stakeholder management, construction project delivery
ANZSRC Field of Research 2020330202. Building construction management and project planning
Public Notes

No evidence of copyright restrictions preventing deposit of Accepted version.

Byline AffiliationsQueensland University of Technology
Institution of OriginUniversity of Southern Queensland
Permalink -

https://research.usq.edu.au/item/q6q30/examination-of-process-to-develop-a-framework-for-better-implementation-of-quality-practices-in-building-projects

Download files


Accepted Version
  • 135
    total views
  • 62
    total downloads
  • 12
    views this month
  • 5
    downloads this month

Export as

Related outputs

An Empirical Study on Project Manager's Leadership Behavioral Practices Impacting Project Success - The Australian Construction Sector
Rehan, Ashok, Thorpe, David and Heravi, Amirhossein. 2024. "An Empirical Study on Project Manager's Leadership Behavioral Practices Impacting Project Success - The Australian Construction Sector." International Journal of Construction Education and Research. https://doi.org/10.1080/15578771.2024.2359378
A BIM Package with a NEC4 Contract Option to Mitigate Construction Disputes in the Kingdom of Saudi Arabia
Abougamil, Reda Abdelshafy, Thorpe, David and Heravi, Amirhossein. 2024. "A BIM Package with a NEC4 Contract Option to Mitigate Construction Disputes in the Kingdom of Saudi Arabia." Buildings. 14 (7). https://doi.org/10.3390/buildings14072009
Leadership practices and communication framework for project success - The construction sector
Rehan, Ashok, Thorpe, David and Heravi, Amirhossein. 2024. "Leadership practices and communication framework for project success - The construction sector." Organization, Technology and Management in Construction: an International Journal. 16, pp. 204-223.
Project success factors for leadership practices and communication: challenges in the construction sector
Rehan Ashok, Thorpe, David and Heravi, Amirhossein. 2024. "Project success factors for leadership practices and communication: challenges in the construction sector ." International Journal of Managing Projects in Business. 17 (3), pp. 1-29. https://doi.org/10.1108/IJMPB-12-2023-0279
A framework for leadership practices and communication in the context of the construction sector
Rehan, Ashok, Thorpe, David and Heravi, Amirhossein. 2024. "A framework for leadership practices and communication in the context of the construction sector." Project Leadership and Society. 5 (2024). https://doi.org/10.1016/j.plas.2024.100142
Project manager's leadership behavioural practices - A systematic literature review
Rehan, Ashok, Thorpe, David and Heravi, Amirhossein. 2024. "Project manager's leadership behavioural practices - A systematic literature review." Asia Pacific Management Review. 29 (2), pp. 165-178. https://doi.org/10.1016/j.apmrv.2023.12.005
An Investigation of BIM Advantages in Analysing Claims Procedures Related to the Extension of Time and Money in the KSA Construction Industry
Abougamil, Reda Abdelshafy, Thorpe, David and Heravi, Amirhossein. 2023. "An Investigation of BIM Advantages in Analysing Claims Procedures Related to the Extension of Time and Money in the KSA Construction Industry ." Buildings. 14 (2). https://doi.org/10.3390/buildings14020426
Investigating the Source of Claims with the Importance of BIM Application on Reducing Construction Disputable Claims in KSA
Abougamil, Reda Abdelshafy, Thorpe, David and Heravi, Amirhossein. 2023. "Investigating the Source of Claims with the Importance of BIM Application on Reducing Construction Disputable Claims in KSA." Buildings. 13 (9). https://doi.org/10.3390/buildings13092219
Civil infrastructure damage and corrosion detection: an application of machine learning
Munawar, Hafiz Suliman, Ullah, Fahim, Shahzad, Danish, Heravi, Amirhossein, Qayyum, Siddra and Akram, Junaid. 2022. "Civil infrastructure damage and corrosion detection: an application of machine learning." Buildings. 12 (2). https://doi.org/10.3390/buildings12020156
Inspecting Buildings Using Drones and Computer Vision: A Machine Learning Approach to Detect Cracks and Damages
Munawar, Hafiz Suliman, Ullah, Fahim, Heravi, Amirhossein, Thaheem, Muhammad Jamaluddin and Maqsoom, Ahsen. 2022. "Inspecting Buildings Using Drones and Computer Vision: A Machine Learning Approach to Detect Cracks and Damages." Drones. 6 (1), pp. 1-23. https://doi.org/10.3390/drones6010005
An overview of the use of solar energy in building construction projects
Hojjatian, Mahsa, Heravi, Amirhossein and Asad Poor, Javad. 2021. "An overview of the use of solar energy in building construction projects." Creative City Design. 4 (2), pp. 33-39.
A practical framework to facilitate constructability implementation using the integrated project delivery approach: a case study
Jadidoleslami, Samereh, Saghatforoush, Ehsan, Heravi, Amirhossein and Preece, Christopher. 2022. "A practical framework to facilitate constructability implementation using the integrated project delivery approach: a case study." The International Journal of Construction Management. 22 (7), pp. 1225-1239. https://doi.org/10.1080/15623599.2019.1686834
Application of deep learning on UAV-based aerial images for flood detection
Munawar, Hafiz Suliman, Ullah, Fahim, Qayyum, Siddra and Heravi, Amirhossein. 2021. "Application of deep learning on UAV-based aerial images for flood detection." Smart Cities. 4 (3), pp. 1220-1243. https://doi.org/10.3390/smartcities4030065
Providing an structure for risk assessment of residential projects against earthquake
Heravi, Amirhossein and Sarabi, Mahdiyeh. 2017. "Providing an structure for risk assessment of residential projects against earthquake." 2nd International Conference on Civil Engineering and Architecture and Urban Design. Kasem Bundit University, Bangkok 31 Aug 2017
Identification of barriers and providing solutions to implement project control system in building projects
Heravi, Amirhossein and Sarabi, Mahdiyeh. 2017. "Identification of barriers and providing solutions to implement project control system in building projects." 1st National Conference on Applied Researches in Sciences and Engineering. Mashhad, Iran 27 - 28 Jul 2017 Mashhad, Iran.
Identifying and prioritising factors impacting in court decisions for construction contract disputes
Bagherian Marandi, Navid, Ravanshadnia, Mehdi, Heravi, Amirhossein and Mehdizadeh, Hasan. 2021. "Identifying and prioritising factors impacting in court decisions for construction contract disputes." 12th International Congress on Civil Engineering. Mashhad, iran 12 - 14 Jul 2021 Iran.
Assessment of requirements for establishment of a framework to enhance implementation of quality practices in building projects
Heravitorbati, Amirhossein, Coffey, Vaughan and Trigunarsyah, Bambang. 2011. "Assessment of requirements for establishment of a framework to enhance implementation of quality practices in building projects." International Journal of Innovation, Management and Technology. 2 (6), pp. 465-470.
Evaluating the existing barriers in implementing constructability
Jadidoleslami, Samereh, Saghatforoush, Ehsan, Heravi, Amirhossein and Preece, Christopher. 2018. "Evaluating the existing barriers in implementing constructability." Civil Engineering Journal. 4 (12), pp. 2864-2875. https://doi.org/10.28991/cej-03091204
Implementing design build project delivery system in Indonesia road infrastructure projects
Parami Dewi, Anak Agung Diah, Too, Eric and Trigunarsyah, Bambang. 2011. "Implementing design build project delivery system in Indonesia road infrastructure projects ." CIB Working Commission 107: Construction In Developing Countries: Innovation and Sustainable Construction. Hanoi, Vietnam 01 - 03 Nov 2011 London, United Kingdom.
Evaluating the level of stakeholder involvement during the project planning processes of building projects
Heravi, Amirhossein, Coffey, Vaughan and Trigunarsyah, Bambang. 2015. "Evaluating the level of stakeholder involvement during the project planning processes of building projects." International Journal of Project Management. 33 (5), pp. 985-997. https://doi.org/10.1016/j.ijproman.2014.12.007
Sharia-compliant financing in Indonesia infrastructure projects
Rarasati, Ayomi Dita, Trigunarsyah, Bambang and Too, Eric. 2013. "Sharia-compliant financing in Indonesia infrastructure projects." Sofyan, Bondan T. (ed.) 13th International Conference on Quality in Research (QiR 2013): Exploring Innovation for Enhancement of Human Life and Environment. Yogyakarta, Indonesia 25 - 28 Jun 2013 Semarang, Indonesia.
The opportunity for implementing Islamic project financing to the Indonesian infrastructure development
Rarasati, Ayomi Dita, Trigunarsyah, Bambang and Too, Eric. 2013. "The opportunity for implementing Islamic project financing to the Indonesian infrastructure development." Gehlot, Rajat (ed.) International Islamic Finance Conference (IIFC 2013): Islamic Finance in a Changing World. Abu Dhabi, United Arab Emirates 14 - 16 Apr 2013 Bingley, United Kingdom.
Effectiveness of constructability concept in the provision of infrastructure assets
Saghatforoush, E., Trigunarsyah, B., Too, E. and Heravitorbati, A.. 2011. "Effectiveness of constructability concept in the provision of infrastructure assets." Cowled, Craig J. L. (ed.) 1st International Postgraduate Conference on Engineering, Designing and Developing the Built Environment for Sustainable Wellbeing (eddBE 2011). Brisbane, Australia 27 - 29 Apr 2011 Brisbane, Australia.
Extending constructability concept to include operation and maintenance issues
Saghatforoush, Ehsan, Trigunarsyah, Bambang, Too, Eric G. and Heravitorbati, Amirhossein. 2011. "Extending constructability concept to include operation and maintenance issues." Preece, C. N., Fathi, M. S., Padfield, R., Papargyropoulou, E., BinAbdullah, M. M. and Rogers, J. (ed.) 1st International Construction Business & Management Symposium (ICBMS2011). Kuala Lumpur, Malaysia 21 - 22 Sep 2011 Kuala Lumpur, Malaysia.
Project governance in Malaysia hillside developments
Too, Eric G., Adnan, Najwa and Trigunarsyah, Bambang. 2011. "Project governance in Malaysia hillside developments." Ahmed, Syed, Adnan, Hamimah, Panthi, Kamalesh, Azhar, Salman, Takim, Roshana and Bozai, Gazan (ed.) 6th International Conference on Construction in the 21st Century (CITC-6). Kuala Lumpur, Malaysia 05 - 07 Jul 2011 Greenville, NC. United States.
Islamic project financing implementation for sustainable infrastructure development in Indonesia
Rarasati, Ayomi Dita, Too, Eric, Trigunarsyah, Bambang and Cheung, Fiona. 2012. "Islamic project financing implementation for sustainable infrastructure development in Indonesia." Suthanaya, Putu Alit, Kumara, Nyoman Satya, Suardana, Ngakan Putu Gede, Ciawai, Yenni and Jayanti, Dewi (ed.) 2nd International Conference on Sustainable Technology Development (ICSTD 2012): Developing Sustainable Technology for a Better Future. Denpasar, Indonesia 31 Oct - 02 Nov 2012 Denpasar, Indonesia.
Factors contributing to design-build (DB) project delivery system implementation in road infrastructure projects in Indonesia
Parami Dewi, Anak, Trigunarsyah, Bambang, Too, Eric and Coffey, Vaughan. 2012. "Factors contributing to design-build (DB) project delivery system implementation in road infrastructure projects in Indonesia." Ahmed, Syed M. (ed.) 3rd International Conference on Construction in Developing Countries (ICCIDC 2012): Advancing Civil, Architectural, and Construction Engineering and Management. Bangkok, Thailand 04 - 06 Jul 2012 Greenville, NC. United States.
Assessment of operability and maintainability success factors in provision of extended constructability principles
Saghatforoush, Ehsan, Trigunarsyah, Bambang and Too, Eric. 2012. "Assessment of operability and maintainability success factors in provision of extended constructability principles." 9th International Congress on Civil Engineering. Isfahan, Iran 08 - 10 May 2012
Evaluating the influences of stakeholder management on construction project quality
Heravitorbati, Amirhossein, Coffey, Vaughan, Trigunarsyah, Bambang and Saghatforoush, Ehsan. 2011. "Evaluating the influences of stakeholder management on construction project quality." Preece, C. N., Fathi, M. S., Padfield, R., Papargyropoulou, E., BinAbdullah, M. M. and Rogers, J. (ed.) 1st International Construction Business & Management Symposium (ICBMS2011). Kuala Lumpur, Malaysia 21 - 22 Sep 2011 Kuala Lumpur, Malaysia.