Critical pathways to enhanced innovation diffusion and business performance in Australian design firms
Article
| Article Title | Critical pathways to enhanced innovation diffusion and business performance in Australian design firms |
|---|---|
| ERA Journal ID | 4159 |
| Article Category | Article |
| Authors | Panuwatwanich, Kriengsak, Stewart, Rodney A. and Mohamed, Sherif |
| Journal Title | Automation in Construction |
| Journal Citation | 18 (6), pp. 790-797 |
| Number of Pages | 8 |
| Year | Oct 2009 |
| Publisher | Elsevier |
| Place of Publication | Netherlands |
| ISSN | 0926-5805 |
| 1872-7891 | |
| Digital Object Identifier (DOI) | https://doi.org/10.1016/j.autcon.2009.03.001 |
| Web Address (URL) | https://www.sciencedirect.com/science/article/pii/S0926580509000314 |
| Abstract | This paper presents a study that extends on previous empirical research, which examined the role of enabling ‘climate for innovation’ constructs in determining the level of innovation diffusion outcomes, and subsequent business performance in architectural and engineering design (AED) firms. Whilst this previous study elucidated the relationships between broad theoretical constructs, the present study was focused on targeting the significant enabling factor interrelationships with the core outcomes that result from the innovation diffusion process. To achieve this objective, a sequential mixed-method research design combining quantitative and qualitative analysis techniques was employed. The quantitative techniques included a correlation analysis to identify the strong factor relationships, followed by Structural Equation Modelling (SEM) to determine the critical pathways for enhancing innovation diffusion and ultimately heightened levels of client satisfaction. Following path model extraction, qualitative interviews with five Australian AED firms were conducted. The interview findings confirmed the uncovered significant pathways, and provided in-depth insights into how the improvement of critical enabling factors could leverage improved innovation diffusion outcomes and business performance. |
| Keywords | Architectural and engineering design; Australia; Innovation diffusion; Path analysis; Structural Equation Modelling |
| Contains Sensitive Content | Does not contain sensitive content |
| ANZSRC Field of Research 2020 | 350505. Occupational and workplace health and safety |
| Public Notes | Files associated with this item cannot be displayed due to copyright restrictions. |
| Byline Affiliations | Griffith University |
https://research.usq.edu.au/item/w26qw/critical-pathways-to-enhanced-innovation-diffusion-and-business-performance-in-australian-design-firms
170
total views0
total downloads6
views this month0
downloads this month