Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia
Article
| Article Title | Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia |
|---|---|
| ERA Journal ID | 40994 |
| Article Category | Article |
| Authors | Ibrahim, Maan Nihad (Author), Thorpe, David (Author) and Mahmood, Muhammad Nateque (Author) |
| Journal Title | Construction Innovation: information, process, management |
| Journal Citation | 19 (4), pp. 550-569 |
| Number of Pages | 20 |
| Year | 2019 |
| Publisher | Emerald |
| Place of Publication | United Kingdom |
| ISSN | 1471-4175 |
| 1477-0857 | |
| Digital Object Identifier (DOI) | https://doi.org/10.1108/CI-07-2018-0058 |
| Abstract | Purpose – The purpose of this paper is to investigate a set of risk-related factors influencing the earned Design/methodology/approach – A qualitative research approach has been adopted for identifying Findings – EVM is a common method for assessing project performance. A weakness of this approach Practical implications – This research assists projects managers to improve the evaluation process of Originality/value – This research addresses the need to include in the EVM calculation a range of risk |
| Keywords | earned value management, infrastructure construction, project management, performance, risk management |
| ANZSRC Field of Research 2020 | 400504. Construction engineering |
| Public Notes | File reproduced in accordance with the copyright policy of the publisher/author. |
| Byline Affiliations | School of Civil Engineering and Surveying |
| Institution of Origin | University of Southern Queensland |
https://research.usq.edu.au/item/q59w7/risk-factors-affecting-the-ability-for-earned-value-management-to-accurately-assess-the-performance-of-infrastructure-projects-in-australia
Download files
386
total views630
total downloads4
views this month2
downloads this month