Using computer software packages to enhance the teaching of engineering management science: part 1 - critical path networks

Article


Ku, H., Fulcher, R. and Xiang, W.. 2011. "Using computer software packages to enhance the teaching of engineering management science: part 1 - critical path networks." Computer Applications in Engineering Education. 19 (1), pp. 26-39. https://doi.org/10.1002/cae.20286
Article Title

Using computer software packages to enhance the teaching of engineering management science: part 1 - critical path networks

ERA Journal ID41159
Article CategoryArticle
AuthorsKu, H. (Author), Fulcher, R. (Author) and Xiang, W. (Author)
Journal TitleComputer Applications in Engineering Education
Journal Citation19 (1), pp. 26-39
Number of Pages14
Year2011
Place of PublicationUnited States
ISSN1061-3773
1099-0542
Digital Object Identifier (DOI)https://doi.org/10.1002/cae.20286
Web Address (URL)https://onlinelibrary.wiley.com/doi/full/10.1002/cae.20286
Abstract

The aim of this article is to share the experience of using different software packages in the delivery of critical path networks in Engineering Management Science coded as ENG4004, in the Bachelor of Engineering and Bachelor of Engineering Technology programs offered by the University of Southern Queensland (USQ), a regional Australian University with excellence in developing e-learning (Good University Guides, 2001). The article describes how the authors use different software packages to solve the critical path network problems of the course. At times, more than one package will be required for the effective delivery of a topic or module of the course. The needs for the usage were also explained. The assessments of the course were also studied and reviewed. How the software packages met the objectives of the module was also discussed together with the desired learning outcomes of students. The preferred software was Production and Operations Management (POM-QM) for Windows 3. It was finally concluded that the actual costs to the university and students are not too much but students learning experience and satisfaction will be greatly improved

Keywordsengineering science; Microsoft Project 2007; quantitative methods; production and operations management (POM-QM) for Windows 3; Excel; Microsoft Office; critical path networks
ANZSRC Field of Research 2020460609. Networking and communications
390113. Science, technology and engineering curriculum and pedagogy
460908. Information systems organisation and management
Public Notes

Files associated with this item cannot be displayed due to copyright restrictions.

Byline AffiliationsDepartment of Mechanical and Mechatronic Engineering
Department of Electrical, Electronic and Computer Engineering
Permalink -

https://research.usq.edu.au/item/9zy52/using-computer-software-packages-to-enhance-the-teaching-of-engineering-management-science-part-1-critical-path-networks

  • 2038
    total views
  • 25
    total downloads
  • 5
    views this month
  • 0
    downloads this month

Export as

Related outputs

Preliminary study on the development of syntactic foams for marine applications
Salleh, Z., Islam, M. M. and Ku, H.. 2013. "Preliminary study on the development of syntactic foams for marine applications." Epaarachchi, Jayantha A., Lau, Alan Kin-tak and Leng, Jinsong (ed.) 4th International Conference on Smart Materials and Nanotechnology in Engineering (SMN 2013). Gold Coast, Australia 10 - 12 Jul 2013 United States. https://doi.org/10.1117/12.2028279
ETT special issue on ‘Quality of Experience in Wireless Multimedia Systems’
Fiedler, Markus, Jiang, Yuming, Zheng, Kan, Chatzimisios, Periklis and Xiang, Wei. 2013. "ETT special issue on ‘Quality of Experience in Wireless Multimedia Systems’ ." Transactions on Emerging Telecommunications Technologies. 24 (3), pp. 257-258. https://doi.org/10.1002/ett.2647
Multihop compute-and-forward for generalised two-way relay channels
Wang, Gengkun, Xiang, Wei and Yuan, Jinhong. 2015. "Multihop compute-and-forward for generalised two-way relay channels ." Transactions on Emerging Telecommunications Technologies. 26 (3), pp. 448-460. https://doi.org/10.1002/ett.2644
The process of updating production engineering in an Australian regional university excellence in developing e-learning
Ku, H.. 2011. "The process of updating production engineering in an Australian regional university excellence in developing e-learning ." Ao, S. I., Castillo, O., Douglas, C., Feng, D. D. and Lee, J.-A. (ed.) 2011 International MultiConference of Engineers and Computer Scientists (IMECS 2011) . Kowloon, China 16 - 18 Mar 2011 Hong Kong.
Intervening to improve the dissertation of final year engineering research projects
Goh, Steven and Ku, Harry. 2011. "Intervening to improve the dissertation of final year engineering research projects." Kellogg, Stuart and Karlin, Jennifer (ed.) 41st ASEE/IEEE Frontiers in Education Conference (FIE 2011): Celebrating 41 Years of Monumental Innovations from around the World. Rapid City, United States 12 - 15 Oct 2011 Piscataway, NJ, United States.
Tensile tests of glass powder reinforced epoxy composites: pilot study
Ku, H., Wong, P., Huang, J., Fung, H. and Mohan, T.. 2011. "Tensile tests of glass powder reinforced epoxy composites: pilot study ." Zhu, Zeng (ed.) ICKEM 2011: 1st International Conference on Key Engineering Materials. Sanya, China 25 - 27 Mar 2011 Stafa-Zurich, Switzerland. https://doi.org/10.4028/www.scientific.net/AMR.214.1
Error-resilient multi-view video coding for next generation 3-D video broadcasting
Gao, Pan, Xiang, Wei, Billingsley, John and Zhang, Yongbing. 2013. "Error-resilient multi-view video coding for next generation 3-D video broadcasting." 4th International Conference on Information and Communication Technology Convergence (ICTC 2013). Jeju Island, South Korea 14 - 16 Oct 2013 United States. IEEE (Institute of Electrical and Electronics Engineers). https://doi.org/10.1109/ICTC.2013.6675545
Cooperative jamming and power allocation with untrusty two-way relay nodes
Long, Hang, Xiang, Wei, Wang, Jing, Zhang, Yueying and Wang, Wenbo. 2014. "Cooperative jamming and power allocation with untrusty two-way relay nodes." IET Communications. 8 (13), pp. 2290-2297. https://doi.org/10.1049/iet-com.2013.0580
Experimental investigation on the interfacial adhesion of date palm fibres with epoxy matrix
Alsaeed, T., Alajmi, A., Yousif, B. F., Ku, H. and Lau, Alan Kin-tak. 2012. "Experimental investigation on the interfacial adhesion of date palm fibres with epoxy matrix." Heslehurst, Rikard Benton and Byrne, Ann (ed.) Composites Australia and the CRC for Advanced Composite Structures Conference 2012: Diversity in Composites. Leura, Australia 15 - 16 Mar 2012 Melbourne, Australia.
A rate–distortion optimized error-resilient algorithm for multi-view video coding
Gao, Pan, Xiang, Wei, Peng, Qiang and Billingsley, John. 2016. "A rate–distortion optimized error-resilient algorithm for multi-view video coding." Circuits, Systems and Signal Processing. 35 (1), pp. 301-323. https://doi.org/10.1007/s00034-015-0065-x
A novel rate control algorithm for video coding based on fuzzy-PID controller
Hou, Yonghong, Wang, Pichao, Xiang, Wei, Gao, Zhimin and Hou, Chunping. 2015. "A novel rate control algorithm for video coding based on fuzzy-PID controller." Signal, Image and Video Processing. 9 (4), pp. 875-884. https://doi.org/10.1007/s11760-013-0518-2
Advanced Antenna Technologies in the Beyond IMT-Advanced Systems
Peng, Mugen, Wang, Cheng-Xiang, Gao, Feifei and Xiang, Wei. 2013. "Advanced Antenna Technologies in the Beyond IMT-Advanced Systems ." International Journal of Antennas and Propagation. 2013. https://doi.org/10.1155/2013/156831
Color plus depth 3-D video transmission with hierarchical 16-QAM
Alajel, Khalid, Xiang, Wei and Sileh, Ibrahim. 2012. "Color plus depth 3-D video transmission with hierarchical 16-QAM ." Wysocki, Beata J. and Wysocki, Tadeusz A. (ed.) 2012 6th International Conference on Signal Processing and Communication Systems (ICSPCS 2012). Gold Coast, Australia 12 - 14 Dec 2012 Piscataway, NJ. United States. IEEE (Institute of Electrical and Electronics Engineers).
Big video data for light-field-based 3D telemedicine
Xiang, Wei, Wang, Gengkun, Pickering, Mark and Zhang, Yongbing. 2016. "Big video data for light-field-based 3D telemedicine." IEEE Network: the magazine of global information exchange. 30 (3), pp. 30-38. https://doi.org/10.1109/MNET.2016.7474341
10 Gb/s HetSNets with millimeter-wave communications: access and networking: challenges and protocols
Zheng, Kan, Zhao, Long, Mei, Jie, Dohler, Mischa, Xiang, Wei and Peng, Yuexing. 2015. "10 Gb/s HetSNets with millimeter-wave communications: access and networking: challenges and protocols." IEEE Communications Magazine. 53 (1), pp. 222-231. https://doi.org/10.1109/MCOM.2015.7010538
Block-FFT Based OMP for Compressed Channel Estimation in Underwater Acoustic Communications
Yu, Fangyuan, Li, Dezhi, Guo, Qing, Wang, Zhenyong and Xiang, Wei. 2015. "Block-FFT Based OMP for Compressed Channel Estimation in Underwater Acoustic Communications." IEEE Communications Letters. 19 (11), pp. 1937-1940. https://doi.org/10.1109/LCOMM.2015.2427806
Low-complexity transmit antenna selection for spatial modulation
Xiao, Yue, Yin, Lu, Wang, Yu, Li, Lei and Xiang, Wei. 2015. "Low-complexity transmit antenna selection for spatial modulation." Electronics Letters. 51 (19), pp. 1548-1549. https://doi.org/10.1049/el.2015.0262
A Low-Complexity Detection Scheme for Differential Spatial Modulation
Xiao, Lixia, Yang, Ping, Lei, Xia, Xiao, Yue, Fan, Shiwen, Li, Shaoqian and Xiang, Wei. 2015. "A Low-Complexity Detection Scheme for Differential Spatial Modulation." IEEE Communications Letters. 19 (9), pp. 1516-1519. https://doi.org/10.1109/LCOMM.2015.2448616
Low power wide area machine-to-machine networks: Key techniques and prototype
Xiong, Xiong, Zheng, Kan, Xu, Rongtao, Xiang, Wei and Chatzimisios, Periklis. 2015. "Low power wide area machine-to-machine networks: Key techniques and prototype." IEEE Communications Magazine. 53 (9), pp. 64-71. https://doi.org/10.1109/mcom.2015.7263374
Performance analysis of device-to-device communications underlaying cellular networks
Wu, Wenjun, Xiang, Wei, Zhang, Yingkai, Zheng, Kan and Wang, Wenbo. 2015. "Performance analysis of device-to-device communications underlaying cellular networks." Telecommunication Systems. 60 (1), pp. 29-41. https://doi.org/10.1007/s11235-014-9919-y
Disparity Vector Correction for View Synthesis Prediction-Based 3-D Video Transmission
Gao, Pan and Xiang, Wei. 2015. "Disparity Vector Correction for View Synthesis Prediction-Based 3-D Video Transmission." IEEE Transactions on Multimedia. 17 (8), pp. 1153-1165. https://doi.org/10.1109/TMM.2015.2438711
Enhancing secrecy capacity of multi-relay wiretap systems with partial channel state information
Long, Hang, Xiang, Wei, Wang, Jing, Zhang, Xiaoli and Wang, Wenbo. 2015. "Enhancing secrecy capacity of multi-relay wiretap systems with partial channel state information." International Journal of Communication Systems. 28 (12), pp. 1847-1861. https://doi.org/10.1002/dac.2802
Mining Cloud 3D Video Data for Interactive Video Services
Xu, Ting, Xiang, Wei, Guo, Qing and Mo, Lifeng. 2015. "Mining Cloud 3D Video Data for Interactive Video Services ." Mobile Networks and Applications. 20 (3), pp. 320-327. https://doi.org/10.1007/s11036-015-0596-1
Advances on Cloud Computing and Technologies
Chen, Min and Xiang, Wei. 2015. "Advances on Cloud Computing and Technologies." Mobile Networks and Applications. 20 (3), pp. 295-296. https://doi.org/10.1007/s11036-015-0618-z
Design and performance analysis of an energy-efficient uplink carrier aggregation scheme
Liu, Fei, Zheng, Kan, Xiang, Wei and Zhao, Hui. 2014. "Design and performance analysis of an energy-efficient uplink carrier aggregation scheme." IEEE Journal on Selected Areas in Communications. 32 (2), pp. 197-207. https://doi.org/10.1109/JSAC.2014.141202
OFDM with interleaved subcarrier-index modulation
Xiao, Yue, Wang, Shunshun, Dan, Lilin, Lei, Xia, Yang, Ping and Xiang, Wei. 2014. "OFDM with interleaved subcarrier-index modulation." IEEE Communications Letters. 18 (8), pp. 1447-1450. https://doi.org/10.1109/LCOMM.2014.2332340
A sampling theorem for the fractional Fourier transform without band-limiting constraints
Shi, Jun, Xiang, Wei, Liu, Xiaoping and Zhang, Naitong. 2014. "A sampling theorem for the fractional Fourier transform without band-limiting constraints." Signal Processing. 98, pp. 158-165. https://doi.org/10.1016/j.sigpro.2013.11.026
Precoding and channel state information sharing in cooperative macro base stations and femto sites
Long, H., Xiang, W., Zhang, Y., Wang, J., Zheng, K. and Wang, W.. 2014. "Precoding and channel state information sharing in cooperative macro base stations and femto sites." International Journal of Communication Systems. 27 (10), pp. 2030-2047. https://doi.org/10.1002/dac.2453
Rate-distortion optimized mode switching for error-resilient multi-view video plus depth based 3-D video coding
Gao, Pan and Xiang, Wei. 2014. "Rate-distortion optimized mode switching for error-resilient multi-view video plus depth based 3-D video coding." IEEE Transactions on Multimedia. 16 (7), pp. 1797-1808. https://doi.org/10.1109/TMM.2014.2331013
Sampling expansion for irregularly sampled signals in fractional Fourier transform domain
Liu, Xiaoping, Shi, Jun, Xiang, Wei, Zhang, Qinyu and Zhang, Naitong. 2014. "Sampling expansion for irregularly sampled signals in fractional Fourier transform domain." Digital Signal Processing. 34, pp. 74-81. https://doi.org/10.1016/j.dsp.2014.08.004
Network-coded rateless coding scheme in erasure multiple-access relay enable communications
Gu, Shushi, Jiao, Jian, Zhang, Qinyu, Yang, Zhihua, Xiang, Wei and Cao, Bin. 2014. "Network-coded rateless coding scheme in erasure multiple-access relay enable communications." IET Communications. 8 (4), pp. 537-545. https://doi.org/10.1049/iet-com.2013.0488
Cross-layer optimization for 3-D video transmission over cooperative relay systems
Salim, Omar H., Xiang, Wei, Leis, John and Cao, Lei. 2014. "Cross-layer optimization for 3-D video transmission over cooperative relay systems." Signal Processing: Image Communication. 29 (10), pp. 1102-1120. https://doi.org/10.1016/j.image.2014.08.003
Quality-of-experience assessment and its application to video services in LTE networks
Zheng, Kan, Zhang, Xiaoli, Zheng, Qiang, Xiang, Wei and Hanzo, Lajos. 2015. "Quality-of-experience assessment and its application to video services in LTE networks." IEEE Wireless Communications. 22 (1), pp. 70-78. https://doi.org/10.1109/MWC.2015.7054721
Generalized wireless network coding schemes for multihop two-way relay channels
Wang, Gengkun, Xiang, Wei and Yuan, Jinhong. 2014. "Generalized wireless network coding schemes for multihop two-way relay channels." IEEE Transactions on Wireless Communications. 13 (9), pp. 5132-5147. https://doi.org/10.1109/TWC.2014.2336652
Complex Gaussian belief propagation algorithms for distributed multicell multiuser MIMO detection
Yue, Ziqi, Guo, Qing and Xiang, Wei. 2015. "Complex Gaussian belief propagation algorithms for distributed multicell multiuser MIMO detection." IEEE Global Communications Conference (GLOBECOM 2014). Austin, United States 08 - 12 Dec 2014 Piscataway, NJ. United States. https://doi.org/10.1109/GLOCOM.2014.7037421
Energy-efficient dual-iteration power allocation for two-phase relay system with massive antennas
Zhao, Long, Xiang, Wei, Mei, Jie, Zhao, Hui, Long, Hang and Li, Lin. 2014. "Energy-efficient dual-iteration power allocation for two-phase relay system with massive antennas." International Journal of Antennas and Propagation. 2014, pp. 1-8. https://doi.org/10.1155/2014/543826
Channel, phase noise, and frequency offset in OFDM systems: joint estimation, data detection, and hybrid Cramer-Rao lower bound
Salim, Omar Hazim, Nasir, Ali A., Mehrpouyan, Hani, Xiang, Wei, Durrani, Salman and Kennedy, Rodney A.. 2014. "Channel, phase noise, and frequency offset in OFDM systems: joint estimation, data detection, and hybrid Cramer-Rao lower bound." IEEE Transactions on Communications. 62 (9), pp. 3311-3325. https://doi.org/10.1109/TCOMM.2014.2345056
Error-resilient multi-view video coding using Wyner-Ziv techniques
Gao, Pan, Peng, Qiang and Xiang, Wei. 2015. "Error-resilient multi-view video coding using Wyner-Ziv techniques." Multimedia Tools and Applications. 74 (18), pp. 7957-7982. https://doi.org/10.1007/s11042-014-2033-z
Dynamic downlink aggregation carrier scheduling scheme for wireless networks
Zheng, Kan, Liu, Fei, Xiang, Wei and Xin, Xuemei. 2014. "Dynamic downlink aggregation carrier scheduling scheme for wireless networks." IET Communications. 8 (1), pp. 114-123. https://doi.org/10.1049/iet-com.2013.0271
Cooperative jamming and power allocation in three-phase two-way relaying system with untrusty relay node
Long, Hang, Xiang, Wei, Zhang, Xiaoli, Wang, Jing and Wang, Wenbo. 2014. "Cooperative jamming and power allocation in three-phase two-way relaying system with untrusty relay node." 31st URSI General Assembly and Scientific Symposium (URSI GASS 2014). Beijing, China 16 - 23 Aug 2014 Piscataway, NJ. United States. https://doi.org/10.1109/URSIGASS.2014.6929316
An adaptive anti-collision protocol for large-scale RFID tag identification
Zhang, Lijuan, Xiang, Wei and Tang, Xiaohu. 2014. "An adaptive anti-collision protocol for large-scale RFID tag identification." IEEE Wireless Communications Letters. 3 (6), pp. 601-604. https://doi.org/10.1109/LWC.2014.2359461
Survey of Large-Scale MIMO Systems
Zheng, Kan, Zhao, Long, Mei, Jei, Shao, Bin, Xiang, Wei and Hanzo, Lajos. 2015. "Survey of Large-Scale MIMO Systems." IEEE Communications Surveys and Tutorials. 17 (3), pp. 1738-1760. https://doi.org/10.1109/COMST.2015.2425294
Multiuser hybrid analog/digital beamforming for relatively large-scale antenna arrays
Geng, Jian, Wei, Zaixue, Wang, Xianling, Xiang, Wei and Yang, Dacheng. 2013. "Multiuser hybrid analog/digital beamforming for relatively large-scale antenna arrays." IEEE Globecom Workshops (GLOBECOM 2013). Atlanta, United States 09 - 13 Dec 2013 Piscataway, NJ. United States. https://doi.org/10.1109/GLOCOMW.2013.6824973
Multi-user hybrid analogue/digital beamforming forrelatively large-scale antenna systems
Geng, Jian, Xiang, Wei, Wei, Zaixue, Li, Nanxi and Yang, Dacheng. 2014. "Multi-user hybrid analogue/digital beamforming forrelatively large-scale antenna systems." IET Communications. 8 (17), pp. 3038-3049. https://doi.org/10.1049/iet-com.2013.0873
Joint channel, phase noise, and carrier frequency offset estimation in cooperative OFDM systems
Salim, Omar H., Nasir, Ali A., Xiang, Wei and Kennedy, Rodney A.. 2014. "Joint channel, phase noise, and carrier frequency offset estimation in cooperative OFDM systems." IEEE International Conference On Communications (ICC 2014): Communications: Centrepoint of the Digital Economy. Sydney, Australia 10 - 14 Jun 2014 Piscataway, NJ. United States.
Analysis of heat-treated bovine cortical bone by thermal gravimetric and nanoindentation
Lau, Mei-ling, Lau, Kin-tak, Ku, Harry, Cardona, Francisco and Lee, Joong-Hee. 2013. "Analysis of heat-treated bovine cortical bone by thermal gravimetric and nanoindentation ." Composites Part B: Engineering. 55, pp. 447-452. https://doi.org/10.1016/j.compositesb.2013.06.027
Using computer software packages to enhance the teaching in engineering management science part 4 – quality control
Ku, Harry Siu-lung. 2013. "Using computer software packages to enhance the teaching in engineering management science part 4 – quality control ." Ao, S. I., Castillo, O., Douglas, C., Feng, David and Lee, Jeong-A. (ed.) International MultiConference of Engineers and Computer Scientists (IMECS 2013). Kowloon, Hong Kong 13 - 15 Mar 2013 Hong Kong.
Generalized compute-and-forward schemes for multi-hop two-way relay channels
Wang, Gengkun, Xiang, Wei and Wang, Yafeng. 2013. "Generalized compute-and-forward schemes for multi-hop two-way relay channels." Miller, Jeffrey (ed.) IEEE 78th Vehicular Technology Conference (VTC 2013 Fall): Connecting the Mobile World. Las Vegas, United States 02 - 05 Sep 2013 United States. https://doi.org/10.1109/VTCFall.2013.6692212
Error probability of OFDM-based hybrid relay protocols over wideband fading channels
Sileh, Ibrahim Khalil, Xiang, Wei and Maxwell, Andrew. 2013. "Error probability of OFDM-based hybrid relay protocols over wideband fading channels ." Liu, Ren (ed.) IEEE International Conference on Ultra-Wideband (ICUWB 2013). Sydney, Australia 15 - 18 Sep 2013 Piscataway, NJ. United States. https://doi.org/10.1109/ICUWB.2013.6663858
Power allocation of distributed space-frequency coding for OFDM-based hybrid relay selection
Sileh, Ibrahim Khalil, Xiang, Wei and Maxwell, Andrew. 2013. "Power allocation of distributed space-frequency coding for OFDM-based hybrid relay selection." Wysocki, Tad (ed.) 2013 7th International Conference on Signal Processing and Communication Systems (ICSPCS 2013). Gold Coast, Australia 16 - 18 Dec 2013 United States. https://doi.org/10.1109/ICSPCS.2013.6723943
Fracture toughness and toughening mechanisms of unsaturated polyester-based clay nanocomposites
Albdiry, Mushtaq T., Yousif, Belal F. and Ku, Harry. 2013. "Fracture toughness and toughening mechanisms of unsaturated polyester-based clay nanocomposites." 13th International Conference on Fracture (ICF 2013). Beijing, China 16 - 21 Jun 2013 Anhui, China.
Cooperative jamming and power allocation in two-way relaying system with eavesdropper
Long, Hang, Xiang, Wei, Wang, Jing, Zhang, Yueying, Zhao, Hui and Wang, Wenbo. 2013. "Cooperative jamming and power allocation in two-way relaying system with eavesdropper." Miller, Jeffrey (ed.) IEEE 78th Vehicular Technology Conference (VTC 2013 Fall): Connecting the Mobile World. Las Vegas, United States 02 - 05 Sep 2013 United States. https://doi.org/10.1109/VTCFall.2013.6692144
Cooperative jamming and power allocation in three-phase two-way relaying wiretap systems
Long, Hang, Xiang, Wei, Wang, Jing, Zhang, Yueying and Wang, Wenbo. 2013. "Cooperative jamming and power allocation in three-phase two-way relaying wiretap systems." You, Xiaohu (ed.) IEEE Wireless Communications and Networking Conference (WCNC 2013): Connecting the Future. Shanghai, China 07 - 10 Apr 2013 Piscataway, NJ. United States. https://doi.org/10.1109/WCNC.2013.6555247
On antenna calibration for the TDD-based network MIMO system
Geng, Jian, Wei, Zaixue, Wang, Xianling, Liu, Xiaoyi, Xiang, Wei and Yang, Dacheng. 2013. "On antenna calibration for the TDD-based network MIMO system ." Kim, Dong-In and Mueller, Peter (ed.) 2013 IEEE International Conference on Communications (ICC). Budapest, Hungary 09 - 13 Jun 2013 Piscataway, NJ. United States. https://doi.org/10.1109/ICC.2013.6655534
Low-Complexity Signal Detection for Generalized Spatial Modulation
Xiao, Y., Yang, Z., Dan, L., Yang, P., Yin, L. and Xiang, W.. 2014. "Low-Complexity Signal Detection for Generalized Spatial Modulation." IEEE Communications Letters. 18 (3), pp. 403-406. https://doi.org/10.1109/LCOMM.2013.123113.132586
Generalized analysis on diversity-multiplexing trade-off of relay protocols
Wang, Yafeng, Qin, Lin and Xiang, Wei. 2013. "Generalized analysis on diversity-multiplexing trade-off of relay protocols." Applied Mathematics and Information Sciences. 7 (2L), pp. 511-517. https://doi.org/10.12785/amis/072L20
Secrecy capacity enhancement with distributed precoding in multirelay wiretap systems
Long, Hang, Xiang, Wei, Zhang, Yueying, Liu, Yuanan and Wang, Wenbo. 2013. "Secrecy capacity enhancement with distributed precoding in multirelay wiretap systems." IEEE Transactions on Information Forensics and Security. 8 (1), pp. 229-238. https://doi.org/10.1109/TIFS.2012.2229988
Joint subcarrier pairing and resource allocation for adaptive hybrid relay protocol in OFDM systems
Sileh, Ibrahim Khalil, Xiang, Wei and Maxwell, Andrew. 2013. "Joint subcarrier pairing and resource allocation for adaptive hybrid relay protocol in OFDM systems." 24th IEEE International Symposium on Personal Indoor and Mobile Radio Communications (PIMRC 2013). London, United Kingdom 08 - 11 Sep 2013 Piscataway, NJ. United States. https://doi.org/10.1109/PIMRC.2013.6666474
Performance analysis of cooperative virtual multiple-input-multiple-output in small-call networks
Zheng, Kan, Xin, Xuemei, Liu, Fei, Xiang, Wei and Dohler, Mischa. 2013. "Performance analysis of cooperative virtual multiple-input-multiple-output in small-call networks." IET Communications. 7 (16), pp. 1729-1738. https://doi.org/10.1049/iet-com.2013.0214
Performance optimization of digital spectrum analyzer with Gaussian input signal
Hou, Yonghong, Liu, Guihua, Wang, Qing and Xiang, Wei. 2013. "Performance optimization of digital spectrum analyzer with Gaussian input signal." IEEE Signal Processing Letters. 20 (1), pp. 31-34. https://doi.org/10.1109/LSP.2012.2227255
Symbol detection with network coding in wireless channels
Cao, Lei and Xiang, Wei. 2013. "Symbol detection with network coding in wireless channels." IEEE Communications Letters. 17 (8), pp. 1528-1531. https://doi.org/10.1109/LCOMM.2013.062113.130314
Impact fracture behaviour of silane-treated halloysite nanotubes-reinforced unsaturated polyester
Albdiry, M. T., Ku, H. and Yousif, B. F.. 2013. "Impact fracture behaviour of silane-treated halloysite nanotubes-reinforced unsaturated polyester." Engineering Failure Analysis. 35, pp. 718-725. https://doi.org/10.1016/j.engfailanal.2013.06.027
Inter-cell interference modeling for cellular networks
Wang, Yafeng, Wei, Guoxing and Xiang, Wei. 2013. "Inter-cell interference modeling for cellular networks." Telecommunication Systems. 53 (1), pp. 99-105. https://doi.org/10.1007/s11235-013-9682-5
Tensile properties of nanoclay reinforced epoxy composites
Ku, H. and Trada, Mohan. 2013. "Tensile properties of nanoclay reinforced epoxy composites." Epaarachchi, Jayantha A. , Lau, Alan Kin-tak and Leng, Jinsong (ed.) 4th International Conference on Smart Materials and Nanotechnology in Engineering (SMN 2013). Gold Coast, Australia 10 - 12 Jul 2013 Bellingham, WA. United States. https://doi.org/10.1117/12.2026644
An Efficient Unequal Error Protection Scheme for 3-D Video Transmission
Salim, Omar Hazim, Xiang, Wei and Leis, John. 2013. "An Efficient Unequal Error Protection Scheme for 3-D Video Transmission." You, Xiaohu (ed.) IEEE Wireless Communications and Networking Conference (WCNC 2013): Connecting the Future. Shanghai, China 07 - 10 Apr 2013 United States. https://doi.org/10.1109/WCNC.2013.6555230
Study on compressive properties of syntactic foams for marine applications
Salleh, Z., Islam, M. M. and Ku, H.. 2014. "Study on compressive properties of syntactic foams for marine applications." Journal of Multifunctional Composites. 2 (1), pp. 21-27. https://doi.org/10.12783/issn.2168-4286/2.1/Salleh
A graph-based cooperative scheduling scheme for vehicular networks
Zheng, Kan, Liu, Fei, Zheng, Qiang, Xiang, Wei and Wang, Wenbo. 2013. "A graph-based cooperative scheduling scheme for vehicular networks." IEEE Transactions on Vehicular Technology. 62 (4), pp. 1450-1458. https://doi.org/10.1109/TVT.2013.2244929
Smart Relaying for Selection Combining Based Decode-and-Forward Cooperative Networks
Zhao, Dawei, Zhao, Honglin, Jia, Min and Xiang, Wei. 2014. "Smart Relaying for Selection Combining Based Decode-and-Forward Cooperative Networks ." IEEE Communications Letters. 18 (1), pp. 74-77. https://doi.org/10.1109/LCOMM.2013.112513.132216
Phase noise and carrier frequency offset in OFDM systems: joint estimation and hybrid Cramer-Rao lower bound
Salim, Omar Hazim, Nasir, Ali A., Mehrpouyan, Hani and Xiang, Wei. 2013. "Phase noise and carrier frequency offset in OFDM systems: joint estimation and hybrid Cramer-Rao lower bound." Cavalcante, R. and Pawelczak, P. (ed.) 14th IEEE International Workshop on Signal Processing Advances in Wireless Communications (SPAWC 2013). Darmstadt, Germany 16 - 19 Jun 2013 United States. https://doi.org/10.1109/SPAWC.2013.6612130
Surface coating of poly-D-L-lactide/nano-hydroxyapatite composite scaffolds for dexamethasone-releasing function and wettability enhancement
Chen, Ling, Tang, Chak Yin, Ku, Harry Siu Lung, Chen, Da Zhu and Tsui, Chi Pong. 2013. "Surface coating of poly-D-L-lactide/nano-hydroxyapatite composite scaffolds for dexamethasone-releasing function and wettability enhancement." Bose, Susmita, Narayan, Roger and Bandyopadhyay , Amit (ed.) Materials Science and Technology Conference (MS&T 2012): Next Generation Biomaterials and Surface Properties of Biomaterials . Pittsburgh, United States 27 - 31 Oct 2012 Hoboken, NJ. United States. https://doi.org/10.1002/9781118751015
Microwave sintering and characterization of polypropylene/multi-walled carbon nanotube/hydroxyapatite composites
Chen, Ling, Tang, Chak Yin, Ku, Harry Siu-Lung, Tsui, Chi Pong and Chen, Xu. 2014. "Microwave sintering and characterization of polypropylene/multi-walled carbon nanotube/hydroxyapatite composites ." Composites Part B: Engineering. 56, pp. 504-511. https://doi.org/10.1016/j.compositesb.2013.08.005
Wireless tablet PCs for enhanced teaching at an Australian regional university teaching both campus and distance modes
Goh, Steven Chingnam, Galligan, Linda Ann and Ku, Harry. 2013. "Wireless tablet PCs for enhanced teaching at an Australian regional university teaching both campus and distance modes." 120th American Society for Engineering Education Annual Conference and Exposition (ASEE 2013): Engineering Education: Frankly, We Do Give a D*mn. Atlanta, GA. United States 23 - 26 Jun 2013 Washington, DC. United States.
Ergodic capacity analysis of spatially modulated systems
Hou, Yonghong, Wang, Pichao, Xiang, Wei, Zhao, Xiaoming and Hou, Chunping. 2013. "Ergodic capacity analysis of spatially modulated systems." China Communications . 10 (7), pp. 118-125. https://doi.org/10.1109/CC.2013.6571295
Tensile behaviours of activated carbon coconut shell filled epoxy composites
Salleh, Z., Islam, M. M. and Ku, H.. 2013. "Tensile behaviours of activated carbon coconut shell filled epoxy composites." Noor, M. M., Rahman, M. M. and Ismail, J. (ed.) 3rd Malaysian Postgraduate Conference (MPC 2013). Sydney, Australia 04 - 05 Jul 2013 Sydney, Australia.
A new hierarchical 16-QAM-based UEP scheme for 3-D video with depth image based rendering
Alajel, Khalid Mohamed and Xiang, Wei. 2013. "A new hierarchical 16-QAM-based UEP scheme for 3-D video with depth image based rendering." Zhu, Ce and Li, Yuenan (ed.) Advanced video communications over wireless networks. Boca Raton, FL. United States. CRC Press. pp. 355-382
Processing of materials using electromagnetic fields
Ku, Harry S.. 2012. "Processing of materials using electromagnetic fields." Nicolais, Luigi and Borzacchiello, Assunta (ed.) Wiley encyclopedia of composites, 2nd ed.. Hoboken, NJ. United States. John Wiley & Sons. pp. 2487-2500
A novel scheduling scheme for finite buffer service in time-varying channels
Liu, Fei, Xiang, Wei, Zhao, Hui, Zheng, Kan and Long, Hang. 2012. "A novel scheduling scheme for finite buffer service in time-varying channels." Yang, Yixian, Lei, Min and Jia, Xiaoyun (ed.) 14th IEEE International Conference on Communication Technology (ICCT 2012). Chengdu; China 09 - 11 Nov 2012 United States. https://doi.org/10.1109/ICCT.2012.6511184
The potential of using date palm fibres as reinforcement for polymeric composites
Alsaeed, T., Yousif, B. F. and Ku, H.. 2013. "The potential of using date palm fibres as reinforcement for polymeric composites." Materials and Design. 43, pp. 177-184. https://doi.org/10.1016/j.matdes.2012.06.061
Color plus depth 3-D video transmission with heirarchical 16-QAM
Alajel, Khalid Mohamed and Xiang, Wei. 2012. "Color plus depth 3-D video transmission with heirarchical 16-QAM ." Smolic, Aljosa (ed.) 3DTV-CON 2012: The True Vision: Capture, Transmission and Display of 3D Video. Zurich, Switzerland 15 - 17 Oct 2012 Piscataway, NJ. United States. https://doi.org/10.1109/3DTV.2012.6365482
Modelling of tensile properties glass powder/epoxy composites post-cured in an oven and in microwaves
Ku, H., Epaarachchi, J., Trada, M. and Wong, P.. 2013. "Modelling of tensile properties glass powder/epoxy composites post-cured in an oven and in microwaves ." Journal of Reinforced Plastics and Composites. 32 (10), pp. 689-699. https://doi.org/10.1177/0731684412475333
Dielectric properties of sawdust reinforced epoxy composites post-cured in microwaves
Ku, H., Trada, M. and Tai, P.. 2013. "Dielectric properties of sawdust reinforced epoxy composites post-cured in microwaves ." Journal of Reinforced Plastics and Composites. 32 (10), pp. 765-774. https://doi.org/10.1177/0731684412475250
Tensile properties of bagasse reinforced epoxy composites
Trada, M., Mandava, J., Ku, H. and Yousif, B.. 2012. "Tensile properties of bagasse reinforced epoxy composites." Jaafar, M., Azura, A. R., Leong, K. H. and Leong, A. Y. L. (ed.) 8th Asian-Australasian Conference on Composite Materials (ACCM 2012): Composites: Enabling Tomorrow's Industry Today. Kuala Lumpur, Malaysia 06 - 08 Nov 2012 Kowloon, Hong Kong.
A pilot study on flexural properties of epoxy nanoclay reinforced composites
Ku, H., Fung, S. Y., Islam, M., Li, X. and Chong, Y. P.. 2013. "A pilot study on flexural properties of epoxy nanoclay reinforced composites ." Journal of Reinforced Plastics and Composites. 32 (2), pp. 96-104. https://doi.org/10.1177/0731684412459246
Diversity analysis of two-way MIMO relaying system based on zero-forcing
Long, Hang, Xiang, Wei, Liu, Hongmei and Shen, Shanshan. 2012. "Diversity analysis of two-way MIMO relaying system based on zero-forcing ." IEEE International Conference on Communications (ICC 2012): Connect, Communicate, Collaborate. Ottawa, Canada 10 - 15 Jun 2012 Piscataway, NJ. United States. https://doi.org/10.1109/ICC.2012.6364759
Analysis of unitary distributed spatial-temporal precoding in MIMO relay systems
Long, Hang, Xiang, Wei, Zhang, Yueying, Wang, Jing and Wu, Bin. 2012. "Analysis of unitary distributed spatial-temporal precoding in MIMO relay systems." Liu, Xingang, Yang, Laurence T., Chen, Min and Lai, Chin-Feng (ed.) 12th IEEE International Conference on Computer and Information Technology (CIT 2012). Chengdu, China 27 - 29 Oct 2012 Los Alamitos, CA. United States. https://doi.org/10.1109/CIT.2012.67
Trade-off Optimization for Scalable Video Coding Streaming in Relay-Based OFDMA Networks
You, Lei, Xiang, Wei, Hou, Chunping, Lei, Jianjun and Hou, Yonghong. 2013. "Trade-off Optimization for Scalable Video Coding Streaming in Relay-Based OFDMA Networks." China Communications . 10 (5), pp. 99-113. https://doi.org/10.1109/CC.2013.6520942
Graph based interference coordination for relay networks
Wang, Yafeng, Li, Meng and Xiang, Wei. 2012. "Graph based interference coordination for relay networks." Przeglad Elektrotechniczny (Electrical Review). 88 (1B), pp. 88-91.
Fairness-aware resource partition and routing in relay-enhanced orthogonal-frequency-division-multiple-accessing cellular networks
Wang, J., Ma, Z., Lv, Z., Sheng, Y. and Xiang, W.. 2012. "Fairness-aware resource partition and routing in relay-enhanced orthogonal-frequency-division-multiple-accessing cellular networks." IET Communications. 6 (16), pp. 2613-2620. https://doi.org/10.1049/iet-com.2011.0392
High performance micro CO sensors based on ZnO-SnO2 composite nanofibers with anti-humidity characteristics
Yue, Xue-Jun, Hong, Tian-Sheng, Xiang, Wei, Cai, Kun and Xu, Xing. 2012. "High performance micro CO sensors based on ZnO-SnO2 composite nanofibers with anti-humidity characteristics." Chinese Physics Letters. 29 (12), pp. 1-4. https://doi.org/10.1088/0256-307X/29/12/120702
A novel QoE-based carrier scheduling scheme in LTE-advanced networks with multi-service
Liu, Fei, Xiang, Wei, Zhang, Yueying, Zheng, Kan and Zhao, Hui. 2012. "A novel QoE-based carrier scheduling scheme in LTE-advanced networks with multi-service ." Roy, Sebastien and Morin, Andre (ed.) 76th IEEE Vehicular Technology Conference (VCT 2012-Fall): Towards Sustainable Mobility. Quebec City, Canada 03 - 06 Sep 2012 United States. https://doi.org/10.1109/VTCFall.2012.6398912
A novel relay scheme for the asymmetry multiple access relay channel
Chang, Cheng, Hou, Yonghong and Xiang, Wei. 2012. "A novel relay scheme for the asymmetry multiple access relay channel." Journal of Nanoelectronics and Optoelectronics. 7 (2), pp. 209-215. https://doi.org/10.1166/jno.2012.1236
Outage performance for compute-and-forward in generalized multi-way relay channels
Wang, Gengkun, Xiang, Wei and Yuan, Jinhong. 2012. "Outage performance for compute-and-forward in generalized multi-way relay channels." IEEE Communications Letters. 16 (12), pp. 2099-2102. https://doi.org/10.1109/LCOMM.2012.112012.122273
Review on using packages to enhance the teaching of critical path networks
Ku, Harry S.. 2012. "Review on using packages to enhance the teaching of critical path networks." Ao, S. I., Castillo, Oscar, Douglas, Craig, Feng, David Dagan and Lee, Jeong-A. (ed.) 2012 International MultiConference of Engineers and Computer Scientists (IMECS 2012). Hong Kong, China 14 - 16 Mar 2012 Hong Kong.
Joint multi-user precoding in multi-relay systems
Long, Hang, Xiang, Wei, Zhang, Yueying, Wang, Jing and Wang, Wenbo. 2012. "Joint multi-user precoding in multi-relay systems." 7th International Conference on Communications and Networking in China (CHINACOM 2012). Kunming, China 08 - 10 Aug 2012 United States. https://doi.org/10.1109/ChinaCom.2012.6417525
Measurements of heat treatment effects on bovine cortical bones by nanoindentation and compression testing
Lau, Mei-Ling, Lau, Kin-Tak, Ku, Harry, Bahattacharyya, Debes and Yao, Yan-Dong. 2012. "Measurements of heat treatment effects on bovine cortical bones by nanoindentation and compression testing." Journal of Biomaterials and Nanobiotechnology. 3 (1), pp. 105-113. https://doi.org/10.4236/jbnb.2012.31014
Suitability of using coir fiber/polymeric composite for the design of liquid storage tanks
Yousif, B. F. and Ku, H.. 2012. "Suitability of using coir fiber/polymeric composite for the design of liquid storage tanks." Materials and Design. 36, pp. 847-853. https://doi.org/10.1016/j.matdes.2011.01.063
A novel unequal error protection scheme for 3-D video transmission over cooperative MIMO-OFDM systems
Salim, Omar Hazim and Xiang, Wei. 2012. "A novel unequal error protection scheme for 3-D video transmission over cooperative MIMO-OFDM systems." Eurasip Journal on Wireless Communications and Networking. 2012 (269), pp. 1-15. https://doi.org/10.1186/1687-1499-2012-269
Utility-based resource allocation with bipartite matching in OFDMA-based wireless systems
Zheng, Kan, Li, Wei, Liu, Fei and Xiang, Wei. 2012. "Utility-based resource allocation with bipartite matching in OFDMA-based wireless systems." Transactions on Internet and Information Systems. 6 (8), pp. 1913-1925. https://doi.org/10.3837/tiis.2012.08.002
A novel UEP scheme based upon rateless codes
Ni, Chunya, Hou, Chunping and Xiang, Wei. 2012. "A novel UEP scheme based upon rateless codes." 2012 IEEE Wireless Communications and Networking Conference (WCNC 2012) . Paris, France 01 - 04 Apr 2012 Piscataway, NJ. USA. https://doi.org/10.1109/WCNC.2012.6214437
Conditional error rate and combining schemes for hybrid automatic repeat request with M-pulse amplitude modulation
Long, Hang, Xiang, Wei, Wang, Jing, Zhang, Yueying, Liu, Yuanan and Wang, Wenbo. 2014. "Conditional error rate and combining schemes for hybrid automatic repeat request with M-pulse amplitude modulation." International Journal of Communication Systems. 27 (10), pp. 1798-1813. https://doi.org/10.1002/dac.2436
Radio resource allocation in LTE-advanced cellular networks with M2M communications
Zheng, Kan, Hu, Fanglong, Wang, Wenbo, Xiang, Wei and Dohler, Mischa. 2012. "Radio resource allocation in LTE-advanced cellular networks with M2M communications ." IEEE Communications Magazine. 50 (7), pp. 184-192. https://doi.org/10.1109/MCOM.2012.6231296
Precoder distribution and adaptive codebook in wideband precoding
Long, Hang, Kim, Kyeong Jin, Xiang, Wei, Wang, Jing, Liu, Yuanan and Wang, Wenbo. 2012. "Precoder distribution and adaptive codebook in wideband precoding." ETRI Journal. 34 (5), pp. 655-665. https://doi.org/10.4218/etrij.12.0112.0072
Two-symbol FPGA architecture for fast arithmetic encoding in JPEG 2000
Ramesh Kumar, Nandini, Xiang, Wei and Wang, Yafeng. 2012. "Two-symbol FPGA architecture for fast arithmetic encoding in JPEG 2000." Journal of Signal Processing Systems. 69 (2), pp. 213-224. https://doi.org/10.1007/s11265-011-0655-1
Analysis of conditional error rate and combining schemes in HARQ
Long, Hang, Xiang, Wei, Shen, Shanshan, Zhang, Yueying, Zheng, Kan and Wang, Wenbo. 2012. "Analysis of conditional error rate and combining schemes in HARQ." IEEE Transactions on Signal Processing. 60 (5), pp. 2677-2682. https://doi.org/10.1109/TSP.2012.2184100
Modeling the flexural properties of SLG reinforced phenol formaldehyde composites using Langrage’s Method
Ku, H., Zhou, Hong, Wong, Peter, Su, Gang and Vadher, Jayent. 2012. "Modeling the flexural properties of SLG reinforced phenol formaldehyde composites using Langrage’s Method ." Advanced Materials Research. 410, pp. 305-308. https://doi.org/10.4028/www.scientific.net/AMR.410.305
Flexural properties of epoxy composites filled with glass powder: preliminary results
Ku, H., Wong, P., Huang, J., Fung, H. and Trada, M.. 2012. "Flexural properties of epoxy composites filled with glass powder: preliminary results." Advanced Materials Research. 410, pp. 309-312. https://doi.org/10.4028/www.scientific.net/AMR.410.309
Improved wideband precoding with arbitrary subcarrier grouping in MIMO-OFDM systems
Long, Hang, Kim, Kyeong Jin, Xiang, Wei, Shen, Shanshan, Zheng, Kan and Wang, Wenbo. 2012. "Improved wideband precoding with arbitrary subcarrier grouping in MIMO-OFDM systems." ETRI Journal. 34 (1), pp. 9-16. https://doi.org/10.4218/etrij.12.0111.0050
Tensile properties of phenol-formaldehyde nanoclay reinforced composites: a pilot study
Ku, H., Yap, Y. S., Lee, T. S. and Trada, M.. 2012. "Tensile properties of phenol-formaldehyde nanoclay reinforced composites: a pilot study ." Journal of Applied Polymer Science. 126 (2 (Supplement)), pp. E142-E150. https://doi.org/10.1002/app.35232
Unequal error protection scheme based hierarchical 16-QAM for 3-D video transmission
Alajel, Khalid Mohamed, Xiang, Wei and Wang, Yafeng. 2012. "Unequal error protection scheme based hierarchical 16-QAM for 3-D video transmission ." IEEE Transactions on Consumer Electronics. 58 (3), pp. 731-738. https://doi.org/10.1109/TCE.2012.6311311
Distributed queue information based scheduling scheme for relay systems with wireless backhaul link
Wang, Yafeng, Wang, Zhuo and Xiang, Wei. 2012. "Distributed queue information based scheduling scheme for relay systems with wireless backhaul link ." Advanced Science Letters. 11 (1), pp. 253-257. https://doi.org/10.1166/asl.2012.3060
A new queue-status resource allocation scheme for backhaul link in relay enhanced networks
Wang, Chao, Zheng, Kan, Xiang, Wei and Long, Hang. 2012. "A new queue-status resource allocation scheme for backhaul link in relay enhanced networks ." 2012 IEEE Wireless Communications and Networking Conference (WCNC 2012) . Paris, France 01 - 04 Apr 2012 Piscataway, NJ. United States. https://doi.org/10.1109/WCNC.2012.6214294
Distributed space-frequency coding for OFDM-based hybrid relay selection
Sileh, Ibrahim Khalil and Xiang, Wei. 2012. "Distributed space-frequency coding for OFDM-based hybrid relay selection." Dutkiewicz, Eryk (ed.) 12th International Symposium on Communications and Information Technologies (ISCIT 2012). Gold Coast, Australia 02 - 05 Oct 2012 Piscataway, NJ. United States . https://doi.org/10.1109/ISCIT.2012.6380969
Outage probability of unequal block-based OFDM amplify-and-forward relay protocol over wideband channels
Sileh, Ibrahim Khalil, Xiang, Wei and Alajel, Khalid Mohamed. 2012. "Outage probability of unequal block-based OFDM amplify-and-forward relay protocol over wideband channels." Dutkiewicz, Eryk (ed.) 12th International Symposium on Communications and Information Technologies (ISCIT 2012). Gold Coast, Australia 02 - 05 Oct 2012 Piscataway, NJ. United States. https://doi.org/10.1109/ISCIT.2012.6380970
Best relays selection method for error-resilient 3-D video transmission
Alajel, Khalid Mohamed, Xiang, Wei and Sileh, Ibrahim Khalil. 2012. "Best relays selection method for error-resilient 3-D video transmission." Dutkiewicz, Eryk (ed.) 12th International Symposium on Communications and Information Technologies (ISCIT 2012). Gold Coast, Australia 02 - 05 Oct 2012 Piscataway, NJ. United States . https://doi.org/10.1109/ISCIT.2012.6380891
A critical review on the manufacturing processes in relation to the properties of nanoclay/polymer composites
Albdiry, M. T., Yousif, B. F., Ku, H. and Lau, K. T.. 2013. "A critical review on the manufacturing processes in relation to the properties of nanoclay/polymer composites." Journal of Composite Materials. 47 (9), pp. 1093-1115. https://doi.org/10.1177/0021998312445592
Influence of beamforming on interference distribution of wireless network
Wang, Yafeng, Ding, Wenbo and Xiang, Wei. 2012. "Influence of beamforming on interference distribution of wireless network ." Advanced Science Letters. 11 (1), pp. 148-153. https://doi.org/10.1166/asl.2012.3011
Fracture toughness of vinyl ester composites reinforced with sawdust and postcured in microwaves
Ku, H., Prajapati, M. and Trada, M.. 2012. "Fracture toughness of vinyl ester composites reinforced with sawdust and postcured in microwaves." International Journal of Microwave Science and Technology. 2012, pp. 1-8. https://doi.org/10.1155/2012/152726
Courses for teaching leadership capacity in professional engineering degrees in Australia and Europe
Khattak, Hamid, Ku, Harry and Goh, Steven. 2012. "Courses for teaching leadership capacity in professional engineering degrees in Australia and Europe." European Journal of Engineering Education. 37 (3), pp. 279-296. https://doi.org/10.1080/03043797.2012.684671
Thermal properties of calcium carbonate powder reinforced vinyl ester composites: pilot study
Ku, Harry, Cardona, Francisco and Jamal Eddine, Mustapha. 2013. "Thermal properties of calcium carbonate powder reinforced vinyl ester composites: pilot study." Journal of Applied Polymer Science. 127 (4), pp. 2996-3001. https://doi.org/10.1002/app.37973
Flexural properties of sawdust-reinforced epoxy composites post-cured in microwaves
Ku, H., Donald, M., Cardona, F. and Trada, M.. 2012. "Flexural properties of sawdust-reinforced epoxy composites post-cured in microwaves." Journal of Composite Materials. 46 (22), pp. 2879-2890. https://doi.org/10.1177/0021998311433437
Contrast on tensile and flexural properties of glass powder reinforced epoxy composites: pilot study
Ku, H. and Wong, P.. 2012. "Contrast on tensile and flexural properties of glass powder reinforced epoxy composites: pilot study ." Journal of Applied Polymer Science. 123 (1), pp. 152-161. https://doi.org/10.1002/app.34469
Cooperative relay selection based UEP scheme for 3D video transmission over Rayleigh fading channel
Sileh, Ibrahim Khalil, Alajel, Khalid Mohamed and Xiang, Wei. 2011. "Cooperative relay selection based UEP scheme for 3D video transmission over Rayleigh fading channel." Bradley, Andrew, Jackway, Paul, Gal, Yaniv and Salvado, Olivier (ed.) 2011 International Conference on Digital Image Computing: Techniques and Application (DICTA 2011). Noosa, Australia 06 - 08 Dec 2011 Los Alamitos, CA. United States. https://doi.org/10.1109/DICTA.2011.122
Prioritized 3-D video transmission over cooperative MIMO-OFDM systems
Salim, Omar Hazim and Xiang, Wei. 2011. "Prioritized 3-D video transmission over cooperative MIMO-OFDM systems." Bradley, Andrew, Gal, Yaniv and Salvado, Olivier (ed.) 2011 International Conference on Digital Image Computing: Techniques and Application (DICTA 2011). Noosa, Australia 06 - 08 Dec 2011 Los Alamitos, CA. United States. https://doi.org/10.1109/DICTA.2011.44
Antenna gain mismatch calibration for cooperative base stations
Geng, Jian, Pan, Chengkang, Huang, Fan, Xiang, Wei, Wang, Qixing, Guangyi, Liu, Xiaodong, Shen and Yang, Dacheng. 2011. "Antenna gain mismatch calibration for cooperative base stations." 2011 IEEE Vehicular Technology Conference: Smarter Communication for an Intelligent World (VTC 2011-Fall). San Francisco, United States of America 05 - 08 Sep 2011 United States. https://doi.org/10.1109/VETECF.2011.6092882
A novel selection incremental relaying strategy for cooperative networks
Ran, Jie, Wang, Yafeng, Yang, Dacheng and Xiang, Wei. 2011. "A novel selection incremental relaying strategy for cooperative networks." 2011 IEEE Wireless Communications and Networking Conference (WCNC 2011) . Cancun, Mexico 28 - 31 Mar 2011 United States. https://doi.org/10.1109/WCNC.2011.5779422
Proportional fair resource partition for LTE-advanced networks with Type I relay nodes
Ma, Zhangchao, Xiang, Wei, Long, Hang and Wang, Wenbo. 2011. "Proportional fair resource partition for LTE-advanced networks with Type I relay nodes ." Uji, Noritaka (ed.) ICC 2011: Source of Innovation: Back to the Origin. Kyoto, Japan 05 - 09 Jun 2011 Piscataway, NJ. United States. https://doi.org/10.1109/icc.2011.5963280
A novel image compressive sensing method based on complex measurements
Ramesh Kumar, Nandini, Xiang, Wei and Soar, Jeffrey. 2011. "A novel image compressive sensing method based on complex measurements." 2011 International Conference on Digital Image Computing: Techniques and Application (DICTA 2011). Noosa, Australia 06 - 08 Dec 2011 Los Alamitos, CA. United States. https://doi.org/10.1109/DICTA.2011.36
Outage analysis of non-regenerative analog network coding for two-way multi-hop networks
Wang, Gengkun, Xiang, Wei, Yuan, Jinhong and Huang, Tao. 2011. "Outage analysis of non-regenerative analog network coding for two-way multi-hop networks." IEEE Communications Letters. 15 (6), pp. 662-664. https://doi.org/10.1109/LCOMM.2011.050311.110006
Analysis on the impact of antenna gain mismatch on precoding vector
Geng, Jian, Wang, Yafeng, Huang, Fan, Xiang, Wei and Yang, Dacheng. 2011. "Analysis on the impact of antenna gain mismatch on precoding vector." 2011 IEEE Wireless Communications and Networking Conference (WCNC 2011) . Cancun, Mexico 28 - 31 Mar 2011 United States. https://doi.org/10.1109/WCNC.2011.5779405
A pilot study on the relationship between mechanical and electrical loss tangents of glass powder reinforced epoxy composites post-cured in microwaves
Ku, H., Wong, P., Maxwell, A., Huang, J., Fung, H. and Mohan, T.. 2011. "A pilot study on the relationship between mechanical and electrical loss tangents of glass powder reinforced epoxy composites post-cured in microwaves." Zhu, Zeng (ed.) ICKEM 2011: 1st International Conference on Key Engineering Materials. Sanya, China 25 - 27 Mar 2011 Zurich, Switzerland. https://doi.org/10.4028/www.scientific.net/AMR.214.26
Channel distortion modeling for multi-view video transmission over packet-switched networks
Zhou, Yuan, Hou, Chunping, Xiang, Wei and Wu, Feng. 2011. "Channel distortion modeling for multi-view video transmission over packet-switched networks." IEEE Transactions on Circuits and Systems for Video Technology. 21 (11), pp. 1679-1692. https://doi.org/10.1109/TCSVT.2011.2133390
Outage probability analysis of coded cooperation with multiple relays
Li, Chang, Wang, Yafeng, Xiang, Wei and Yang, Dacheng. 2011. "Outage probability analysis of coded cooperation with multiple relays." 2011 IEEE Vehicular Technology Conference: Smarter Communication for an Intelligent World (VTC 2011-Fall). San Francisco, United States of America 05 - 08 Sep 2011 United States. https://doi.org/10.1109/VETECF.2011.6093067
Performance analysis for coded cooperative multiple-relay in distributed turbo channels
Li, Chang, Wang, Yafeng, Xiang, Wei and Yang, Dacheng. 2011. "Performance analysis for coded cooperative multiple-relay in distributed turbo channels." IEEE 22nd International Symposium on Personal Indoor and Mobile Radio Communications (PIMRC 2011). Toronto, Canada 11 - 14 Sep 2011 United States. https://doi.org/10.1109/PIMRC.2011.6139755
Flexible engineering degree programs with remote access laboratories in an Australian regional university known for its excellence in e-learning
Ku, H., Goh, S. and Ahfock, A.. 2011. "Flexible engineering degree programs with remote access laboratories in an Australian regional university known for its excellence in e-learning." Computer Applications in Engineering Education. 19 (1), pp. 18-25. https://doi.org/10.1002/cae.20284
Assessing heat-treatment effects on bovine cortical bones by nanoindentation
Lau, Mei-ling, Lau, Kin-tak, Ku, Harry, Bahattacharyya, Debes and Lee, Joong-Hee. 2012. "Assessing heat-treatment effects on bovine cortical bones by nanoindentation ." Advanced Materials Research. https://doi.org/10.4028/www.scientific.net/AMR.410.110
Proportional fair-based in-cell routing for relay-enhanced cellular networks
Ma, Zhangchao, Xiang, Wei, Long, Hang and Wang, Wenbo. 2011. "Proportional fair-based in-cell routing for relay-enhanced cellular networks." 2011 IEEE Wireless Communications and Networking Conference (WCNC 2011) . Cancun, Mexico 28 - 31 Mar 2011 Piscataway, NJ, United States. https://doi.org/10.1109/WCNC.2011.5779193
Outage performance of analog network coding in generalized two-way multi-hop networks
Wang, Gengkun, Xiang, Wei, Yuan, Jinhong and Huang, Tao. 2011. "Outage performance of analog network coding in generalized two-way multi-hop networks." 2011 IEEE Wireless Communications and Networking Conference (WCNC 2011) . Cancun, Mexico 28 - 31 Mar 2011 United States. https://doi.org/10.1109/WCNC.2011.5779434
Face detection based on skin color modeling and modified Hausdorff distance
Alajel, Khalid Mohamed, Xiang, Wei and Leis, John. 2011. "Face detection based on skin color modeling and modified Hausdorff distance." CCNC 2011: Emerging and Innovative Consumer Technologies and Applications. Las Vegas, United States 09 - 12 Jan 2011 Piscataway, NJ. United States. https://doi.org/10.1109/CCNC.2011.5766499
Relationship between different mechanical properties of phenol formaldehyde SLG-reinforced composites
Ku, H. S.. 2011. "Relationship between different mechanical properties of phenol formaldehyde SLG-reinforced composites." Journal of Reinforced Plastics and Composites. 30 (15), pp. 1281-1292. https://doi.org/10.1177/0731684411418705
Approximate inter-cell interference modeling for cellular network
Wang, Yafeng, Wei, Guoxing and Xiang, Wei. 2011. "Approximate inter-cell interference modeling for cellular network ." Journal of China Universities of Posts and Telecommunications. 18 (3), pp. 75-79. https://doi.org/10.1016/S1005-8885(10)60066-0
Relationship between electrical and mechanical loss tangents of hollow glass powder reinforced epoxy composites: a pilot study
Ku, H., Maxwell, A., Wong, P., Huang, J. and Fung, H.. 2011. "Relationship between electrical and mechanical loss tangents of hollow glass powder reinforced epoxy composites: a pilot study ." Journal of Applied Polymer Science. 119 (5), pp. 2945-2952. https://doi.org/10.1002/app.33009
HVS-based quality assessment metrics for 3-D images
Li, Sumei, Xiang, Wei, Cheng, Fuwei, Zhao, Ruichao and Hou, Chunping. 2010. "HVS-based quality assessment metrics for 3-D images ." Huang, Xinhan (ed.) 2nd WRI Global Congress on Intelligent Systems (GCIS 2010) . Wuhan, China 16 - 17 Dec 2010 Los Alamitos, CA, United States. https://doi.org/10.1109/GCIS.2010.273
Semi-distributed relay selection algorithm for multi-user cooperative wireless networks
Wang, Yafeng, Liang, Min and Xiang, Wei. 2011. "Semi-distributed relay selection algorithm for multi-user cooperative wireless networks ." Journal of Networks. 6 (6), pp. 907-911. https://doi.org/10.4304/jnw.6.6.907-911
Research on uplink coordinated transmission schemes in LTE-advanced systems
Wang, Yafeng, Wei, Guo-xing, Yang, Da-cheng and Xiang, Wei. 2011. "Research on uplink coordinated transmission schemes in LTE-advanced systems." Journal of China Universities of Posts and Telecommunications. 18 (2), pp. 72-77. https://doi.org/10.1016/S1005-8885(10)60047-7
Physical layer multicasting over 2-hop network using dual amplify and forward relay
Adnan, M., Iqbal, M., Wang, Y., Yang, D. and Xiang, Wei. 2010. "Physical layer multicasting over 2-hop network using dual amplify and forward relay ." 2nd International Conference on Future Computer and Communication (ICFCC 2010). Wuhan, China 21 - 24 May 2010 Piscataway, NJ. United States . https://doi.org/10.1109/ICFCC.2010.5497654
Teaching engineering management in a flexible learning environment
Fulcher, Robert. 2004. "Teaching engineering management in a flexible learning environment." 15th Annual Conference of the Australasian Association for Engineering Education (AAEE 2004). Toowoomba, Australia 27 - 29 Sep 2004 Melbourne, Australia.
An investigation into the application of research strategies in the final-year undergraduate engineering and surveying projects
Cochrane, Sandra, Goh, Steven and Ku, Harry. 2009. "An investigation into the application of research strategies in the final-year undergraduate engineering and surveying projects." Kestell, Colin, Grainger, Steven and Cheung, John (ed.) 20th Annual Conference for the Australasian Association of Engineering Education (AAEE 2009). Adelaide, Australia 06 - 09 Dec 2009 Adelaide, Australia.
Engineering education - undergraduate and masters: China and down under
Ku, Harry, Wen, Paul, Xiang, Wei and Goh, Steven. 2009. "Engineering education - undergraduate and masters: China and down under." Kestell, Colin, Grainger, Steven and Cheung, John (ed.) 20th Annual Conference for the Australasian Association of Engineering Education (AAEE 2009). Adelaide, Australia 06 - 09 Dec 2009 Adelaide, Australia.
Forward error correction-based 2-D layered multiple description coding for error-resilient H.264 SVC video transmission
Xiang, Wei, Zhu, Ce, Siew, Chee Kheong, Xu, Yuanyuan and Liu, Minglei. 2009. "Forward error correction-based 2-D layered multiple description coding for error-resilient H.264 SVC video transmission." IEEE Transactions on Circuits and Systems for Video Technology. 19 (12), pp. 1730-1738. https://doi.org/10.1109/TCSVT.2009.2022787
A Prototype Biometric Security Authentication System Based upon Fingerprint Recognition
Xiang, Wei, Desai, Bhavin, Wen, Paul, Wang, Yafeng and Peng, Tianshu. 2009. "A Prototype Biometric Security Authentication System Based upon Fingerprint Recognition." Wen, Peng, Li, Yuefeng, Polkowski, Lech, Yao, Yiyu, Tsumoto, Shusaku and Wang, Guoyin (ed.) 4th International Conference on Rough Sets and Knowledge Technology (RSKT 2009). Gold Coast, Australia 14 - 16 Jul 2009 Germany. Springer. https://doi.org/10.1007/978-3-642-02962-2_33
Multicast based dual amplify and forward relay scheme for 2 hop networks
Adnan, Muhammad, She, Haoqiu, Wang, Yafeng, Yang, Dacheng and Xiang, Wei. 2009. "Multicast based dual amplify and forward relay scheme for 2 hop networks." Velásquez, Carlos Eduardo (ed.) LATINCOM 2009: 1st IEEE Latin-American Conference on Communications. Medellin, Colombia 10 - 11 Sep 2009 Piscataway, NJ. United States.
Research design for investigation of Nigeria manufacturing management
Mustapha, U. M., Ku, H. and Goh, S.. 2009. "Research design for investigation of Nigeria manufacturing management." Wen, Peng, Li, Yuefeng, Polkowski, Lech, Yao, Yiyu, Tsumoto, Shusaku and Wang, Guoyin (ed.) 4th International Conference on Rough Sets and Knowledge Technology (RSKT 2009). Gold Coast, Australia 14 - 16 Jul 2009 Berlin, Germany. Springer. https://doi.org/10.1007/978-3-642-02962-2_58
Effects of chopped hemp on mechanical and thermal properties of epoxy resins
Vandenbroucke, A., Cardona, F., Ku, H. and Rogers, D.. 2009. "Effects of chopped hemp on mechanical and thermal properties of epoxy resins ." Aravinthan, Thiru, Karunasena, Warna (Karu) and Wang, Hao (ed.) 20th Australasian Conference on the Mechanics of Structures and Materials (ACMSM20). Toowoomba, Australia 02 - 05 Dec 2008 London, United Kingdom.
Effects of EPON on mechanical and thermal properties of epoxy resins
Ku, H., Cardona, F., Rogers, D. and Vandenbroucke, A.. 2008. "Effects of EPON on mechanical and thermal properties of epoxy resins ." Lau, Alan K. T., Lu, J., Varadan, Vijay K., Chang, F. K., Tu, J. P. and Lam, P. M. (ed.) ICMMSE 2008: International Conference on Multifunctional Materials and Structures. Hong Kong, China 28 - 31 Jul 2008 Stafa-Zurich, Switzerland. https://doi.org/10.4028/www.scientific.net/AMR.47-50.536
Weldability and heat affected zone (HAZ) evaluation for high energy rate joining of thermoplastic composites using microwaves
Ku, Harry S., Siores, Elias and Ball, James A. R.. 1997. "Weldability and heat affected zone (HAZ) evaluation for high energy rate joining of thermoplastic composites using microwaves ." Herszberg, Isreal (ed.) 11th International Conference on Composite Materials (ICCM-11). Gold Coast, Australia 14 - 18 Jul 1997 Cambridge, United Kingdom.
Complex permittivity of low loss thermoplastic composites using a resonant cavity method
Ku, Harry S., Ball, James A. R., Siores, Elias and Chan, Peter. 1999. "Complex permittivity of low loss thermoplastic composites using a resonant cavity method ." Massard, Thierry and Vautrin, Alain (ed.) 12th International Conference on Composite Materials (ICCM-12). Paris, France 05 - 09 Jul 1999 Cambridge, United Kingdom.
Prediction of crushing stress in composite materials
Goh, S., Ku, H. and Ang, S. L.. 2008. "Prediction of crushing stress in composite materials." Journal of Composite Materials. 42 (5), pp. 467-484. https://doi.org/10.1177/0021998307086204
An improved error estimation algorithm for stereophonic acoustic echo cancellation systems
Nguyen-Ky, Tai, Leis, John W. and Xiang, Wei. 2007. "An improved error estimation algorithm for stereophonic acoustic echo cancellation systems." Wysocki, Beata J. and Wysocki, Tadeusz A. (ed.) 2007 1st International Conference on Signal Processing and Communication Systems (ICSPCS 2007). Gold Coast, Australia 17 - 19 Dec 2007 Tarrawanna, NSW, Australia.
Iterative decision-feedback equalizer with cyclic detection for DFT-S OFDM system
Wang, Yafeng, Yang, Hao and Xiang, Wei. 2008. "Iterative decision-feedback equalizer with cyclic detection for DFT-S OFDM system." Wysocki, Beata J. and Wysocki, Tadeusz A. (ed.) 2007 1st International Conference on Signal Processing and Communication Systems (ICSPCS 2007). Gold Coast, Australia 17 - 19 Dec 2007 Tarrawanna, NSW, Australia.
Automated vehicle classification system using advanced noise reduction technology
Xiang, Wei, Otto, Colin and Wen, Peng. 2008. "Automated vehicle classification system using advanced noise reduction technology." Wysocki, Beata J. and Wysocki, Tadeusz A. (ed.) 2007 1st International Conference on Signal Processing and Communication Systems (ICSPCS 2007). Gold Coast, Australia 17 - 19 Dec 2007 Wollongong, Australia.
Joint source-channel decoding of JPEG images using error resilient source codes
Xiang, Wei, Pietrobon, Steven S. and Barbulescu, Sorin Adrian. 2003. "Joint source-channel decoding of JPEG images using error resilient source codes." 2003 IEEE International Symposium on Information Theory. Yokohama, Japan 29 Jun - 04 Jul 2003 Japan. https://doi.org/10.1109/ISIT.2003.1228493
On the capacity and normalisation of ISI channels
Xiang, Wei and Pietrobon, Steven S.. 2003. "On the capacity and normalisation of ISI channels." IEEE Transactions on Information Theory. 49 (9), pp. 2263-2268. https://doi.org/10.1109/TIT.2003.815809
Micrographs of fractured vinyl ester composites
Ku, Harry S., Ang, Soh Fong, Snook, Chris and Baddeley, Douglas. 2007. "Micrographs of fractured vinyl ester composites." Journal of Reinforced Plastics and Composites. 26 (11), pp. 1111-1134. https://doi.org/10.1177/0731684407079778
Processing of polymer matrix composites using variable frequency microwave (VFM)
Ku, Harry S., Siores, Elias, Ball, James A. R. and Chan, Peter. 2001. "Processing of polymer matrix composites using variable frequency microwave (VFM) ." Zhang, Yao (ed.) 13th International Conference on Composite Materials (ICCM-13) . Beijing, China 25 - 29 Jun 2001 China.
Variable frequency microwave (VFM) processing facilities and application in processing thermoplastic matrix composites
Ku, H. S., Siu, F., Siores, E. and Ball, J. A. R.. 2003. "Variable frequency microwave (VFM) processing facilities and application in processing thermoplastic matrix composites." Journal of Materials Processing Technology. 139 (1-3), pp. 291-295. https://doi.org/10.1016/S0924-0136(03)00238-3
Impact strength of vinyl ester composites cured by microwave irradiation: preliminary results
Cheng, Y. M., Ku, Harry S., Snook, Chris and Baddeley, Douglas. 2004. "Impact strength of vinyl ester composites cured by microwave irradiation: preliminary results." Proceedings of the Institution of Mechanical Engineers Part L: Journal of Materials, Design and Applications. https://doi.org/10.1177/146442070421800405
Problem based learning in system design teams
Fulcher, Robert and Snook, Chris. 2006. "Problem based learning in system design teams." Rowe, Gerard and Reid, Gillian (ed.) 17th Annual Conference of the Australasian Association for Engineering Education (AAEE 2006). Auckland, New Zealand 10 - 13 Dec 2006 Melbourne, Australia.
Short bar tests for vinyl ester particulate reinforced composites cured by microwaves
Ku, Harry S., Tsang, Shing Hin, Baddeley, Douglas and Snook, Chris. 2006. "Short bar tests for vinyl ester particulate reinforced composites cured by microwaves." Australian Journal of Structural Engineering. 7 (1), pp. 65-73.
Fracture toughness of vinyl ester composites cured by microwave irradiation: preliminary results
Ku, Harry S., Baddeley, Douglas, Snook, Chris and Chew, C. S.. 2005. "Fracture toughness of vinyl ester composites cured by microwave irradiation: preliminary results." Journal of Reinforced Plastics and Composites. 24 (11), pp. 1181-1202. https://doi.org/10.1177/0731684405048841
Micrographs of the fracture of vinyl ester composites cured by microwaves: pilot study
Chew, C. S., Ku, Harry S., Baddeley, Douglas and Snook, Chris. 2005. "Micrographs of the fracture of vinyl ester composites cured by microwaves: pilot study." Journal of Electromagnetic Waves and Applications. 19 (1), pp. 67-82. https://doi.org/10.1163/1569393052955080
Drop weight impact test fracture of vinyl ester composites: micrographs of pilot study
Ku, Harry S., Cheng, Y. M., Snook, Chris and Baddeley, Douglas. 2005. "Drop weight impact test fracture of vinyl ester composites: micrographs of pilot study." Journal of Composite Materials. 39 (18), pp. 1607-1620. https://doi.org/10.1177/0021998305051111
Flexural properties of phenolic resin reinforced with glass powder: preliminary results
Ku, H., Trada, M., Nixon, R. and Wong, P.. 2010. "Flexural properties of phenolic resin reinforced with glass powder: preliminary results ." Journal of Applied Polymer Science. 116 (1), pp. 347-354. https://doi.org/10.1002/app.31608
Tensile tests of phenol formaldehyde glass-powder-reinforced composites: pilot study
Ku, H., Trada, M., Cecil, T. and Wong, P.. 2010. "Tensile tests of phenol formaldehyde glass-powder-reinforced composites: pilot study." Journal of Applied Polymer Science. 116 (1), pp. 10-17. https://doi.org/10.1002/app.31424
Wireless sensor home automation networks based upon Sun SPOT
Wang, Gengkun, Xiang, Wei, Chen, Haoyu and Wen, Peng. 2011. "Wireless sensor home automation networks based upon Sun SPOT." ICSSC 2011: IET International Conference on Smart and Sustainable City (IET ICSSC2011). Shanghai, China 06 - 08 Jul 2011 NJ. United States. https://doi.org/10.1049/cp.2011.0295
Error-resilient video transmission for 3-D signal over cooperative-MIMO system
Salim, Omar Hazim, Xiang, Wei and Leis, John. 2011. "Error-resilient video transmission for 3-D signal over cooperative-MIMO system." Pascual, Antonio and Fernandez, Carles (ed.) EUSIPCO 2011: 19th European Signal Processing Conference. Barcelona, Spain 29 Aug - 02 Sep 2011 Barcelona, Spain.
Remote access laboratories in Australia and Europe
Ku, H., Ahfock, T. and Yusaf, T.. 2011. "Remote access laboratories in Australia and Europe." European Journal of Engineering Education. 36 (3), pp. 253-268. https://doi.org/10.1080/03043797.2011.578244
Error resilience performance evaluation of H.264 I-frame and JPWL for wireless image transmission
Alajel, Khalid Mohamed, Xiang, Wei and Leis, John. 2010. "Error resilience performance evaluation of H.264 I-frame and JPWL for wireless image transmission." Wysocki, Beata J. and Wysocki, Tadeusz A. (ed.) 2010 4th International Conference on Signal Processing and Communication Systems (ICSPCS 2010). Gold Coast, Australia 13 - 15 Dec 2010 United States. https://doi.org/10.1109/ICSPCS.2010.5709766
Performance analysis of error resilience wireless image transmission using H.264/AVC I-frame
Alajel, Khalid Mohamed, Xiang, Wei and Leis, John. 2010. "Performance analysis of error resilience wireless image transmission using H.264/AVC I-frame." Goh, Steven C. and Wang, Hao (ed.) 2010 Southern Region Engineering Conference (SREC 2010). Toowoomba, Australia 11 - 12 Nov 2010 Toowoomba, Australia.
Literature review of past and present performance of the Nigerian manufacturing sector
Ku, H. S-L., Mustapha, U. and Goh, S.. 2010. "Literature review of past and present performance of the Nigerian manufacturing sector ." IMechE 2010: Institution of Mechanical Engineers. Lyon, France 04 Nov 2010 United Kingdom. SAGE Publications Ltd. https://doi.org/10.1243/09544054JEM1818
Soft incremental redundancy for distributed turbo product codes
Obiedat, Esam A., Xiang, Wei, Leis, John and Cao, Lei. 2010. "Soft incremental redundancy for distributed turbo product codes." Balandin, Sergey, Matuszewksi, Marcin and Ott, Jorg (ed.) 7th IEEE Consumer Communications and Networking Conference (CCNC 2010). Las Vegas, United States 09 - 12 Jan 2010 United States. https://doi.org/10.1109/CCNC.2010.5421779
Generalised spatial modulation with multiple active transmit antennas
Fu, Jinlin, Hou, Chunping, Xiang, Wei, Yan, Lei and Hou, Yonghong. 2010. "Generalised spatial modulation with multiple active transmit antennas." IEEE Globecom Workshops (GLOBECOM 2010). Miami, United States 05 - 10 Dec 2010 United States. https://doi.org/10.1109/GLOCOMW.2010.5700442
Modeling of transmission distortion for multi-view video in packet lossy networks
Zhou, Yuan, Hou, Chunping and Xiang, Wei. 2010. "Modeling of transmission distortion for multi-view video in packet lossy networks." GLOBECOM 2010: IEEE Global Telecommunications Conference. Miami, United States 06 - 10 Dec 2010 United States. https://doi.org/10.1109/GLOCOM.2010.5683774
Design of a wireless portable vibration acquisition and analysis instrument
Wang, Gengkun, Xiang, Wei, Leis, John and Wang, Yafeng. 2010. "Design of a wireless portable vibration acquisition and analysis instrument." Chen, Wen and Li, Shaozi (ed.) 2010 IEEE International Conference on Wireless Communications, Networking and Information Security (WCNIS 2010). Beijing, China 25 - 27 Jun 2010 United States. https://doi.org/10.1109/WCINS.2010.5541747
An FPGA-based fast two-symbol processing architecture for JPEG 2000 arithmetic coding
Ramesh Kumar, Nandini, Xiang, Wei and Wang, Yafeng. 2010. "An FPGA-based fast two-symbol processing architecture for JPEG 2000 arithmetic coding." ICASSP 2010: 35th International Conference on Acoustics, Speech, and Signal Processing. Dallas, United States 14 - 19 Mar 2010 United States. https://doi.org/10.1109/ICASSP.2010.5495418
Iterative decision feedback equalizer with cyclic detection for DFT-S OFDM system
Wang, Yafeng, Yang, Hao, Yang, Dacheng and Xiang, Wei. 2010. "Iterative decision feedback equalizer with cyclic detection for DFT-S OFDM system." Computers and Electrical Engineering. 36 (4), pp. 789-801. https://doi.org/10.1016/j.compeleceng.2008.11.002
ICI reduction through shaped OFDM in coded MIMO-OFDM systems
Xiang, Wei, Russell, Julian and Wang, Yafeng. 2010. "ICI reduction through shaped OFDM in coded MIMO-OFDM systems." International Journal on Advances in Telecommunications. 3 (3 & 4), pp. 311-323.
Preliminary results on literature review skills of students doing capstone projects
Ku, Harry S. and Goh, Steven C.. 2010. "Preliminary results on literature review skills of students doing capstone projects." Goh, Steven C. and Wang, Hao (ed.) 2010 Southern Region Engineering Conference (SREC 2010). Toowoomba, Australia 11 - 12 Nov 2010 Toowoomba, Australia.
A review on the tensile properties of natural fiber reinforced polymer composites
Ku, H., Wang, H., Pattarachaiyakoop, N. and Trada, M.. 2011. "A review on the tensile properties of natural fiber reinforced polymer composites ." Composites Part B: Engineering. 42 (4), pp. 856-873. https://doi.org/10.1016/j.compositesb.2011.01.010
Thermal properties of sawdust reinforced vinyl ester composites post-cured in microwaves: a pilot study
Ku, H., Prajapati, M. and Cardona, F.. 2011. "Thermal properties of sawdust reinforced vinyl ester composites post-cured in microwaves: a pilot study ." Composites Part B: Engineering. 42 (4), pp. 898-906. https://doi.org/10.1016/j.compositesb.2011.01.008
Mitigation of electricity price/demand using demand side response smart grid model
Marwan, M., Kamel, F. and Xiang, W.. 2011. "Mitigation of electricity price/demand using demand side response smart grid model." Cowled, Craig J. L. (ed.) 1st International Postgraduate Conference on Engineering, Designing and Developing the Built Environment for Sustainable Wellbeing (eddBE 2011). Brisbane, Australia 27 - 29 Apr 2011 Brisbane, Australia.
An improved new error estimation algorithm for optimal filter lengths for stereophonic acoustic echo cancellation
Nguyen-Ky, T., Leis, J. and Xiang, W.. 2010. "An improved new error estimation algorithm for optimal filter lengths for stereophonic acoustic echo cancellation." Computers and Electrical Engineering. 36 (4), pp. 664-675. https://doi.org/10.1016/jcompeleceng.2008.11.012
Qualitative methodologies for dummies: engineers in investigating the quality of final year engineering research project
Goh, Steven and Ku, Harry. 2010. "Qualitative methodologies for dummies: engineers in investigating the quality of final year engineering research project." Hudson, Peter, Chandra, Vinesh, King, Donna and Lee, Kar-Tin (ed.) 1st Science, Technology, Engineering and Mathematics in Education Conference (STEM 2010). Brisbane, Australia 26 - 27 Nov 2010 Brisbane, Australia.
A demand-side response smart grid scheme to mitigate electrical peak demands and access renewable energy sources
Marwan, Marwan, Kamel, Fouad and Xiang, Wei. 2010. "A demand-side response smart grid scheme to mitigate electrical peak demands and access renewable energy sources ." 48th Annual Conference of the Australian Solar Energy Society (Solar 2010): Bringing Business and Research Together for a Better Tomorrow . Canberra, Australia 01 - 03 Dec 2010 Canberra, Australia.
Performance of user cooperation and clustering scheme in cellular networks
Li, Chang, Wang, Yafeng, Xiang, Wei and Yang, Dacheng. 2010. "Performance of user cooperation and clustering scheme in cellular networks." 2010 IEEE International Conference on Communications: Communications: Accelerating Growth and Development (ICC 2010). Capetown, South Africa 23 - 27 May 2010 Piscataway, United States. https://doi.org/10.1109/ICCW.2010.5503906
Joint power allocation and best-relay positioning for incremental selection amplify-and-forward relaying
Ran, Jie, Wang, Yafeng, Li, Chang, Yang, Dacheng and Xiang, Wei. 2010. "Joint power allocation and best-relay positioning for incremental selection amplify-and-forward relaying." 2010 IEEE Vehicular Technology Conference (VTC 2010-Fall). Ottawa, Canada 06 - 09 Sep 2010 Ottawa, Canada. https://doi.org/10.1109/VETECF.2010.5594116
2-D scalable multiple description coding for robust H.264/SVC video communications
Xiang, Wei, Zhu, Ce, Siew, Chee Kheong, Xu, Yuanyuan and Liu, Minglei. 2011. "2-D scalable multiple description coding for robust H.264/SVC video communications." Zhu, Ce, Li, Yuenan and Niu, Xiamu (ed.) Streaming media architectures, techniques, and applications: recent advances. Hershey, PA. United States. IGI Global. pp. 39-57
Effect of tannin on flexural properties of phenol formaldehyde glycerol reinforced composites: preliminary results
Cardona, F., Ku, H. and Chouzenoux, L.. 2010. "Effect of tannin on flexural properties of phenol formaldehyde glycerol reinforced composites: preliminary results ." Journal of Reinforced Plastics and Composites. 29 (24), pp. 3543-3553. https://doi.org/10.1177/0731684410381152
The design and investigation of model based internal model control for the regulation of hypnosis
Abdulla, Shahab, Wen, Peng and Xiang, Wei. 2010. "The design and investigation of model based internal model control for the regulation of hypnosis." Kuo, Way, Tsui, Lap Chee and Sung, Jao Yiu (ed.) IEEE/NANOMED 2010: Promoting Good Health with Nanotechnology. Hong Kong, China 05 - 09 Dec 2010 Hong Kong. https://doi.org/10.1109/NANOMED.2010.5749833
Work in Progress - Intervening to Improve the Dissertation of Final Year Engineering Research Projects
Goh, Steven and Ku, Harry. 2011. "Work in Progress - Intervening to Improve the Dissertation of Final Year Engineering Research Projects." 41st ASEE/IEEE Frontiers in Education Conference (FIE 2011): Celebrating 41 Years of Monumental Innovations from around the World. Rapid City, United States 12 - 15 Oct 2011 United States. https://doi.org/10.1109/FIE.2011.6142897
Using computer software packages to enhance the teaching in engineering management science: part 3 - simulation
Ku, H. and Fulcher, R.. 2012. "Using computer software packages to enhance the teaching in engineering management science: part 3 - simulation ." Computer Applications in Engineering Education. 20 (3), pp. 547-552. https://doi.org/10.1002/cae.20423
Using computer software packages to enhance the teaching in engineering management science: part 2 - programming techniques
Ku, H. and Fulcher, R.. 2012. "Using computer software packages to enhance the teaching in engineering management science: part 2 - programming techniques ." Computer Applications in Engineering Education. 20 ( 1), pp. 114-123. https://doi.org/10.1002/cae.20379
A pilot study on the flexural properties of vinyl ester composites filled with glass powder
Ku, H., Trada, M. and Huq, R.. 2010. "A pilot study on the flexural properties of vinyl ester composites filled with glass powder ." Advanced Materials Research. 123-125, pp. 3-6. https://doi.org/10.4028/www.scientific.net/AMR.123-125.3
Development of polymer network of phenolic and epoxies resins mixed with linseed oil: pilot study
Ku, H., Cardona, F., Rogers, D. and Munoz, J.-C.. 2010. "Development of polymer network of phenolic and epoxies resins mixed with linseed oil: pilot study ." Journal of Materials Engineering and Performance. 19 (6), pp. 912-919. https://doi.org/10.1007/s11665-009-9549-9
Final year engineering projects in Australia and Europe
Ku, H. and Goh, S.. 2010. "Final year engineering projects in Australia and Europe." European Journal of Engineering Education. 35 (2), pp. 161-173. https://doi.org/10.1080/03043790903497336
Optimum percentage of fly ash reinforcement in vinyl ester composites
Ku, H., Kota, V. and Trada, M.. 2010. "Optimum percentage of fly ash reinforcement in vinyl ester composites ." Journal of Materials in Civil Engineering. 22 (1), pp. 104-107. https://doi.org/10.1061/(ASCE)0899-1561(2010)22:1(104)
A lucrative export - engineering education: down under
Ross, David, Ku, Harry S. and Penfold, Peter. 2009. "A lucrative export - engineering education: down under." DIAS Technology Review. 5 (2), pp. 14-23.
Flexural properties of sawdust reinforced phenolic composites: pilot study
Ku, Harry Siu-Lung, Cardona, Francisco, Trada, Mohar and Vigier, Gurlaume. 2009. "Flexural properties of sawdust reinforced phenolic composites: pilot study." Journal of Applied Polymer Science. 114 (3), pp. 1927-1934. https://doi.org/10.1002/app.30610
Engineering education in China and Australia: addressing the demand-supply gap
Ku, Siu Lung Harry, Wen, Peng and Xiang, Wei. 2010. "Engineering education in China and Australia: addressing the demand-supply gap." Hong Kong Institution of Engineers, Transactions. 17 (2), pp. 20-26.
Flexural properties of phenolic resin reinforced with glass powder
Ku, Harry S., Trada, Mohan, Zong, Xuejin and Wong, Peter. 2009. "Flexural properties of phenolic resin reinforced with glass powder." Liao, W. H. (ed.) ICAST 2009: 20th International Conference on Adaptive Structures and Technologies . Shatin, Hong Kong 20 - 22 Oct 2009 Hong Kong.
Flexural strength of phenol formaldehyde composites post-cured in microwaves: preliminary results
Trada, Mohan, Ku, Harry and Vedhar, Jayant. 2009. "Flexural strength of phenol formaldehyde composites post-cured in microwaves: preliminary results ." Advanced Materials Research. https://doi.org/10.4028/www.scientific.net/AMR.79-82.1399
Teaching of critical path networks using software packages
Ku, H.. 2009. "Teaching of critical path networks using software packages ." Wen, Peng, Li, Yuefeng, Polkowski, Lech, Yao, Yiyu, Tsumoto, Shusaku and Wang, Guoyin (ed.) 4th International Conference on Rough Sets and Knowledge Technology (RSKT 2009). Gold Coast, Australia 14 - 16 Jul 2009 Berlin, Germany. Springer. https://doi.org/10.1007/978-3-642-02962-2_55
Error resilience analysis of wireless image transmission using JPEG, JPEG 2000 and JPWL
Xiang, Wei, Clemence, Andrew, Leis, John and Wang, Yafeng. 2009. "Error resilience analysis of wireless image transmission using JPEG, JPEG 2000 and JPWL." 7th International Conference on Information, Communications and Signal Processing (ICICS 2009). Macau, China 08 - 10 Dec 2009 Piscataway, NJ. United States. https://doi.org/10.1109/ICICS.2009.5397742
Mechatronic engineering by distance education
Fulcher, Robert and Snook, Chris. 2003. "Mechatronic engineering by distance education." Billingsley, John (ed.) 10th Annual Conference on Mechatronics and Machine Vision in Practice (MViP 2003). Perth, Australia 09 - 11 Dec 2003 Taunton, England.
Iterative source-channel decoding for robust image transmission
Xiang, Wei, Pietrobon, Steven S. and Barbulescu, Sorin Adrian. 2003. "Iterative source-channel decoding for robust image transmission." Kennedy, Rodney Andrew and Grant, Alex J. (ed.) 4th Australian Communications Theory Workshop (AusCTW 2003). Melbourne, Australia 05 - 07 Feb 2003 Canberra, ACT .
Fracture toughness of phenol formaldehyde composites reinforced with e-spheres
Ku, H., Cardona, F., Pattarachaiyakoop, N. and Trada, M.. 2009. "Fracture toughness of phenol formaldehyde composites reinforced with e-spheres ." Journal of Composite Materials. 43 (7), pp. 741-754. https://doi.org/10.1177/0021998308101296
Contrasts on fracture toughness and flexural strength of varying percentages of SLG-reinforced phenolic composites
Ku, H. S., Fok, S. C. and Siores, E.. 2009. "Contrasts on fracture toughness and flexural strength of varying percentages of SLG-reinforced phenolic composites." Journal of Composite Materials. 43 (8), pp. 885-895. https://doi.org/10.1177/0021998308103159
A simplified empirical model for prediction of mechanical properties of random short fiber/vinylester composites
Epaarachchi, J., Ku, H. and Gohel, K.. 2010. "A simplified empirical model for prediction of mechanical properties of random short fiber/vinylester composites." Journal of Composite Materials. 44 (6), pp. 779-788. https://doi.org/10.1177/0021998309346383
Flexural tests of phenol formaldehyde and SLG composites: pilot study
Cardona, F., Rogers, D., Gurney, R., Trada, M. and Ku, H.. 2009. "Flexural tests of phenol formaldehyde and SLG composites: pilot study ." Journal of Reinforced Plastics and Composites. 28 (22), pp. 2761-2769. https://doi.org/10.1177/0731684408093871
Face Detection Technique Based on Skin Color and Facial Features
Alajel, K. M., Xiang, W. and Lies, John. 2010. "Face Detection Technique Based on Skin Color and Facial Features." 9th WSEAS International Conference on Signal Processing, Robotics and Automation (ISPRA'10). England 20 - 22 Feb 2009 World Scientific and Engineering Academy and Society.
Performance of co-operative relay for multicast multi-hop networks using virtual MIMO
Adnan, Muhammad, She, Haoqiu, Wang, Yafeng, Yang, Dacheng and Xiang, Wei. 2009. "Performance of co-operative relay for multicast multi-hop networks using virtual MIMO." IEEE International Conference on Advanced Infocomm Technology (ICAIT09). Xi'an, China 07 - 09 Jul 2009 Piscataway, NJ.
Self-adapting cyclic delay diversity system
Zheng, Aoyang, Wang, Yafeng, Yang, Dacheng and Xiang, Wei. 2009. "Self-adapting cyclic delay diversity system." Wen, Peng, Li, Yuefeng, Polkowski, Lech, Yao, Yiyu, Tsumoto, Shusaku and Wang, Guoyin (ed.) 4th International Conference on Rough Sets and Knowledge Technology (RSKT 2009). Gold Coast, Australia 14 - 16 Jul 2009 Berlin, Germany. https://doi.org/10.1007/978-3-642-02962-2_69
Pulse shaping in MIMO COFDM over Rayleigh fading channels
Russell, Julian and Xiang, Wei. 2009. "Pulse shaping in MIMO COFDM over Rayleigh fading channels." Gui, Xiang and Popescu, Manuela (ed.) ICWMC 2009: 5th International Conference on Wireless and Mobile Communications. Cannes, France 23 - 29 Aug 2009 Los Alamitos, CA. United States. https://doi.org/10.1109/ICWMC.2009.36
Use of wireless tablet PCs as an effective learning and teaching enhancement tool
Xiang, Wei, Goh, Steven, Pather, Selvan, Maxwell, Andrew, Wang, Hao and Ku, Harry. 2009. "Use of wireless tablet PCs as an effective learning and teaching enhancement tool." Foley, Chris (ed.) EDUCAUSE Australasia Conference 2009: Innovate, Collaborate and Sustain. Perth, Australia 03 - 06 May 2009 Wembley, Western Australia.
Automated vehicle classification system for AUSTROADS standard based upon laser sensor technology
Xiang, Wei, Otto, Colin W. and Wen, Peng. 2009. "Automated vehicle classification system for AUSTROADS standard based upon laser sensor technology." Australian Journal of Electrical and Electronics Engineering. 5 (2), pp. 95-106.
Mathematical modeling of the fracture toughness of phenol formaldehyde composites reinforced with E-spheres
Ku, H., Xiang, W. and Pattarachaiyakoop, N.. 2009. "Mathematical modeling of the fracture toughness of phenol formaldehyde composites reinforced with E-spheres ." Advanced Materials Research. 79-82, pp. 1165-1168. https://doi.org/10.4028/www.scientific.net/AMR.79-82.1165
Fast tracking new courses in mechatronic engineering
Fulcher, Robert L. and Snook, Christopher P.. 2000. "Fast tracking new courses in mechatronic engineering." Billingsley, John (ed.) Mechatronics and machine vision. Baldock, United Kingdom. Research Studies Press. pp. 3-9
Model-based networked control system stability based on packet drop distributions
Teng, Lanzhi, Wen, Peng and Xiang, Wei. 2008. "Model-based networked control system stability based on packet drop distributions." Wen, Changyun and Pham, Thuong Cat (ed.) 10th International Conference on Control, Automation, Robotics and Vision (ICARCV 2008). Hanoi, Vietnam 17 - 20 Dec 2008 Piscataway, NJ. United States. https://doi.org/10.1109/ICARCV.2008.4795567
Tensile tests of phenol formaldehyde SLG reinforced composites: pilot study
Ku, H., Jacobson, W., Trada, M., Cardona, F. and Rogers, D.. 2008. "Tensile tests of phenol formaldehyde SLG reinforced composites: pilot study." Journal of Composite Materials. 42 (26), pp. 2783-2793. https://doi.org/10.1177/0021998308096334
Relationship between electrical and mechanical loss tangents of SLG reinforced phenolic composites: pilot study
Ku, H., Cardona, F., Ball, J., Jacobson, W. and Trada, M.. 2008. "Relationship between electrical and mechanical loss tangents of SLG reinforced phenolic composites: pilot study ." Journal of Composite Materials. 42 (19), pp. 2083-2095. https://doi.org/10.1177/0021998308094548
Hong Kong Higher Diploma in Engineering and Australian Bachelor of Technology in Engineering: similarities and differences
Morgan, Michael J., Fulcher, Robert and Ku, Harry S.. 1996. "Hong Kong Higher Diploma in Engineering and Australian Bachelor of Technology in Engineering: similarities and differences." Asia Engineer.
Articulation, credit transfer and flexible delivery of engineering degree courses: Australia, Malaysia and Hong Kong
Morgan, M. J., Fulcher, R. L. and Ku, H. S.. 1998. "Articulation, credit transfer and flexible delivery of engineering degree courses: Australia, Malaysia and Hong Kong." Jurutera: Institution of Engineers Malaysia Monthly Bulletin. 1998 (1), pp. 57-67.
Innovative residential schools for engineering degree courses
Morgan, Michael J., Fulcher, Robert and Ku, Harry S.. 1999. "Innovative residential schools for engineering degree courses ." Quarterly Journal of Singapore Institute of Engineering Technologists. 18 (4), pp. 53-58.
Loss tangent for low loss thermoplastic composites
Ku, Harry S., Ball, James A. R., Siores, Elias and Chan, Peter. 1999. "Loss tangent for low loss thermoplastic composites ." Science and Engineering of Composite Materials. 8 (3), pp. 123-128.
Microwave facilities for welding thermoplastic composites and preliminary results
Ku, Harry S., Siores, Elias and Ball, James A. R.. 1999. "Microwave facilities for welding thermoplastic composites and preliminary results." Journal of Microwave Power and Electromagnetic Energy. 34 (4), pp. 195-205.
Variable frequency microwave (VFM) processing facilities and application in processing thermoplastic matrix composites
Ku, Harry S., Siu, Fred, Siores, Elias, Ball, James A. R. and Blicblau, A. S.. 2000. "Variable frequency microwave (VFM) processing facilities and application in processing thermoplastic matrix composites ." Lee, W. B. (ed.) IMCC'2000: 9th International Manufacturing Conference in China: Innovation and Technology for the New Millennium. Hong Kong, China 16 - 17 Aug 2000 Hong Kong.
Microwave processing and permittivity measurement of thermoplastic composites at elevated temperature
Ku, Harry S., Ball, James A. R., Siores, Elias and Horsfield, Brendan. 1999. "Microwave processing and permittivity measurement of thermoplastic composites at elevated temperature ." Journal of Materials Processing Technology. 89-90, pp. 419-424. https://doi.org/10.1016/S0924-0136(99)00018-7
An important step in microwave processing of materials: permittivity measurements of thermoplastic composites at elevated temperatures
Ku, Harry S., Siores, Elias, Ball, James A. R. and Horsfield, Brendan. 1998. "An important step in microwave processing of materials: permittivity measurements of thermoplastic composites at elevated temperatures." Salem, Sam (ed.) 1998 Pacific Conference on Manufacturing. Brisbane, Australia 18 - 21 Aug 1998 Brisbane, Australia.
Characterisation of thermoplastic matrix composites (TPC) using variable frequency micorwave (VFM)
Ku, Harry S., MacRobert, Martin, Siores, Elias and Ball, James A. R.. 2000. "Characterisation of thermoplastic matrix composites (TPC) using variable frequency micorwave (VFM)." Plastics Rubber and Composites. 29 (6), pp. 285-287.
Variable frequency microwave processing of thermoplastic composites
Ku, Harry S., MacRobert, Martin, Siores, Elias and Ball, James A. R.. 2000. "Variable frequency microwave processing of thermoplastic composites ." Plastics Rubber and Composites. 29 (6), pp. 278-284.
Effects of catalysts and post-curing conditions in the polymer network of epoxy and phenolic resins: preliminary results
Munoz, J.-C., Ku, H., Cardona, F. and Rogers, D.. 2008. "Effects of catalysts and post-curing conditions in the polymer network of epoxy and phenolic resins: preliminary results ." Journal of Materials Processing Technology. 202 (1-3), pp. 486-492. https://doi.org/10.1016/j.jmatprotec.2007.10.025
Experiences in implementing a postgraduate engineering management program
Thorpe, David and Fulcher, Robert. 2007. "Experiences in implementing a postgraduate engineering management program." Søndergaard, Harald and Hadgraft, Roger (ed.) 18th Annual Conference of the Australasian Association for Engineering Education (AAEE 2007). Melbourne, Australia 09 - 13 Dec 2007 Melbourne, Australia.
Fracture toughness of phenol formaldehyde composites: pilot study
Ku, Harry, Rogers, David, Davey, Robert, Cardona, Francisco and Trada, Mohan. 2008. "Fracture toughness of phenol formaldehyde composites: pilot study." Journal of Materials Engineering and Performance. 17 (1), pp. 85-90. https://doi.org/10.1007/s11665-007-9115-2
Contrast joints of glass-fibre with carbon-fibre reinforced low density polyethylene composite bonded by microwave irradiation
Ku, H. S.. 2008. "Contrast joints of glass-fibre with carbon-fibre reinforced low density polyethylene composite bonded by microwave irradiation." Journal of Electromagnetic Waves and Applications. 22 (1), pp. 69-84. https://doi.org/10.1163/156939308783122760
Processing of composites using variable and fixed frequency microwave facilities
Ku, Harry S. and Yusaf, Talal. 2008. "Processing of composites using variable and fixed frequency microwave facilities." Progress in Electromagnetic Research B. 5, pp. 185-205. https://doi.org/10.2528/PIERB08011304
Shrinkage reduction of thermoset fibre composites during hardening using microwaves irradiation for curing
Ku, Harry S., Van Erp, Gerard, Ball, James A. R., Ayers, Stephen R. and Siu, Fred. 2002. "Shrinkage reduction of thermoset fibre composites during hardening using microwaves irradiation for curing." Wong, S. V., Osman, M. R., Yusuff, R. M. and Ismail, N. (ed.) 2nd World Engineering Congress (WEC 2002). Sarawak, Malaysia 22 - 25 Jul 2002 Malaysia.
An evaluation of fracture toughness of vinyl ester composites cured under microwave conditions
Ku, H., Chan, W. L., Trada, M. and Baddeley, D.. 2007. "An evaluation of fracture toughness of vinyl ester composites cured under microwave conditions." Journal of Materials Engineering and Performance. 16 (6), pp. 741-745. https://doi.org/10.1007/s11665-007-9104-5
Managing the delivery of 'Manufacturing Processes' in an Australian regional university known for excellence in e-learning
Ross, David and Ku, Harry S.. 2007. "Managing the delivery of 'Manufacturing Processes' in an Australian regional university known for excellence in e-learning ." Delhi Institute of Advanced Studies Technology Review. 4 (1), pp. 46-54.
Agent-based composable simulation for virtual prototyping of fluid power system
Xiang, Wei, Fok, Sai Cheong and Thimm, Georg. 2004. "Agent-based composable simulation for virtual prototyping of fluid power system." Computers in Industry. 54 (3), pp. 237-251. https://doi.org/10.1016/j.compind.2003.12.001
Relationship between microwave irradiation and constituents of composites during joining process
Ku, H. S., Ball, J. A. R. and Siores, E.. 2000. "Relationship between microwave irradiation and constituents of composites during joining process." Transactions, Hong Kong Institution of Engineers. 7 (3), pp. 43-49. https://doi.org/10.1080/1023697X.2000.10667833
Turbo diversity scheme applied to JPEG image transmission
Xiang, Wei and Barbulescu, S. Adrian. 2003. "Turbo diversity scheme applied to JPEG image transmission." IEEE International Symposium on Intelligent Signal Processing and Communication Systems (ISPACS 2002). Kaohsiung,Taiwan 2002 Piscataway, NJ. United States.
EXIT chart analysis of iteratively decodable source codes for wireless multimedia communications
Xiang, Wei and Leis, John W.. 2005. "EXIT chart analysis of iteratively decodable source codes for wireless multimedia communications." Wysocki, B. and Wysocki, T. (ed.) DSPCS/WITSP 2005: 4th Workshop on the Internet, Telecommunications and Signal Processing (WITSP2005). Noosa, Australia 19 - 21 Dec 2005 Sydney, Australia.
An agent-based framework for the virtual prototyping of fluid power systems
Georg, T., Xiang, W. and Fok, Sai-Cheong. 2003. "An agent-based framework for the virtual prototyping of fluid power systems." Stecki, Jacek S. (ed.) 1st International Conference on Computational Methods in Fluid Power Technology: Methods for Solving Practical Problems in Design and Control. Melbourne, Australia 26 - 28 Nov 2003 Melbourne, Australia.
Applications of microwaves in non-destructive testing
Ku, H. S., Siu, F., Siores, E. and Ball, J. A. R.. 2001. "Applications of microwaves in non-destructive testing." 10th Asia Pacific Conference on Non-Destructive Testing (2001). Brisbane, Australia 17 - 21 Sep 2001 Melbourne, Australia.
Unequal error protection applied to JPEG image transmission using turbo codes
Xiang, Wei, Barbulescu, Sorin Adrian and Pietrobon, Steven S.. 2001. "Unequal error protection applied to JPEG image transmission using turbo codes." 2001 IEEE Information Theory Workshop (ITW'01). Cairns, Australia 02 - 07 Sep 2001
The process of updating engineering management science in an Australian regional university excellence in developing e-learning
Ku, Harry S. and Fulcher, Robert. 2007. "The process of updating engineering management science in an Australian regional university excellence in developing e-learning ." European Journal of Engineering Education. 32 (5), pp. 527-538. https://doi.org/10.1080/03043790701433319
Joint source-channel codec: a more power efficient technology for image transmission
Xiang, Wei, Pietrobon, Steven S. and Barbulescu, Steven. 2003. "Joint source-channel codec: a more power efficient technology for image transmission." Jago, C., Amis, K. and Berrou, C. (ed.) 3rd International Symposium on Turbo Codes. Brest, France 01 - 05 Sep 2003 Brest, France.
Iterative decoding of JPEG coded images with channel coding
Xiang, Wei, Pietrobon, Steven S. and Barbulescu, Sorin Adrian. 2003. "Iterative decoding of JPEG coded images with channel coding." 10th IEEE International Conference on Telecommunications. Papeete, Tahiti Feb 2003 https://doi.org/10.1109/ICTEL.2003.1191632
On the capacity and normalisation of ISI channels
Xiang, Wei and Pietrobon, Steven S.. 2003. "On the capacity and normalisation of ISI channels." 2003 IEEE International Conference on Communications (ICC2003). Alaska, United States of America 11 - 15 May 2003 United States.
Fracture toughness of phenol formaldehyde composites post-cured in microwaves
Cardona, F., Ku, H., Pattarachaiyakoop, N., Rogers, D. and Trada, M.. 2007. "Fracture toughness of phenol formaldehyde composites post-cured in microwaves." Journal of Electromagnetic Waves and Applications. 21 (14), pp. 2137-2146. https://doi.org/10.1163/156939307783152867
Characterisation of chip-on-board (COB) encapsulate epoxies used in the printed circuit board assembly (PCBA) industry using variable frequency microwave (VFM) facilities
Ku, H. S., Siu, F., Mok, P. L., Siores, E. and Ball, J. A. R.. 2002. "Characterisation of chip-on-board (COB) encapsulate epoxies used in the printed circuit board assembly (PCBA) industry using variable frequency microwave (VFM) facilities." Wong, S. V., Osman, M. R., Yusuff, R. M. and Ismail, N. (ed.) 2nd World Engineering Congress (WEC 2002). Sarawak, Malaysia 22 - 25 Jul 2002 Selangor Darul Ehsan, Malaysia.
Applications of fixed and variable frequency microwave (VFM) facilities in polymeric materials processing and joining
Ku, H. S., Siu, F., Siores, E. and Ball, J. A. R.. 2002. "Applications of fixed and variable frequency microwave (VFM) facilities in polymeric materials processing and joining ." Wong, S. V., Osman, M. R., Yusuff, R. M. and Ismail, N. (ed.) 2nd World Engineering Congress (WEC 2002). Sarawak, Malaysia 22 - 25 Jul 2002 Selangor Darul Ehsan, Malaysia.
Contrast joints of glass-fibre with carbon-fibre reinforced polystyrene composite bonded by microwave irradiation
Ku, Harry S.. 2003. "Contrast joints of glass-fibre with carbon-fibre reinforced polystyrene composite bonded by microwave irradiation ." Transactions, Hong Kong Institution of Engineers. 10 (2), pp. 10-16.
Review - microwave processing of materials: part III
Ku, Harry S., Siores, Elias and Ball, James A. R.. 2001. "Review - microwave processing of materials: part III." Transactions, Hong Kong Institution of Engineers. 8 (3), pp. 44-50.
Review - microwave processing of materials: part II
Ku, Harry S., Siores, Elias and Ball, James A. R.. 2001. "Review - microwave processing of materials: part II." Transactions, Hong Kong Institution of Engineers. 8 (3), pp. 38-43.
Review - microwave processing of materials: part I
Ku, Harry S., Siores, Elias and Ball, James A. R.. 2001. "Review - microwave processing of materials: part I." Transactions, Hong Kong Institution of Engineers. 8 (3), pp. 31-37.
Permittivity measurement of thermoplastic composites at elevated temperature
Ku, Harry S., Horsfield, Brendan, Ball, James A. R. and Siores, Elias. 2001. "Permittivity measurement of thermoplastic composites at elevated temperature." Journal of Microwave Power and Electromagnetic Energy. 36 (2), pp. 101-111.
Applications of fixed and variable frequency microwave (VFM) facilities in polymeric materials processing and joining
Ku, H. S., Siu, F., Siores, E., Ball, J. A. R. and Blicblau, A. S.. 2001. "Applications of fixed and variable frequency microwave (VFM) facilities in polymeric materials processing and joining." 5th Asia Pacific Conference on Materials Processing. Seoul, South Korea 25 Jun 2001 Lausanne, Switzerland. https://doi.org/10.1016/S0924-0136(01)00642-2
Heat distribution and thermal analysis of joining thermoplastic composites using microwave energy
Ku, Harry S., Li, Chun Wai and Lee, Kin Fung. 2002. "Heat distribution and thermal analysis of joining thermoplastic composites using microwave energy." Institution of Engineers, Malaysia. Journal. 64 (2), pp. 6-12.
Microwave energy effects on polymer-matrix and fibre reinforcement of composites during bonding process by microwaves
Ku, Harry S., Siores, Elias and Ball, James A. R.. 2002. "Microwave energy effects on polymer-matrix and fibre reinforcement of composites during bonding process by microwaves." Institution of Engineers, Malaysia. Journal. 63 (4), pp. 20-27.
Lap shear strength comparison between two types of random carbon fibre reinforced thermoplastic matrix composites bonded using variable frequency microwaves (VFM) irradiation
Ku, Harry S., Siores, Elias and Ball, James A. R.. 2002. "Lap shear strength comparison between two types of random carbon fibre reinforced thermoplastic matrix composites bonded using variable frequency microwaves (VFM) irradiation." Journal of Materials Synthesis and Processing. 9 (6), pp. 353-361.
Joining of thirty three percent by weight random glass fibre reinforced polystyrene using variable frequency microwave
Ku, Harry S., Siores, Elias, Ball, James A. R. and Taube, Alex. 2002. "Joining of thirty three percent by weight random glass fibre reinforced polystyrene using variable frequency microwave." Institution of Engineers, Malaysia. Journal. 63 (2), pp. 18-24.
Risks involved in curing vinyl ester resins using microwaves irradiation
Ku, Harry S.. 2002. "Risks involved in curing vinyl ester resins using microwaves irradiation." Journal of Materials Synthesis and Processing. 10 (2), pp. 97-106.
Productivity improvements through the use of industrial microwave technologies
Ku, Harry S., Siores, Elias, Taube, Alex and Ball, James A. R.. 2002. "Productivity improvements through the use of industrial microwave technologies." Computers and Industrial Engineering. 42 (2-4), pp. 281-290.
Curing vinyl ester particle-reinforced composites using microwaves
Ku, H.. 2003. "Curing vinyl ester particle-reinforced composites using microwaves." Journal of Composite Materials. 37 (22), pp. 2027-2042. https://doi.org/10.1177/0021998303036266
Thermal analysis comparison between two random glass fibre reinforced thermoplastic matrix composites bonded by adhesives using microwaves: preliminary results
Ku, Harry S., Lee, Kin Fung and Li, Chun Wai. 2003. "Thermal analysis comparison between two random glass fibre reinforced thermoplastic matrix composites bonded by adhesives using microwaves: preliminary results." Journal of Electromagnetic Waves and Applications. 17 (6), pp. 901-918. https://doi.org/10.1163/156939303322503501
Thermal analysis of joining thermoplastic matrix composites using microwaves
Ku, Harry S., Lee, Kin Fung and Li, Chun Wai. 2003. "Thermal analysis of joining thermoplastic matrix composites using microwaves." Transactions, Hong Kong Institution of Engineers. 10 (1), pp. 14-20.
Lap shear strength comparison between different random glass fibre reinforced thermoplastic matrix composites bonded by adhesives using variable frequency microwaves (VFM) irradiation
Ku, Harry S., Siores, Elias, Ball, James A. R., Taube, Alex and Siu, Fred. 2003. "Lap shear strength comparison between different random glass fibre reinforced thermoplastic matrix composites bonded by adhesives using variable frequency microwaves (VFM) irradiation." Proceedings of the Institution of Mechanical Engineers Part L: Journal of Materials, Design and Applications. 217 (1), pp. 65-75.
Joining of thirty three percent by weight random carbon fibre reinforced low density polyethylene using variable frequency microwave
Ku, Harry S.. 2003. "Joining of thirty three percent by weight random carbon fibre reinforced low density polyethylene using variable frequency microwave ." Journal of The Institution of Engineers, Singapore. 43 (1), pp. 20-25.
Thermal analysis of joining Nylon 66 composites using microwave irradiations
Ku, Harry S., Widjaya, Budiman, Lee, Kin Fung and Li, Chun Wai. 2003. "Thermal analysis of joining Nylon 66 composites using microwave irradiations." Transactions of the Canadian Society for Mechanical Engineering. 27 (3), pp. 259-278.
Shrinkage reduction of thermoset matrix particle reinforced composites during curing using microwaves irradiation
Ku, Harry S. and Siores, Elias. 2004. "Shrinkage reduction of thermoset matrix particle reinforced composites during curing using microwaves irradiation." Transactions, Hong Kong Institution of Engineers. 11 (3), pp. 29-34.
A power and bandwidth efficient remote wireless video surveillance system using joint source-channel coding
Xiang, Wei. 2006. "A power and bandwidth efficient remote wireless video surveillance system using joint source-channel coding." Billingsley, John (ed.) 13th Annual Conference on Mechatronics and Machine Vision in Practice. (M2VIP 2006). Toowoomba, Australia 05 - 07 Dec 2006 Manila, Philippines.
Productivity improvement of composites processing through the use of industrial microwave technologies
Ku, Harry S.. 2006. "Productivity improvement of composites processing through the use of industrial microwave technologies." Progress in Electromagnetics Research (PIER). 66, pp. 267-285. https://doi.org/10.2528/PIER06111901
Young's modulus of vinyl ester composites cured by microwave irradiation: preliminary results
Ku, Harry S., Puttgunta, V. C. and Trada, Mohan. 2006. "Young's modulus of vinyl ester composites cured by microwave irradiation: preliminary results." Journal of Electromagnetic Waves and Applications. 20 (14), pp. 1911-1924. https://doi.org/10.1163/156939306779322675
Mechanical properties of vinyl ester composites cured by microwave irradiation: pilot study
Ku, H., Trada, M. and Puttgunta, V. C.. 2007. "Mechanical properties of vinyl ester composites cured by microwave irradiation: pilot study." Key Engineering Materials. 334-33, pp. 537-540. https://doi.org/10.4028/www.scientific.net/KEM.334-335.537
Yield and tensile strength of vinyl ester composites cured by microwaves
Ku, H., Trada, M., Puttgunta, V. C. and Kota, V.. 2007. "Yield and tensile strength of vinyl ester composites cured by microwaves ." Journal of Electromagnetic Waves and Applications. 21 (4), pp. 517-526. https://doi.org/10.1163/156939307780616847
Design of multi-purpose carbide end mill
Ku, Harry S. and Chia, Wee Chong. 2006. "Design of multi-purpose carbide end mill." Institution of Engineers, Malaysia. Journal. 67 (2), pp. 34-40.
Educating engineers for a sustainable future
Thorpe, David and Fulcher, Robert. 2005. "Educating engineers for a sustainable future ." Thorpe, David, Yadav, Umapati, Snook, Chris and Liang, George (ed.) 2005 Southern Region Engineering Conference (SREC 2005). Toowoomba, Australia 15 Oct 2005 Toowoomba, Australia.
Thermal analysis comparison between three random glass fibre-reinforced thermoplastic matrix composites bonded by adhesives using microwaves
Ku, Harry S., Widjaya, Budiman, Lee, Kin Fung and Li, Chun Wai. 2004. "Thermal analysis comparison between three random glass fibre-reinforced thermoplastic matrix composites bonded by adhesives using microwaves ." Journal of Reinforced Plastics and Composites. 23 (3), pp. 1443-1460.
Exit chart analysis of parallel data convolutional codes
Xiang, Wei, Pietrobon, Steven S. and Leis, John. 2005. "Exit chart analysis of parallel data convolutional codes." Ohta, Naohisa (ed.) 2005 International Symposium on Intelligent Signal Processing and Communication Systems (ISPACS 2005). Hong Kong, China 13 - 16 Dec 2005 Hong Kong.
A new class of parallel data convolutional codes
Xiang, Wei and Pietrobon, Steven S.. 2005. "A new class of parallel data convolutional codes." AusCTW 2005: 6th Australian Communications Theory Workshop. Brisbane, Australia 02 - 04 Feb 2005 Brisbane, Australia.
Contrast joints of glass-fibre with carbon-fibre reinforced low density polyethylene composite bonded by microwave irradiation
Ku, Harry S.. 2005. "Contrast joints of glass-fibre with carbon-fibre reinforced low density polyethylene composite bonded by microwave irradiation." Journal of Reinforced Plastics and Composites. 24 (10), pp. 1035-1049. https://doi.org/10.1177/0731684405048203
Application of variable frequency microwave (VFM) to adhesives
Ku, Harry S., Siores, Elias and Ball, James A. R.. 2005. "Application of variable frequency microwave (VFM) to adhesives." Journal of Electromagnetic Waves and Applications. 19 (11), pp. 1467-1484.
A review of teaching strategies in practical work for mechanical and mechatronic engineering students studying via on-campus and distance education
Snook, Chris and Fulcher, Bob. 2002. "A review of teaching strategies in practical work for mechanical and mechatronic engineering students studying via on-campus and distance education." Shankar, K. and Burrowes, G. (ed.) 13th Annual Conference of the Australasian Association for Engineering Education (AAEE 2002). Canberra, Australia 30 Sep - 03 Oct 2002 Canberra, Australia.