An Investigation of BIM Advantages in Analysing Claims Procedures Related to the Extension of Time and Money in the KSA Construction Industry

Article


Abougamil, Reda Abdelshafy, Thorpe, David and Heravi, Amirhossein. 2023. "An Investigation of BIM Advantages in Analysing Claims Procedures Related to the Extension of Time and Money in the KSA Construction Industry ." Buildings. 14 (2). https://doi.org/10.3390/buildings14020426
Article Title

An Investigation of BIM Advantages in Analysing Claims Procedures Related to the Extension of Time and Money in the KSA Construction Industry

ERA Journal ID210216
Article CategoryArticle
AuthorsAbougamil, Reda Abdelshafy, Thorpe, David and Heravi, Amirhossein
Journal TitleBuildings
Journal Citation14 (2)
Article Number426
Number of Pages31
Year2023
PublisherMDPI AG
Place of PublicationSwitzerland
ISSN2075-5309
Digital Object Identifier (DOI)https://doi.org/10.3390/buildings14020426
Web Address (URL)https://www.mdpi.com/2075-5309/14/2/426
Abstract

The construction industry in the Kingdom of Saudi Arabia (KSA) is a significant sector in the Middle East, with annual expenditures exceeding USD 120 billion. It employs 15% of the work force and consumes more than 14% of the country’s energy resources. Despite the significant growth in the Saudi construction sector, it faces various challenges due to the rapid launch of mega projects, such as the Line project engaged with the NEOM project, as well as other new projects as part of the Saudi Vision 2030. The challenges might be limited to a shortage of skilled labourers, rising costs, construction disputes, and material shortages. This study aims to investigate claims management procedures under traditional practice and compare them with a proposed BIM package as an alternative solution to mitigate construction disputes. The objective of the study focuses on reducing the time consumed when analysing claims against the level of accuracy of the claims values. The proposed BIM model improves and streamlines the claims process through authentication. This study presents prospective and retrospective methods in delay analysis under an accepted programme. A questionnaire survey was conducted, and out of a total of 123 practitioners, 79 replied. The findings in the tables in this article reveal that there are demands and a growing awareness of BIM in the KSA construction industry. The results reveal that BIM can help to reduce potential disputes and can reduce overall project cost overruns.

Keywordsbuilding information modelling; Kingdom of Saudi Arabia; disputes; construction; contracts; procurement
Related Output
Is part ofAn Investigation of Using Advanced Technologies Such as BIM to Reduce Construction Disputable Claims
Contains Sensitive ContentDoes not contain sensitive content
ANZSRC Field of Research 2020400599. Civil engineering not elsewhere classified
Public Notes

This article is part of a UniSQ Thesis by publication. See Related Output.

Byline AffiliationsAcademic Registrar's Office
School of Surveying and Built Environment
Permalink -

https://research.usq.edu.au/item/z4xxx/an-investigation-of-bim-advantages-in-analysing-claims-procedures-related-to-the-extension-of-time-and-money-in-the-ksa-construction-industry

Download files


Published Version
  • 157
    total views
  • 52
    total downloads
  • 10
    views this month
  • 2
    downloads this month

Export as

Related outputs

An Empirical Study on Project Manager's Leadership Behavioral Practices Impacting Project Success - The Australian Construction Sector
Rehan, Ashok, Thorpe, David and Heravi, Amirhossein. 2025. "An Empirical Study on Project Manager's Leadership Behavioral Practices Impacting Project Success - The Australian Construction Sector." International Journal of Construction Education and Research. 21 (2), pp. 164-188. https://doi.org/10.1080/15578771.2024.2359378
Self-Assessment Responses for Project Managers/Leaders and Followers Assessment (project engineers, project supervisors, team members and senior managers) in the Australian Construction Industry
Rehan, Ashok and Thorpe, David. 2024. Self-Assessment Responses for Project Managers/Leaders and Followers Assessment (project engineers, project supervisors, team members and senior managers) in the Australian Construction Industry. Toowoomba. University of Southern Queensland. https://doi.org/10.26192/zqy96
A BIM Package with a NEC4 Contract Option to Mitigate Construction Disputes in the Kingdom of Saudi Arabia
Abougamil, Reda Abdelshafy, Thorpe, David and Heravi, Amirhossein. 2024. "A BIM Package with a NEC4 Contract Option to Mitigate Construction Disputes in the Kingdom of Saudi Arabia." Buildings. 14 (7). https://doi.org/10.3390/buildings14072009
Leadership practices and communication framework for project success - The construction sector
Rehan, Ashok, Thorpe, David and Heravi, Amirhossein. 2024. "Leadership practices and communication framework for project success - The construction sector." Organization, Technology and Management in Construction: an International Journal. 16, pp. 204-223. https://doi.org/10.2478/otmcj-2024-0016
Cyber Battle Management Systems (CBMS) is Considered as Systems of Systems (SoS) and Emergent Behavior is Present, where Viable System Model (VSM) only Controls System Variety
Seizovic, Aleksandar, Goh, Steven, Thorpe, David and Skoufa, Lucas. 2024. "Cyber Battle Management Systems (CBMS) is Considered as Systems of Systems (SoS) and Emergent Behavior is Present, where Viable System Model (VSM) only Controls System Variety." Applied Artificial Intelligence: an international journal. 38 (1). https://doi.org/10.1080/08839514.2024.2384333
Project success factors for leadership practices and communication: challenges in the construction sector
Rehan Ashok, Thorpe, David and Heravi, Amirhossein. 2024. "Project success factors for leadership practices and communication: challenges in the construction sector ." International Journal of Managing Projects in Business. 17 (3), pp. 1-29. https://doi.org/10.1108/IJMPB-12-2023-0279
A framework for leadership practices and communication in the context of the construction sector
Rehan, Ashok, Thorpe, David and Heravi, Amirhossein. 2024. "A framework for leadership practices and communication in the context of the construction sector." Project Leadership and Society. 5 (2024). https://doi.org/10.1016/j.plas.2024.100142
Emerging Technology and the Competency Requirements of Local Authority Engineering Asset Management Personnel - A Researchers Journey
Munn, Kylie, Goh, Steven and Thorpe, David. 2024. "Emerging Technology and the Competency Requirements of Local Authority Engineering Asset Management Personnel - A Researchers Journey." AMPEAK 2024 . Adelaide, Australia 14 - 17 Apr 2024 Australia.
Project manager's leadership behavioural practices - A systematic literature review
Rehan, Ashok, Thorpe, David and Heravi, Amirhossein. 2024. "Project manager's leadership behavioural practices - A systematic literature review." Asia Pacific Management Review. 29 (2), pp. 165-178. https://doi.org/10.1016/j.apmrv.2023.12.005
Investigating the Source of Claims with the Importance of BIM Application on Reducing Construction Disputable Claims in KSA
Abougamil, Reda Abdelshafy, Thorpe, David and Heravi, Amirhossein. 2023. "Investigating the Source of Claims with the Importance of BIM Application on Reducing Construction Disputable Claims in KSA." Buildings. 13 (9). https://doi.org/10.3390/buildings13092219
Cybernetics and battle management system (BMS) in network soldier system application
Seizovic, Aleksandar, Thorpe, David, Goh, Steven and Skoufer, L.ucas. 2023. "Cybernetics and battle management system (BMS) in network soldier system application." Australian Journal of Multi-Disciplinary Engineering. 19 (1), pp. 30-52. https://doi.org/10.1080/14488388.2023.2199600
Can Bamboo Become a Sustainable Building Material in Australia?
Miranda, Mari, Thorpe, David and Nguyen, Andy. 2022. "Can Bamboo Become a Sustainable Building Material in Australia?" 8th International Sustainable Ecological Engineering Design for Society Conference (SEEDS 2022). Bristol, United Kingdom 31 Aug - 02 Sep 2022 Bristol, United Kingdom.
Developing a Sustainable Urban Environment through Teaching Asset Management at a Postgraduate Level
Thorpe, David and Aghili, Nasim. 2022. "Developing a Sustainable Urban Environment through Teaching Asset Management at a Postgraduate Level." Gorse, Christopher, Scott, Lloyd, Booth, Colin and Dastbaz, Mohammad (ed.) 5th International Conference of Sustainable Ecological Engineering Design for Society (SEEDS 2020). Leeds, United Kingdom 02 - 03 Sep 2020 Cham, Switzerland. https://doi.org/10.1007/978-3-030-79450-7
Civil infrastructure damage and corrosion detection: an application of machine learning
Munawar, Hafiz Suliman, Ullah, Fahim, Shahzad, Danish, Heravi, Amirhossein, Qayyum, Siddra and Akram, Junaid. 2022. "Civil infrastructure damage and corrosion detection: an application of machine learning." Buildings. 12 (2). https://doi.org/10.3390/buildings12020156
Inspecting Buildings Using Drones and Computer Vision: A Machine Learning Approach to Detect Cracks and Damages
Munawar, Hafiz Suliman, Ullah, Fahim, Heravi, Amirhossein, Thaheem, Muhammad Jamaluddin and Maqsoom, Ahsen. 2022. "Inspecting Buildings Using Drones and Computer Vision: A Machine Learning Approach to Detect Cracks and Damages." Drones. 6 (1), pp. 1-23. https://doi.org/10.3390/drones6010005
Asset management competency requirements in Australian local government: a systematic literature review
Munn, Kylie, Goh, Steven, Basson, Marita and Thorpe, David. 2021. "Asset management competency requirements in Australian local government: a systematic literature review." Australasian Journal of Engineering Education. 26 (2), pp. 167-200. https://doi.org/10.1080/22054952.2021.1934262
Review of the use and development of Building Information Modelling software in the Architectural and Engineering industry - an Australian Perspective
van Neuren, Craig and Thorpe, David. 2021. "Review of the use and development of Building Information Modelling software in the Architectural and Engineering industry - an Australian Perspective." Gorse, Christopher, Scott, Lloyd and Booth, Colin (ed.) 7th International Sustainable Ecological Engineering Design for Society Conference (SEEDS 2021). Leeds, United Kingdom and Online Leeds, United Kingdom.
Managing Sustainable Asset Networks using Advanced Information Systems
Thorpe, David, Aghili, Nasim and van Neuren, Craig. 2021. "Managing Sustainable Asset Networks using Advanced Information Systems." Chattopadhyay, Gopi (ed.) 2021 International Conference on Maintenance and Intelligent Asset Management (ICMIAM 2021). Ballarat, Australia 12 - 15 Dec 2021 United States. https://doi.org/10.1109/ICMIAM54662.2021.9715219
Challenging students in teaching sustainable engineering - initiatives in the technology, sustainability and society course at USQ
Thorpe, David S. and Craig, Ian. 2019. "Challenging students in teaching sustainable engineering - initiatives in the technology, sustainability and society course at USQ." Goh, Steven (ed.) 30th Annual Conference of the Australasian Association for Engineering Education (AAEE2019). Brisbane, Australia 08 - 11 Dec 2019 Brisbane, Australia.
Sustainable development and management of low-volume road networks in Australia
Franzen, Thomas and Thorpe, David. 2020. "Sustainable development and management of low-volume road networks in Australia." Scott, Lloyd, Dastbaz, Mohammad and Gorse, Christopher (ed.) Sustainable Ecological Engineering Design: Selected Proceedings from the International Conference of Sustainable Engineering Design for Society (SEEDS 2019). Cham, Switzerland. Springer. pp. 51-63
Emergent behavior in the battle management system
Seizovic, Aleksandar, Thorpe, David and Goh, Steven. 2022. "Emergent behavior in the battle management system." Applied Artificial Intelligence: an international journal. 36 (1), pp. 1-24. https://doi.org/10.1080/08839514.2022.2151183
An overview of the use of solar energy in building construction projects
Hojjatian, Mahsa, Heravi, Amirhossein and Asad Poor, Javad. 2021. "An overview of the use of solar energy in building construction projects." Creative City Design. 4 (2), pp. 33-39.
A practical framework to facilitate constructability implementation using the integrated project delivery approach: a case study
Jadidoleslami, Samereh, Saghatforoush, Ehsan, Heravi, Amirhossein and Preece, Christopher. 2022. "A practical framework to facilitate constructability implementation using the integrated project delivery approach: a case study." The International Journal of Construction Management. 22 (7), pp. 1225-1239. https://doi.org/10.1080/15623599.2019.1686834
Application of deep learning on UAV-based aerial images for flood detection
Munawar, Hafiz Suliman, Ullah, Fahim, Qayyum, Siddra and Heravi, Amirhossein. 2021. "Application of deep learning on UAV-based aerial images for flood detection." Smart Cities. 4 (3), pp. 1220-1243. https://doi.org/10.3390/smartcities4030065
Providing an structure for risk assessment of residential projects against earthquake
Heravi, Amirhossein and Sarabi, Mahdiyeh. 2017. "Providing an structure for risk assessment of residential projects against earthquake." 2nd International Conference on Civil Engineering and Architecture and Urban Design. Kasem Bundit University, Bangkok 31 Aug 2017
Identification of barriers and providing solutions to implement project control system in building projects
Heravi, Amirhossein and Sarabi, Mahdiyeh. 2017. "Identification of barriers and providing solutions to implement project control system in building projects." 1st National Conference on Applied Researches in Sciences and Engineering. Mashhad, Iran 27 - 28 Jul 2017 Mashhad, Iran.
Identifying and prioritising factors impacting in court decisions for construction contract disputes
Bagherian Marandi, Navid, Ravanshadnia, Mehdi, Heravi, Amirhossein and Mehdizadeh, Hasan. 2021. "Identifying and prioritising factors impacting in court decisions for construction contract disputes." 12th International Congress on Civil Engineering. Mashhad, iran 12 - 14 Jul 2021 Iran.
Assessment of requirements for establishment of a framework to enhance implementation of quality practices in building projects
Heravitorbati, Amirhossein, Coffey, Vaughan and Trigunarsyah, Bambang. 2011. "Assessment of requirements for establishment of a framework to enhance implementation of quality practices in building projects." International Journal of Innovation, Management and Technology. 2 (6), pp. 465-470.
Evaluating the existing barriers in implementing constructability
Jadidoleslami, Samereh, Saghatforoush, Ehsan, Heravi, Amirhossein and Preece, Christopher. 2018. "Evaluating the existing barriers in implementing constructability." Civil Engineering Journal. 4 (12), pp. 2864-2875. https://doi.org/10.28991/cej-03091204
A human-centric participatory approach to energy-efficient housing based on occupants' collaborative image
Poor, Javad Asad, Goh, Yong Wah and Thorpe, David. 2021. "A human-centric participatory approach to energy-efficient housing based on occupants' collaborative image." Open House International. 46 (4), pp. 615-635. https://doi.org/10.1108/OHI-11-2020-0163
Introducing an innovation promotion model for construction projects
Fernando, Sam, Panuwatwanich, Kriengsak and Thorpe, David. 2021. "Introducing an innovation promotion model for construction projects." Engineering, Construction and Architectural Management. 28 (3), pp. 728-746. https://doi.org/10.1108/ECAM-03-2020-0145
Interrogating the Value of Learning by Extension in Enhancing Professional Quality: The Case of Australian and Venezuelan Engineers
Thorpe, David, Anteliz, Emilio A. and Danaher, Patrick Alan. 2019. "Interrogating the Value of Learning by Extension in Enhancing Professional Quality: The Case of Australian and Venezuelan Engineers." Trimmer, Karen, Newman, Tara and Padro, Fernando F. (ed.) Ensuring quality in professional education volume II: engineering pedagogy and international knowledge structures. Cham, Switzerland. Palgrave Macmillan. pp. 115-137
Analyzing client-led innovation enablers in Australian construction projects
Fernando, Sam, Panuwatwanich, Kriengsak and Thorpe, David. 2020. "Analyzing client-led innovation enablers in Australian construction projects." International Journal of Managing Projects in Business. 13 (2), pp. 388-408. https://doi.org/10.1108/IJMPB-08-2018-0150
Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia
Ibrahim, Maan Nihad, Thorpe, David and Mahmood, Muhammad Nateque. 2019. "Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia." Construction Innovation: information, process, management. 19 (4), pp. 550-569. https://doi.org/10.1108/CI-07-2018-0058
A Collaborative Image of Energy Efficient Housing via a Photo-Based Approach
Asad Poor, S. Javad, Thorpe, David and Goh, Yong Wah. 2019. "A Collaborative Image of Energy Efficient Housing via a Photo-Based Approach." International Journal of Housing Markets and Analysis. 13 (3), pp. 513-532. https://doi.org/10.1108/IJHMA-07-2019-0070
The key-components of sustainable housing design for Australian small size housing
Asad Poor, Javad, Thorpe, David and Goh, Yong. 2018. "The key-components of sustainable housing design for Australian small size housing." International Journal of GEOMATE. 15 (49), pp. 23-29. https://doi.org/10.21660/2018.49.3583
Meeting the challenges of engineering a sustainable future
Thorpe, David. 2018. "Meeting the challenges of engineering a sustainable future." International Journal of GEOMATE. 14 (43), pp. 8-18. https://doi.org/10.21660/2018.43.key2
Management of risk in delivering complex research and development projects: A case of the Research and Development Center of the United Arab Emirates Armed Forces
Alshehhi, Badr, Thorpe, David, Goh, Steven and Alkaabi, Sultan. 2018. "Management of risk in delivering complex research and development projects: A case of the Research and Development Center of the United Arab Emirates Armed Forces." Archives of Business Research. 6 (11), pp. 148-154. https://doi.org/10.14738/abr.611.5648
Uptake of advanced and sustainable engineering materials in civil infrastructure projects
Thorpe, David. 2015. "Uptake of advanced and sustainable engineering materials in civil infrastructure projects." International Journal of GEOMATE. 8 (1), pp. 1180-1185.
Management of risk in delivering complex research and development projects
Alshehhi, Badr, Thorpe, David, Goh, Steven and Alkaabi, Sultan. 2018. "Management of risk in delivering complex research and development projects." International Journal of Engineering Technology and Management. 5 (6), pp. 1-13.
Management of risk in delivering complex research and development projects: methodology chapter
Alshehhi, Badr, Thorpe, David, Goh, Steven and Alkaabi, Sultan. 2018. "Management of risk in delivering complex research and development projects: methodology chapter." Journal of Multidisciplinary Engineering Science and Technology. 5 (12), pp. 9243-9247.
Pesticide sustainable management practice (SMP) including porous biochar/geopolymer structures for contaminated water remediation
Craig, Ian P, Bundschuh, Jochen and Thorpe, David. 2015. "Pesticide sustainable management practice (SMP) including porous biochar/geopolymer structures for contaminated water remediation." International Journal of GEOMATE. 9 (18), pp. 1523-1527. https://doi.org/10.21660/2015.18.4216
Potential carbon emission reductions in Australian construction systems through bioclimatic principles
Sattary, Sattar and Thorpe, David. 2016. "Potential carbon emission reductions in Australian construction systems through bioclimatic principles." Sustainable Cities and Society. 23, pp. 105-113. https://doi.org/10.1016/j.scs.2016.03.006
Experiential learning approaches for developing professional skills in postgraduate engineering students
Thorpe, David. 2016. "Experiential learning approaches for developing professional skills in postgraduate engineering students." Rahman, Ataur and Ilic, Vojislav (ed.) International Conference on Engineering Education and Research (ICEER 2016). Sydney, Australia 21 - 24 Nov 2016 Parramatta, New South Wales.
Use of advanced and green construction materials by small and medium-sized enterprises
Wright, Christopher and Thorpe, David. 2015. "Use of advanced and green construction materials by small and medium-sized enterprises ." Raiden, Ani and Aboagye-Nimo, Emmanuel (ed.) 31st Annual Conference of the Association of Researchers in Construction Management (ARCOM 2015) . Lincoln, United Kingdom 07 - 09 Nov 2015 University of Reading, United Kingdom.
Reducing embodied energy in Australian building construction
Sattary, Sattar and Thorpe, David. 2011. "Reducing embodied energy in Australian building construction." Egbu, Charles and Lou, Eric (ed.) 27th Annual Conference of the Association of Researchers in Construction Management (ARCOM 2011). Bristol, United Kingdom 05 - 07 Sep 2011 United Kingdom.
Reflections on developing and implementing an advanced engineering project management course
Thorpe, David. 2015. "Reflections on developing and implementing an advanced engineering project management course." Oo, Aman, Patel, Arun, Hilditch, Tim and Chandran, Siva (ed.) 26th Annual Conference of the Australasian Association for Engineering Education (AAEE 2015). Geelong, Australia 06 - 09 Dec 2015 Geelong, Victoria, Australia.
Reflections on assessment: comparison of assessment processes for postgraduate engineering management courses
Thorpe, David. 2013. "Reflections on assessment: comparison of assessment processes for postgraduate engineering management courses." Lemckert, Charles, Jenkins, Graham and Lang-Lemckert, Susan (ed.) 24th Annual Conference of the Australasian Association for Engineering Education (AAEE 2013). Gold Coast, Australia 08 - 11 Dec 2013 Brisbane, Australia.
Project-based innovation: perspective of construction organizations
Fernando, Sam, Thorpe, David and Goh, Steven. 2014. "Project-based innovation: perspective of construction organizations." 11th International Conference on Business ManagementDriving Productivity through Innovation: From Thought to Practice. Nugegoda, Sri Lanka 12 Dec 2014 Sri Lanka.
Role of clients in driving innovation in construction projects
Fernando, S., Thorpe, D. and Goh, S.. 2013. "Role of clients in driving innovation in construction projects." Gonzalez, Vicente and Yiu, Tak Wing (ed.) 38th Annual Australasian Universities Building Education Association Conference. The University of Auckland, New Zealand 20 - 22 Nov 2013 New Zealand.
Risk management in delivering complex research & development projects: a case of the United Arab Emirates Armed Forces Research & Development Center
Alshehhi, Badr Ahmed, Thorpe, David and Goh, Steven. 2015. "Risk management in delivering complex research & development projects: a case of the United Arab Emirates Armed Forces Research & Development Center." 1st Asia Pacific Conference on Contemporary Research (APCCR 2015). Kuala Lumpur, Malaysia 03 - 04 Oct 2015 Gordon, NSW, Australia.
A review of enabling factors in construction industry productivity in an Australian environment
Hughes, Rami and Thorpe, David. 2014. "A review of enabling factors in construction industry productivity in an Australian environment." Construction Innovation: information, process, management. 14 (2), pp. 210-228. https://doi.org/10.1108/CI-03-2013-0016
Evaluating the level of stakeholder involvement during the project planning processes of building projects
Heravi, Amirhossein, Coffey, Vaughan and Trigunarsyah, Bambang. 2015. "Evaluating the level of stakeholder involvement during the project planning processes of building projects." International Journal of Project Management. 33 (5), pp. 985-997. https://doi.org/10.1016/j.ijproman.2014.12.007
Evaluating factors in sustainable road construction and management: a life cycle approach
Thorpe, David. 2013. Evaluating factors in sustainable road construction and management: a life cycle approach. Brisbane, Australia. University of Southern Queensland.
Sustainable roads - an achievable goal?
Thorpe, David. 2011. "Sustainable roads - an achievable goal?" Vega, Gloria (ed.) SSEE 2011: Escaping Silos. Brisbane, Australia 24 - 26 Oct 2011 Canberra, Australia.
Towards authentic assessment - an evaluation of assessment in a postgraduate engineering asset management course
Thorpe, David. 2012. "Towards authentic assessment - an evaluation of assessment in a postgraduate engineering asset management course." Mann, Llewellyn and Daniel, Scott (ed.) 23rd Annual Conference of the Australasian Association for Engineering Education (AAEE 2012). Melbourne, Australia 03 - 05 Dec 2012 Melbourne, Australia.
Effectiveness of constructability concept in the provision of infrastructure assets
Saghatforoush, E., Trigunarsyah, B., Too, E. and Heravitorbati, A.. 2011. "Effectiveness of constructability concept in the provision of infrastructure assets." Cowled, Craig J. L. (ed.) 1st International Postgraduate Conference on Engineering, Designing and Developing the Built Environment for Sustainable Wellbeing (eddBE 2011). Brisbane, Australia 27 - 29 Apr 2011 Brisbane, Australia.
Extending constructability concept to include operation and maintenance issues
Saghatforoush, Ehsan, Trigunarsyah, Bambang, Too, Eric G. and Heravitorbati, Amirhossein. 2011. "Extending constructability concept to include operation and maintenance issues." Preece, C. N., Fathi, M. S., Padfield, R., Papargyropoulou, E., BinAbdullah, M. M. and Rogers, J. (ed.) 1st International Construction Business & Management Symposium (ICBMS2011). Kuala Lumpur, Malaysia 21 - 22 Sep 2011 Kuala Lumpur, Malaysia.
Evaluating factors in sustainable road construction and management: a life cycle approach
Thorpe, David. 2012. "Evaluating factors in sustainable road construction and management: a life cycle approach." Smith, Simon D. (ed.) 28th Annual Conference on Association of Researchers in Construction Management (ARCOM 2012). Edinburgh, United Kingdom 03 - 05 Sep 2012 Reading, United Kingdom.
Optimizing embodied energy of building construction through bioclimatic principles
Sattary, Sattar and Thorpe, David. 2012. "Optimizing embodied energy of building construction through bioclimatic principles." Smith, Simon D. (ed.) 28th Annual Conference on Association of Researchers in Construction Management (ARCOM 2012). Edinburgh, United Kingdom 03 - 05 Sep 2012 United Kingdom.
Enhanced graduate attributes by engaging engineering students in teaching episodes
Kamel, Fouad, Baguley, Margaret and Thorpe, David. 2011. "Enhanced graduate attributes by engaging engineering students in teaching episodes." Al-Abdeli, Yasir M. and Lindsay, Euan (ed.) 22nd Annual Conference of the Australasian Association for Engineering Education (AAEE 2011). Fremantle, Australia 05 - 07 Dec 2011 Canberra, Australia.
Environmental sustainability education: towards a minimum service level agreement for delivery to engineering students
Craig, Ian, Thorpe, David and Goh, Steven. 2011. "Environmental sustainability education: towards a minimum service level agreement for delivery to engineering students." SSEE 2011: Escaping Silos. Brisbane, Australia 24 - 26 Oct 2011 Canberra, Australia.
Development and implementation of a postgraduate technology management program
Thorpe, David. 2004. "Development and implementation of a postgraduate technology management program ." Thorpe, David and Snook, Chris (ed.) 15th Annual Conference of the Australasian Association for Engineering Education (AAEE 2004). Toowoomba, Australia 27 - 29 Sep 2004 Melbourne, Australia.
The challenges of educating engineering and technology managers
Thorpe, David. 2003. "The challenges of educating engineering and technology managers." Brown, Alison (ed.) 14th Annual Conference of the Australasian Association for Engineering Education (AAEE 2003). Melbourne, Australia 29 Sep - 01 Oct 2003 Melbourne, Australia.
Challenges in offering engineering programs at a new campus
Thorpe, David, Swan, Taryn and Hannigan, Delphine. 2009. "Challenges in offering engineering programs at a new campus." Kestell, Colin, Grainger, Steven and Cheung, John (ed.) 20th Annual Conference for the Australasian Association of Engineering Education (AAEE 2009). Adelaide, Australia 06 - 09 Dec 2009 Adelaide, Australia.
Adoption of advanced materials by SME constructors
Thorpe, D. S.. 2008. "Adoption of advanced materials by SME constructors." Aravinthan, Thiru, Karunasena, Warna (Karu) and Wang, Hao (ed.) 20th Australasian Conference on the Mechanics of Structures and Materials (ACMSM20). Toowoomba, Australia 02 - 05 Dec 2008 London, United Kingdom.
Concentrating solar power: parabolic trough with 20% gas boost (CSP-PT+20%)
Craig, Ian, Thorpe, David, Kamel, Fouad and Goh, Steven. 2010. "Concentrating solar power: parabolic trough with 20% gas boost (CSP-PT+20%)." Goh, Steven C. and Wang, Hao (ed.) 2010 Southern Region Engineering Conference (SREC 2010). Toowoomba, Australia 11 - 12 Nov 2010 Toowoomba, Australia.
Work in progress - assessment of how engaging in teaching may enhance the learning journey of engineering and education students
Kamel, Fouad, Baguley, Margaret and Thorpe, David. 2010. "Work in progress - assessment of how engaging in teaching may enhance the learning journey of engineering and education students." Richards, Larry (ed.) 40th ASEE/IEEE Frontiers in Education Conference (FIE 2010): Celebrating 40 Years of Innovation. Washington, United States 27 - 30 Oct 2010 San Diego, CA. United States. https://doi.org/10.1109/FIE.2010.5673649
Study of SME innovation in two Queensland industries
Thorpe, David and Goh, Steven. 2010. "Study of SME innovation in two Queensland industries." Al-Hakim, Latif and Jin, Chen (ed.) Innovation in business and enterprise: technologies and frameworks. Hershey PA, USA. IGI Global. pp. 240-259
Advantages and disadvantages in using permeable concrete as a pavement construction material
Thorpe, David and Zhuge, Yan. 2010. "Advantages and disadvantages in using permeable concrete as a pavement construction material." Egbu, Charles and Lou, Eric (ed.) ARCOM 2010: 26th Annual Conference of the Association of Researchers in Construction Management. Leeds, United Kingdom 06 - 08 Sep 2010 Reading, UK.
Examination of process to develop a framework for better implementation of quality practices in building projects
Heravitorbati, Amirhossein, Coffey, Vaughan, Trigunarsyah, Bambang and Saghatforoush, Ehsan. 2011. "Examination of process to develop a framework for better implementation of quality practices in building projects." 2nd International Conference on Construction and Project Management 2011 (ICCPM2011). Singapore 16 - 18 Sep 2011 Singapore.
Evaluating the influences of stakeholder management on construction project quality
Heravitorbati, Amirhossein, Coffey, Vaughan, Trigunarsyah, Bambang and Saghatforoush, Ehsan. 2011. "Evaluating the influences of stakeholder management on construction project quality." Preece, C. N., Fathi, M. S., Padfield, R., Papargyropoulou, E., BinAbdullah, M. M. and Rogers, J. (ed.) 1st International Construction Business & Management Symposium (ICBMS2011). Kuala Lumpur, Malaysia 21 - 22 Sep 2011 Kuala Lumpur, Malaysia.
Assessment of how engaging in teaching may enhance the learning journey of engineering students
Kamel, Fouad, Baguley, Margaret and Thorpe, David. 2010. "Assessment of how engaging in teaching may enhance the learning journey of engineering students." Goh, Steven C. and Wang, Hao (ed.) 2010 Southern Region Engineering Conference (SREC 2010). Toowoomba, Australia 11 - 12 Nov 2010 Toowoomba, Australia.
Method for calculating schedule delay considering weather conditions
Thorpe, David and Karan, Ebrahim Parvaresh. 2008. "Method for calculating schedule delay considering weather conditions." Dainty, Andrew (ed.) 24th Annual Conference of the Association of Researchers in Construction Management (ARCOM 2008). Cardiff, Wales 01 - 03 Sep 2008 Cardiff, Wales.
An investigation into the innovation and technology transfer process in the SME sector within a university-industry collaboration context
Goh, Steven and Thorpe, David. 2008. "An investigation into the innovation and technology transfer process in the SME sector within a university-industry collaboration context." Asian International Journal of Science and Technology in Production and Manufacturing. 1 (2), pp. 1-10.
Online remote construction management trials in Queensland Department of Main Roads: a participant's perspective
Thorpe, David. 2003. "Online remote construction management trials in Queensland Department of Main Roads: a participant's perspective." Construction Innovation: information, process, management. 3 (2), pp. 65-79. https://doi.org/10.1108/14714170310814855
How engineers become CEOs: implications for education and training
Goh, Steven C., Coaker, Warren and Thorpe, David. 2008. "How engineers become CEOs: implications for education and training." Journal of Achievements in Materials and Manufacturing Engineering. 31 (2), pp. 846-852.
How engineers become CEOs: implications for education and training
Goh, Steven, Coaker, Warren and Thorpe, David. 2008. "How engineers become CEOs: implications for education and training." Yarlagadda, Prasad (ed.) 9th Global Congress on Manufacturing and Management (GCMM2008): Towards Excellence in Smart Manufacturing and Engineering Knowledge Management. Gold Coast, Australia 12 - 14 Nov 2008 Brisbane, Qld., Australia.
A reflection in the innovation and technology transfer experience in a regional micro-manufacturer: a case study
Goh, Steven and Thorpe, David. 2008. "A reflection in the innovation and technology transfer experience in a regional micro-manufacturer: a case study." Yarlagadda, Prasad (ed.) 9th Global Congress on Manufacturing and Management (GCMM2008): Towards Excellence in Smart Manufacturing and Engineering Knowledge Management. Gold Coast, Australia 12 - 14 Nov 2008 Brisbane, Australia.
A review of triple helix linkages in New Zealand earthquake engineering networks and comparison with the Australian cooperative research centre model
Butcher, Peter and Thorpe, David. 2007. "A review of triple helix linkages in New Zealand earthquake engineering networks and comparison with the Australian cooperative research centre model." Etzkowitz, Henry and Wong, Poh-Kam (ed.) Triple Helix VI: 6th Biennial International Conference on University, Industry and Government Linkages. Singapore 16 - 18 May 2007 Singapore.
Environmental sustainability - a driver for innovation in construction SMEs?
Thorpe, David, Ryan, Neal and Charles, Michael. 2008. "Environmental sustainability - a driver for innovation in construction SMEs?" Thomas, Jason and Piekkala-Fletcher, Amy (ed.) 3rd International Conference of the CRC for Construction Innovation: Clients Driving Innovation: Benefiting from Innovation. Gold Coast, Australia 12 - 14 Mar 2008 Brisbane, Australia.
Experiences in implementing a postgraduate engineering management program
Thorpe, David and Fulcher, Robert. 2007. "Experiences in implementing a postgraduate engineering management program." Søndergaard, Harald and Hadgraft, Roger (ed.) 18th Annual Conference of the Australasian Association for Engineering Education (AAEE 2007). Melbourne, Australia 09 - 13 Dec 2007 Melbourne, Australia.
Science and its applications in The Theory of Moral Sentiments
Thorpe, David. 2007. "Science and its applications in The Theory of Moral Sentiments." Cockfield, Geoff, Firth, Ann and Laurent, John (ed.) New perspectives on Adam Smith's The Theory of moral sentiments. Cheltenham, United Kingdom. Edward Elgar Publishing. pp. 124-140
Sustainable resource management of engineering technologies - towards an assessment framework
Hasna, A. M. and Thorpe, D.. 2005. "Sustainable resource management of engineering technologies - towards an assessment framework." Lekkas, T. (ed.) CEST 2005: 9th International Conference of Environmental Science and Technology. Rhodes Island, Greece 01 - 03 Sep 2005 Rhodes, Greece.
Internationalisation of Technology and Society course at University of Southern Queensland
Thorpe, David and Ahfock, Tony. 2005. "Internationalisation of Technology and Society course at University of Southern Queensland." Radcliffe, David and Humphries, Josh (ed.) 4th ASEE/AaeE Global Colloquium on Engineering Education. Sydney, Australia 26 - 29 Sep 2005 Brisbane, Australia.
Uptake of an OHS Code of Practice by Australian construction firms
Charles, Michael, Furneaux, Craig, Pillay, Janet, Thorpe, David, Parades Castello, Cynthya and Brown, Kerry. 2007. "Uptake of an OHS Code of Practice by Australian construction firms." CIB World Building Congress 2007: Construction for Development. Cape Town, South Africa 14 - 17 May 2007 Cape Town, South Africa.
Responding to global issues: sustainability and innovation in the Australian SME residential building construction sector
Thorpe, David and Ryan, Neal. 2007. "Responding to global issues: sustainability and innovation in the Australian SME residential building construction sector." ICCPM/ICCEM 2007. Singapore 01 - 02 Mar 2007 Singapore.
Developing strategic asset management leaders through postgraduate education
Thorpe, David. 2006. "Developing strategic asset management leaders through postgraduate education." Mathew, Joseph, Kennedy, Jim, Ma, Lin, Tan, Andy and Anderson, Deryk (ed.) Inaugural World Congress on Engineering Asset Management (2006). Gold Coast, Australia 11 - 14 Jul 2006 London, UK.
Facilitating technology transfer in the construction industry
Thorpe, David and Ryan, Neal. 2006. "Facilitating technology transfer in the construction industry." Adams, Louise and Guest, Karen (ed.) 2nd International Conference of the Cooperative Research Centre for Construction Innovation . Gold Coast, Australia 12 - 14 Mar 2006 Brisbane, Queensland.
Improving technology transfer in the Australian construction industry
Thorpe, David and Ryan, Neal. 2006. "Improving technology transfer in the Australian construction industry." Brown, Kerry, Hampson, Keith and Brandon, Peter (ed.) Clients driving construction innovation: moving ideas into practice. Brisbane, Australia. Cooperative Research Centre for Construction Innovation. pp. 303-312
Educating engineers for a sustainable future
Thorpe, David and Fulcher, Robert. 2005. "Educating engineers for a sustainable future ." Thorpe, David, Yadav, Umapati, Snook, Chris and Liang, George (ed.) 2005 Southern Region Engineering Conference (SREC 2005). Toowoomba, Australia 15 Oct 2005 Toowoomba, Australia.