System dynamics model to determine concession period of PPP infrastructure projects: overarching effects of critical success factors
Article
Article Title | System dynamics model to determine concession period of PPP infrastructure projects: overarching effects of critical success factors |
---|---|
ERA Journal ID | 124294 |
Article Category | Article |
Authors | Ullah, Fahim (Author), Thaheem, Muhammad Jamaluddin (Author), Sepasgozar, Samad M. E. (Author) and Forcada, Nuria (Author) |
Journal Title | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction |
Journal Citation | 10 (4) |
Article Number | 04518022 |
Number of Pages | 12 |
Year | 2018 |
Place of Publication | United States |
ISSN | 1943-4162 |
1943-4170 | |
Digital Object Identifier (DOI) | https://doi.org/10.1061/(ASCE)LA.1943-4170.0000280 |
Web Address (URL) | https://ascelibrary.org/doi/10.1061/%28ASCE%29LA.1943-4170.0000280 |
Abstract | The determination of the concession period (CP) in public–private partnership (PPP) infrastructure projects presents complexities to decision makers because various critical success factors (CSF) are involved which may be overlooked. This paper outlines a system dynamics (SD)-based approach to provide an in-depth understanding of CSFs that determines PPP projects’ CP and models them for localized use. The CSFs are obtained from published literature, duly vetted through a survey of 56 experts, and used to develop a quantitative and qualitative SD model, validated by simulating case studies of five infrastructure projects. A total of 59 concession-affecting CSFs are highlighted that are reduced and compared for localized infrastructure projects. The findings indicate that CP should be dynamic instead of fixed and static, and warrant an extension of the originally proposed concession in three cases and reduction in the remaining two. The decision-making implications of this study target the three key stakeholders: the public body through reduced financial risks, the private organization through increased confidence and reassessment of concession during project life, and the end user through nominal tolls. |
Keywords | concession period; critical success factors; infrastructure projects; public-private partnership |
ANZSRC Field of Research 2020 | 330201. Automation and technology in building and construction |
Public Notes | Files associated with this item cannot be displayed due to copyright restrictions. |
Byline Affiliations | University of New South Wales |
National University of Sciences and Technology, Pakistan | |
Technical University of Catalonia, Spain | |
Institution of Origin | University of Southern Queensland |